Laserfiche WebLink
5.1. <br />Public Works Committee <br />Meeting Date: 03/18/2025 <br />Primary Strategic Plan Initiative: Address infrastructure needs. <br />Title: <br />Consider Recommending City Council Approving Plans and Specifications and Authorizing Advertisement for <br />Bids for Dickenson's Mississippi Estates Street Reconstructions, Improvement Project #25-04 <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to consider recommending City Council approving plans and specifications and <br />authorizing advertisement for bids for Dickenson's Mississippi Estates Street Reconstructions, Improvement <br />Project #25-04. <br />Background: <br />The 2024 — 2033 Capital Improvement Program (CIP) identifies the streets within the Dickenson's Mississippi <br />Estate subdivision for street reconstruction in 2025. A street segment summary for this project is attached to <br />this case. <br />Existing Conditions <br />This project proposes to reconstruct Tungsten Street between Riverdale Drive and Rivlyn Avenue, as well as <br />Rivlyn Avenue between the western cul-de-sac and the eastern edge of plat. The streets are 31-foot wide urban <br />section with concrete curb and gutter. Tungsten Street has commercial use on both sides, while Rivlyn Avenue <br />is residential, with single-family homes. Though only marked by signage rather than pavement markings or off- <br />street trail facilities, the streets are part of the Mississippi River Trail Bikeway. The streets total 0.26 miles in <br />length. <br />Municipal sewer, watermain and storm sewer exist within the project area. The watermain and sanitary sewer <br />were installed in 1990, making it 35 years old when the street reconstruction will occur, and 95 years old by the <br />end of the streets 60-year design life. <br />During the Ramsey Gateway Highway 10 Improvements, it was found that the watermain gate valves were <br />built with mild steel bolts rather than stainless steel as is used today. This has resulted in premature eroding of <br />the valve bolts, which in recent years have separated when the valves are exercised requiring emergency repairs <br />to replace the valves and repair the streets. <br />The sanitary sewer and storm sewer were televised to determine the condition of the pipes and structures. The <br />sanitary sewer was found to be in good condition. The storm sewer under the streets was found to be in good <br />condition. The storm sewer outlet pipe to the Mississippi River was found to have some minor damage, which <br />is not proposed to be addressed with this street reconstruction project but will be addressed under a separate <br />project at a later time. <br />The CIP includes addressing stormwater runoff from 6140 Highway 10 as part of this project. As part of this <br />project, an analysis of stormwater runoff from 6140 Highway 10 was performed, and a connection to the <br />existing City storm sewer system as well as on -site stormwater management is required to address the runoff. <br />Project History <br />• May 28, 2024, the Ramsey City Council adopted Resolution #24-138, ordering requests for proposals for <br />topographic surveys, geotechnical evaluations and utility testing for 2025 capital improvement program <br />projects. <br />