Laserfiche WebLink
operations. There will be no changes to the existing building on the Subject Property as part of this application. <br />To comply with Fire Department regulations, the Applicant is also proposing to install bollards and a six -foot -tall <br />fence around the two above -ground fuel tanks. The fence will have gates that open to the west, east, and south, to <br />allow for vehicular access and snow removal. Additionally, the access road and paved storage area will be <br />installed to accommodate the storage of above -ground fuel tanks, per Fire Code requirements. This installation of <br />paved surfacing will decrease the area used for the storage and processing of demolition concrete and bituminous. <br />Since the Applicant is proposing to make substantial site improvements to the Subject Property, a Site Plan <br />review is required with a recommendation from the Planning Commission and final approval from the City <br />Council. Additionally, since this application involves the use of fuel storage, the Fire Marshal has been intensively <br />involved in the review process and has worked with the Applicant to bring their plans into compliance with Fire <br />Code. <br />The plan set and Staff review comments at the time of writing this case, along with Resolution #23-235 to <br />approve both the Site Plan and CUP, are attached for review. <br />Access & Parking <br />Access to the site is provided via two driveways onto 141st Avenue NW. The proposed access road and paved <br />storage area will be an extension of the existing paved area on the north side of the principal building on site. <br />There will be no change in access to 141st Avenue NW, and there will be no change in parking requirements for <br />the Subject Property with this project. <br />Staff Comments <br />This CUP would allow for the construction and operation of two above -ground fuel tanks, storage of empty <br />above -ground fuel tanks, an access road, and paved storage area on the Subject Property, in accordance with <br />the E-2 Employment District standards. All of these items require a Site Plan Review as well as the CUP. As <br />noted above, the above -ground fuel tanks were already installed without first obtaining permits from the Fire <br />Department or obtaining a CUP. Thus, this CUP is intended to retroactively bring the Applicant into compliance <br />with City Code. Staff are open to additional conditions that the Planning Commission may desire to incorporate. <br />A copy of Resolution #23-235 approving both the Site Plan and CUP is attached for review. <br />At the time of the case writing, the first and second rounds of review from City Staff have been fully conducted. <br />As part of reviewing the application, Staff inspected the site and noticed an accumulation of junk and debris. <br />Additionally, staff noticed that the existing stockpiles exceeded the height and area requirements outlined in the <br />previously -approved CUP. The Applicant shall bring these items into compliance with City Code and the terms of <br />their existing CUP before issuance of the new CUP can take place. <br />The only remaining items to be addressed in Applicant's submittal relate to Engineering staffs requirements for <br />corrected verbiage in the stormwater report, and adding match lines and turning templates to the paving plan. <br />Engineering staff are currently working on their review of resubmitted plans, received from the applicant on <br />September 6th, which may address the outstanding items. <br />As mentioned above, Staff review comments are attached to this case. <br />Public Correspondence <br />At the time of the case writing, staff have not received any comments or questions regarding the application. <br />Alternatives <br />Alternative 1: Recommend the City Council approve the Site Plan and Conditional Use Permit as proposed. Open <br />and Outdoor Storage as a Principal Use is a conditional use in the E-2 Employment District and the proposed Site <br />Plan appears to meet the bulk standards of this district. The request is a reasonable industrial use of the Subject <br />Property. <br />Alternative 2: Recommend the City Council approve the Site Plan and Conditional Use Permit with additional <br />changes based on Planning Commission discussion. <br />