Laserfiche WebLink
Site Plan Approve <br />DEHN OIL COMPANY -SITE IMPROVEMENTS <br />6651 141st AVENUE NW - RAMSEY, MINNESOTA <br />6750 143rd AVE. NW <br />PID: 27-32-25-43-0017 <br />T0 =8656 <br />N= 858.7 5 <br />V60.A N <br />v-86o.] E <br />6 FT CHAIN LINK FENCE <br />-am gam <br />i -859- - <br />--B58-t-- <br />EDGE OF BAT <br />MV=8566 <br />G R AVE L <br />14191 EBONY ST. NW <br />PID: 27-32-25-43-0023 GR <br />SNN <br />=8585 <br />CO <br />TCP=668.8 <br />INV-559.9 N,SW <br />6751 141st AVE. NW <br />PID: 27-32-25-43-9901 <br />-8-PVC SAN S (P <br />NORTH <br />A <br />�,2 <br />nwta7so4 <br />15 <br />TOPG6 <br />=B69 a <br />iNV=88i � <br />FOUND P,5 17551 <br />0us/Ou w <br />0OIP W(P <br />17-PCP sr <br />C8 <br />TOP6709 <br />BITUMINOUS <br />NP T865 - <br />i =8630 <br />6650 143rd AVE. NW <br />PID: 27-32-25-43-0018 <br />FOUND Pis 194z0 � - - - - - N89_3171I'� - _ <br />a17 NO.i5 E G R ASS <br />--856--- <br />CB =8)h 8 <br />INV=858.1 N.5 <br />CONCRETE <br />EXISTING <br />STOCKPILE <br />SITE PLAN <br />GAS <br />- - - - - S89254' -6�E- -52-s.-eo- - - - <br />/////// <br />EXISTING BU/GOING <br />PONDEXISTING STORMWATER POND ULYR E2E023TION = 857.3 FEET <br />DRAINAGE AND UTILITY EASEMENT PER PLAT OF GATEWAY NORTH INDUSTRIAL PARK NO 5 <br />Ti III.,% <br />ACCESS ROADS <br />19,260 sq. ft. <br />BITUMINOUS <br />PAVEMENT <br />/�/��//�/il S T V K P I L E\\\\\\,VA\\\\ / <br />/// // may\\\\\ �\ \�\\\ <br />III/��ir _ _ ���\\\\\, \\\\\\ \�\ <br />IIIIIIIII////r I `--�= /11/)II)/ll\\\\\\I <br />I IIII I I//// / / / \ \ \ / // //////// \l\l I111 <br />1116111I 1j1///�l \ \ �\\\ hll//llllIIII /JI111111 <br />1111 1 11 11111\ I IIII ill)II�1 j111 <br />ldil iii., .y\ \\\ \\`\ 11\:\ <br />i�; ;_l /:-.,//i///// II <br />11 1 1 \ \\\I\\t` `- \ �" _ = _ �� \�\ <br />/ /'/il /' (1 /I ISTING-STOCKPILE \\ \�\\\\\\\\ <br />/0i////7/ I/ STOCKP�L-r`�__,\ IIII\\I\ \ <br />/ / / III <br />111 /1 /1/l /I / - I1111 IIII <br />I III! IIII III / / I IIII 1 <br />11i1 ;III \ / / / 1 IIII IIII <br />\1 \ \\\ \ \ / / / �J1111 111 <br />\\\\\ \\\\ \\\I\ / // // _ _ i J1 lll/ <br />\\\\\\\\\\\\\-/ // // ///,7 _ // <br />I \\\\ \\\\\\\\\\\\\\\\\\\\ I / / / <br />\\1\ \\\\\I I I / 1 / <br />1\\\ \1\\ \\\ 1 1 i I// <br />\\`k I 1 1 I / / <br />'\0 X 1 l <br />\\O \ I 1 \ \ <br />EXISTING BITUMINOUS PARKING LOT <br />6657 747ST AVE NW <br />7-STORY PRECAST CONCRETE BUILDING <br />EXISTING BUILDING <br />6651 141st AVE. NW <br />//////////W <br />14 <br />14ALP SI S <br />EXISTING BITUMINOUS PARKING LOT <br />BITUMINOUS 141? -A11E <br />T A VENUE-NW- <br />• CAS (P' <br />15 <br />KEYS ONE, <br />WALL <br />DRAINAGE AyO UTILITY EASEMENT PER PLAT <br />OF GATEWAY NORTH INDUSTRIAL PARK NO 5 <br />EXISTING CONCRETE APRON <br />1otIP W (P <br />1 6 NP W (P) <br />CONCRETE <br />/ <br />CO TB <br />W <br />NA, co <br />oho <br />1ZI; <br />A Si S <br />1091P W t'PJ <br />Inv:8B661.8 <br />`015"wcP SI S <br />P=86986� V-8 N.S <br />`ISFP SI S <br />2eo a <br />14220 BASALT ST. NW <br />PID: 27-32-25-43-0034 <br />2/ 14160 BASALT ST. NW <br />PID: 27-32-25-43-0020 <br />2; 6615 141st AVE. NW <br />PID: 27-32-25-43-0021 <br />PROPERTY INFORMATION <br />ADDRESS: 6651 141st AVENUE NW, RAMSEY, MN <br />PARCEL ID: 27-32-25-43-0015 <br />LOT AREA: 10.17 ACRES <br />WATERSHED: LOWER RUM RIVER WMO <br />ZONING DISTRICT: E-2 EMPLOYMENT <br />DRAWING INDEX <br />C000 - COVER SHEET <br />C 101 - SITE REMOVALS PLAN <br />C102 - SITE REMOVALS PLAN <br />C200 - STORMWATER POLLUTION <br />C201 - STORMWATER POLLUTION <br />C300 - STORMWATER POLLUTION <br />C401 - GRADING, DRAINAGE AND <br />C402 - GRADING, DRAINAGE AND <br />C501 - PAVING PLAN <br />C502 - PAVING PLAN <br />C600 - CIVIL DETAILS <br />PREVENTION NOTES <br />PREVENTION AREA MAP <br />PREVENTION DETAILS <br />EROSION CONTROL PLAN <br />EROSION CONTROL PLAN <br />STRONG BL <br />rx <br />__.i�IEPIN t.,u NTY <br />BUNKER LAKE BLVD <br />MSEY BLVD <br />4124SSIS`9jA <br />Al/1.11> <br />�i' <br />COTTONWOOD <br />SITE <br />SUNFISH LAKE BLVD <br />LOCATION MAP <br />CONSTRUCTION NOTES <br />1. ALL EXISTING INFORMATION TAKEN FROM SUNDE LAND <br />SURVEYING DATED 07/12/2023. <br />2. CONTRACTOR TO FIELD VERIFY ALL EXISTING <br />CONDITIONS INCLUDING LOCATIONS OF EXISTING <br />UTILITIES, AND NOTIFY ENGINEER OF ANY <br />DISCREPANCIES PRIOR TO STARTING CONSTRUCTION. <br />3. CONTRACTOR TO PREVENT DIRT AND/OR DEBRIS FROM <br />BEING TRANSPORTED OFF -SITE IN AN UNCONTROLLED <br />MANNER. SEDIMENT DISCOVERED SHALL BE REMOVED <br />BY CONTRACTOR WITHIN 7 DAYS OF DISCOVERY. <br />4. ALL WORK TO BE PERFORMED IN ACCORDANCE WITH <br />CITY OF RAMSEY, ANOKA COUNTY AND STATE OF <br />MINNESOTA REGULATIONS AND STANDARDS. <br />5. EXISTING UTILITIES ARE SHOWN IN THEIR <br />APPROXIMATE LOCATIONS. CONTRACTOR TO FIELD <br />VERIFY THE LOCATION OF ALL EXISTING UTILITIES <br />WHICH MAY INCLUDE BUT IS NOT LIMITED TO: <br />ELECTRIC, TELEPHONE, GAS, CABLE TV, COMPUTER <br />CABLE, FIBER OPTIC CABLE, SANITARY SEWER, STORM <br />SEWER AND WATER MAIN. CONTRACTOR TO CONTACT <br />THE GOPHER STATE ONE CALL BEFORE EXCAVATING. <br />6. CONTRACTOR TO PROTECT FROM DAMAGE ALL <br />EXISTING IMPROVEMENTS, LANDSCAPING, <br />STRUCTURES AND UTILITIES THAT ARE TO REMAIN. <br />CONTRACTOR TO STORE AND PROTECT EXISTING SITE <br />FEATURES WHICH NEED TO BE REMOVED AND <br />REPLACED. CONTRACTOR TO PREVENT DAMAGE OR <br />THEFT OF THESE ITEMS AND TO REPAIR AND REPLACE <br />AT OWN EXPENSE. <br />7. ALL EXCAVATIONS MUST COMPLY WITH THE <br />REQUIREMENTS OF OSHA 29 CFR, PART 1926, SUBPART <br />P "EXCAVATIONS AND TRENCHES". THIS DOCUMENT <br />STATES THAT EXCAVATION SAFETY IS THE SOLE <br />RESPONSIBILITY OF THE CONTRACTOR. <br />8. CONTRACTOR SHALL COORDINATE WITH ARCHITECT'S <br />DRAWINGS TO VERIFY LOCATION, SIZE AND QUANTITY <br />OF ALL ROOF DRAINS AND UTILITY CONNECTIONS. <br />9. PROVIDE TRAFFIC CONTROL IN ACCORDANCE WITH <br />MMUTCD, INCLUDING "FIELD MANUAL FOR TEMPORARY <br />TRAFFIC CONTROL ZONE LAYOUTS", CURRENT EDITION. <br />10. DRAWINGS DO NOT INDICATE AREAS OF TEMPORARY <br />SUPPORT SYSTEMS. THE CONTRACTOR IS RESPONSIBLE <br />FOR ALL MEANS AND METHODS AND WILL HAVE TOTAL <br />CONTROL OVER THE TYPES AND DESIGN OF ALL <br />SHORING, SHEETING, BRACING, ANCHORAGES, <br />EXCAVATION SUPPORT WALLS, DIRECTIONAL BORING, <br />AUGER JACKING, SOIL STABILIZATION AND OTHER <br />METHODS OF PROTECTING EXISTING IMPROVEMENTS. <br />SEE SPECIFICATIONS FOR SUBMITTAL REQUIREMENTS. <br />11. CONTRACTOR SHALL OBTAIN ALL REQUIRED PERMITS <br />PRIOR TO STARTING CONSTRUCTION. <br />12. ALL MATERIALS FOR PROPOSED CONSTRUCTION OR <br />REPAIR OF EXISTING FACILITIES SHALL BE NEW <br />PRODUCTS DIRECT FROM THE FACTORY AND FREE <br />FROM DEFECTS. <br />13. WHEN WORKING AROUND EXISTING UTILITIES, LIGHT <br />POLES, TRAFFIC SIGNALS, TELEPHONE OR POWER <br />POLES, THE CONTRACTOR SHALL PROVIDE SUFFICIENT <br />SUPPORT OR BRACING TO PREVENT EXCESSIVE STRESS <br />ON THE PIPING. THE CONTRACTOR IS FULLY <br />RESPONSIBLE FOR ANY DAMAGES CAUSED BY FAILURE <br />TO EXACTLY LOCATE AND PRESERVE THESE <br />UNDERGROUND FACILITIES. <br />14. CARE MUST BE TAKEN DURING CONSTRUCTION AND <br />EXCAVATION TO PROTECT ANY SURVEY MONUMENTS <br />AND/OR PROPERTY IRONS. MONUMENTS DAMAGED OR <br />DISPLACED DUE TO CONTRACTOR NEGLIGENCE SHALL <br />BE REPLACED AT THE CONTRACTORS EXPENSE. <br />15. CONTRACTOR SHALL NOT BLOCK DRAINAGE FROM OR <br />DIRECT EXCESS DRAINAGE ONTO ADJACENT <br />PROPERTY. <br />16. ADEQUATE DRAINAGE SHALL BE MAINTAINED AT ALL <br />TIMES DURING CONSTRUCTION AND ANY DRAINAGE <br />STRUCTURE DISTURBED DURING CONSTRUCTION <br />SHALL BE RESTORED TO THE SATISFACTION OF THE <br />OWNING AUTHORITY. <br />17. CONTRACTOR MUST ADHERE TO AXLE LOAD LIMITS <br />WHEN DELIVERING MATERIALS AND EQUIPMENT TO <br />THE SITE. ANY DAMAGE TO THE ROADWAY AND THE <br />CITY RIGHT-OF-WAY SHALL BE REPAIRED TO THE CITY'S <br />SATISFACTION AT THE COST OF THE CONTRACTOR. <br />18. CONTRACTOR SHALL TAKE PHOTOGRAPHS AND <br />DOCUMENT THE CONDITION OF THE EXISTING <br />ROADWAY PRIOR TO CONSTRUCTION. <br />PIE 1'� CE PINI <br />ASSOCIATES, INC. <br />Consulting Civil Engineers <br />9298 CENTRAL AVENUE NE <br />SUITE 312 <br />BLAINE, MN 55434 <br />TEL 763-537-1311 <br />6651 141 st AVENUE NW <br />RAMSEY, MN 55303 <br />I hereby certify that this plan or drawing was prepared <br />by me or under my direct supervision and that I am <br />a duly licensed Professional Engineer under the laws <br />of the State of Minnesota. <br />Company: PIERCE PINI & ASSOCIATES <br />Signed: IL <br />J�. <br />Name: Kevin Gardner <br />Date: 09/06/2023 Reg. No: 45815 <br />Issued for Date <br />Copyright 2023 Pierce Pini & Associates, Inc. <br />Comm. No. 23-020 <br />Drawn TS <br />Checked KG <br />Date 09/06/2023 <br />City Approval <br />Drawing Title <br />COVER SHEET <br />0 <br />60' <br />120' <br />180' <br />1" = 60' (22" x 24" SHEET) <br />1" = 120' (11" X 17" SHEET) <br />c000 <br />