Site Plan Approve <br />PROJECT DESCRIPTION: <br />A STORMWATER POLLUTION PREVENTION PLAN (SWPPP) HAS BEEN PREPARED IN CONFORMANCE WITH THE <br />GENERAL PERMIT AUTHORIZATION TO DISCHARGE STORMWATER ASSOCIATED WITH CONSTRUCTION ACTIVITY <br />UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)/STATE DISPOSAL SYSTEM (SDS) <br />CONSTRUCTION STORMWATER PERMIT. THE PROJECT WILL DISTURB LESS THAN ONE ACRE, HOWEVER ALL <br />SITE WORK SHALL FOLLOW THE PERMIT GUIDELINES. <br />THE GOAL OF POLLUTION PREVENTION EFFORTS DURING PROJECT CONSTRUCTION IS TO CONTROL SOIL AND <br />POLLUTANTS ON THE SITE AND PREVENT THEM FROM LEAVING THE PROJECT SITE AND FLOWING TO SURFACE <br />WATERS. THE PURPOSE OF THIS SWPPP IS TO PROVIDE GUIDELINES FOR ACHIEVING THAT GOAL. THE SWPPP <br />MUST BE KEPT ONSITE AND UPDATED AS NECESSARY DURING THE COURSE OF CONSTRUCTION TO KEEP IT <br />CURRENT WITH ANY MODIFICATIONS TO THE POLLUTION CONTROL MEASURES BEING UTILIZED. <br />THIS PROJECT CONSISTS OF THE ADDITION OF TWO ABOVE -GRADE FUEL TANKS AND ASSOCIATED ACCESS <br />ROADS AND PAVED STORAGE AREAS LOCATED ON THE NORTH SIDE OF PROPERTY. <br />THE PROPOSED STORMWATER MANAGEMENT DESIGN WILL MEET THE REQUIREMENTS OF THE CITY OF <br />RAMSEY AND THE LOWER RUM RIVER WATERSHED MANAGEMENT ORGANIZATION. THIS PROJECT IS NOT <br />REQUIRED TO MEET THE MPCA PERMANENT STORMWATER MANAGEMENT REQUIREMENTS BECAUSE THE <br />DISTURBED AREA IS LESS THAN ONE ACRE. <br />REGULATORY CONTEXT: <br />DISCHARGE TO SPECIAL OR IMPAIRED WATERS WITHIN ONE MILE OF SITE: <br />- THIS PROJECT DISCHARGES TO THE MISSISSIPPI RIVER - THIS RIVER IS IDENTIFIED AS AN IMPAIRED <br />WATER ON THE MPCA'S 303(D) IMPAIRED WATERS LIST FOR FECAL COLIFORM, MERCURY IN FISH TISSUE, <br />NUTRIENTS, AND PCBs IN FISH TISSUE. THESE IMPAIRMENTS ARE CONSIDERED CONSTRUCTION RELATED <br />AND ALL BMPS SHOULD FOLLOW ITEMS 23.9 AND 23.10 IN THE MPCA PERMIT GUIDELINES. <br />PLACEMENT OF FILL IN WATERS OF THE STATE: <br />- N/A <br />DRINKING WATER SUPPLY MANAGEMENT AREA: <br />- N/A <br />THE PROJECT STORMWATER DISCHARGE IS NOT ANTICIPATED TO IMPACT ANY OF THE FOLLOWING: <br />- OUTSTANDING RESOURCE VALUE WATERS, TROUT WATERS, WETLANDS, CALCAREOUS FENS, PROPERTIES <br />LISTED BY THE NATIONAL REGISTER OF HISTORIC PLACES OR ARCHAEOLOGICAL SITES <br />THE PROJECT STORMWATER DISCHARGE IS NOT SUBJECT TO ADDITIONAL REGULATION DUE TO ANY OF THE <br />FOLLOWING: <br />- OTHER FORMAL ENVIRONMENTAL REVIEWS, ENDANGERED OR THREATENED SPECIES <br />STORMWATER POLLUTION PREVENTION PLAN (SWPPP) IMPLEMENTATION RESPONSIBILITIES: <br />1. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL ON -SITE IMPLEMENTATION OF THE SWPPP, INCLUDING THE <br />ACTIVITIES OF ALL OF THE CONTRACTORS SUBCONTRACTORS. <br />2. CONTRACTOR SHALL PROVIDE A PERSON(S) KNOWLEDGEABLE AND EXPERIENCED IN THE APPLICATION OF <br />EROSION PREVENTION AND SEDIMENT CONTROL BMPS TO OVERSEE ALL INSTALLATION AND MAINTENANCE <br />OF BMPS AND IMPLEMENTATION OF THE SWPPP. <br />3. FOLLOWING FINAL STABILIZATION, THE OWNER IS EXPECTED TO FURNISH LONG TERM OPERATION AND <br />MAINTENANCE (0 85 M) OF THE PERMANENT STORM WATER MANAGEMENT SYSTEM. <br />STORMWATER DISCHARGE DESIGN REQUIREMENTS: <br />THE FOLLOWING SIZING CRITERIA APPLY TO THE DESIGN OF STORMWATER TREATMENT FACILITIES. N/A <br />INDICATES NOT APPLICABLE OR NOT CONSTRUCTED AS PART OF THIS PROJECT. <br />1. TEMPORARY SEDIMENTATION BASINS: N/A <br />2. PERMANENT WET SEDIMENTATION BASINS: EXISTING BASIN ON NORTHEND OF PROPERTY <br />3. PERMANENT INFILTRATION/FILTRATION : N/A <br />4. PERMANENT REGIONAL PONDS: N/A <br />5. ALTERNATIVE METHODS: N/A <br />SEQUENCE OF CONSTRUCTION: <br />THE FOLLOWING SEQUENCE DESCRIBES, IN GENERAL, THE WORK ON THE SITE: <br />1. CONTRACTOR SHALL VERIFY THAT ALL PERMITS HAVE BEEN OBTAINED AND/OR OBTAIN THE NECESSARY <br />PERMITS. <br />2. CONTRACTOR SHALL PERFORM SITE INSPECTIONS, RECORD KEEPING AND RECORD RETENTION IN <br />ACCORDANCE WITH ALL PERMITS. <br />3. CONTRACTOR SHALL INSTALL ALL PERIMETER AND DOWN -GRADIENT EROSION CONTROL AND SEDIMENT <br />CONTROL BEST MANAGEMENT PRACTICES (BMPS), CONSTRUCTION ENTRANCES AND INLET PROTECTION <br />DEVICES PRIOR TO SITE GRADING, EXCAVATION, STOCKPILING OR DISTURBING EXISTING VEGETATIVE <br />COVER. <br />4. CONTRACTOR SHALL PERFORM SITE GRADING, EXCAVATION, STOCKPILING WORK IN ACCORDANCE WITH <br />THE STORMWATER POLLUTION PREVENTION PLAN (SWPPP). <br />5. CONTRACTOR SHALL INSTALL, INSPECT, MONITOR AND MAINTAIN TEMPORARY AND PERMANENT EROSION <br />CONTROL BMPS AS SHOWN ON PLANS 85 IN CONFORMANCE WITH NPDES PERMIT, CONTINUOUSLY DURING <br />THE WORK. CONTRACTOR SHALL STABILIZE ALL EXPOSED SOILS NO LATER THAN 7 DAYS AFTER THE <br />CONSTRUCTION ACTIVITY IN THAT PORTION OF THE SITE HAS TEMPORARILY OR PERMANENTLY CEASED. <br />6. CONTRACTOR SHALL REPLACE OR REPAIR EROSION CONTROL AND SEDIMENT CONTROL BMPS THAT ARE <br />NOT FUNCTIONING PROPERLY. <br />7. CONTRACTOR SHALL PERFORM SITE RESTORATION ACTIVITIES FOR PERMANENT VEGETATIVE <br />ESTABLISHMENT. <br />8. CONTRACTOR SHALL REMOVE SEDIMENT CONTROL DEVICES PRIOR TO FINAL COMPLETION. <br />1. CONSTRUCTION ACTIVITY FIELD REQUIREMENTS: <br />ALL FIELD REQUIREMENTS SHALL BE PERFORMED IN ACCORDANCE WITH THE REQUIREMENTS OF THE <br />NPDES PERMIT AND STORMWATER POLLUTION PREVENTION PLAN (SWPPP). <br />A. THE CONTRACTOR MUST IMPLEMENT THE SWPPP AND PROVIDE BMPS IDENTIFIED IN THE SWPPP IN AN <br />APPROPRIATE AND FUNCTIONAL MANNER. <br />B. THE CONTRACTOR SHALL RESPOND TO CHANGING SITE CONDITIONS AND IMPLEMENT/SUPPLEMENT <br />EROSION PREVENTION AND SEDIMENT CONTROL MEASURES UTILIZED TO PROVIDE ADEQUATE <br />PROTECTION OF DISTURBED SOILS AND ADEQUATE PREVENTION OF SEDIMENT TRANSPORT OFF -SITE. <br />AT A MINIMUM, THE FOLLOWING STORM WATER POLLUTION PREVENTION CONSTRUCTION ACTIVITY <br />FIELD REQUIREMENTS SHALL BE FURNISHED BY THE CONTRACTOR. <br />2. EROSION PREVENTION PRACTICES <br />CONTRACTOR SHALL BE RESPONSIBLE FOR THE FOLLOWING EROSION PREVENTION PRACTICES: <br />A. THE CONTRACTOR SHALL ATTEMPT TO PHASE ALL WORK TO MINIMIZE EROSION AND MAINTAIN <br />VEGETATIVE COVER TO THE EXTENT POSSIBLE. THE LOCATION OF AREAS NOT TO BE DISTURBED <br />MUST BE DELINEATED ON THE SITE BEFORE CONSTRUCTION BEGINS. <br />B. STABILIZATION ON ALL EXPOSED SOILS MUST BE INITIATED IMMEDIATELY WHENEVER CONSTRUCTION <br />ACTIVITY HAS PERMANENTLY OR TEMPORARILY CEASED ON ANY PORTION OF THE SITE AND WILL NOT <br />RESUME FOR A PERIOD EXCEEDING 7 CALENDAR DAYS, INCLUDING STOCKPILES WITH SIGNIFICANT <br />SILT, CLAY OR ORGANIC COMPONENTS. STABILIZATION MUST BE COMPLETED WITHIN 7 CALENDAR <br />DAYS. <br />C. THE NORMAL WETTED PERIMETER OF ANY TEMPORARY OR PERMANENT DRAINAGE DITCH THAT DRAINS <br />WATER FROM A CONSTRUCTION SITE OR DIVERTS WATER AROUND A SITE MUST BE STABILIZED BY <br />CONTRACTOR WITHIN 200 FEET FROM THE PROPERTY EDGE, OR FROM THE POINT OF DISCHARGE TO <br />ANY SURFACE WATER WITHIN 24 HOURS OF CONNECTING TO A SURFACE WATER. TEMPORARY OR <br />PERMANENT DITCH SWALES BEING USED AS A SEDIMENT CONTAINMENT SYSTEM DO NOT NEED TO BE <br />STABILIZED UNTIL THEY ARE NO LONGER USED AS A SEDIMENT CONTAINMENT SYSTEM, AFTER WHICH <br />THEY MUST BE STABILIZED WITHIN 24 HOURS. <br />D. TEMPORARY OR PERMANENT ENERGY DISSIPATION AT PIPE OUTLETS MUST BE PROVIDED WITHIN 24 <br />HOURS OF CONNECTING TO A SURFACE WATER. <br />E. THE CONTRACTOR MUST DIRECT DISCHARGES FROM BMPS TO VEGETATED AREAS OF THE SITE IN <br />ORDER TO INCREASE SEDIMENT REMOVAL AND MAXIMIZE INFILTRATION UNLESS INFEASIBLE. THE <br />CONTRACTOR MUST UTILIZE VELOCITY DISSIPATION DEVICES IF NECESSARY TO PREVENT EROSION <br />WHEN DIRECTING STORMWATER TO VEGETATED AREAS. <br />3. SEDIMENT CONTROL PRACTICES <br />CONTRACTOR SHALL BE RESPONSIBLE FOR THE FOLLOWING SEDIMENT CONTROL PRACTICES: <br />A. CONTRACTOR MUST INSTALL ALL DOWN GRADIENT PERIMETER CONTROLS BEFORE ANY UP GRADIENT <br />DISTURBANCE BEGINS. CONTRACTOR SHALL MAINTAIN PERIMETER CONTROLS UNTIL FINAL <br />STABILIZATION HAS BEEN ESTABLISHED. <br />B. CONTRACTOR SHALL PROVIDE GRADING AND BMP INSTALLATION TO LIMIT ALL SLOPES OF 3H:1V OR <br />STEEPER TO AN UNBROKEN LENGTH OF 75 FEET OR LESS. <br />C. IF DOWN GRADIENT SEDIMENT CONTROLS ARE OVERLOADED, THE CONTRACTOR MUST INSTALL <br />ADDITIONAL UPGRADIENT SEDIMENT CONTROL PRACTICES OR REDUNDANT BMPS TO ELIMINATE <br />OVERLOADING. THE SWPPP MUST BE AMENDED TO IDENTIFY THESES ADDITIONAL PRACTICES. <br />D. TIMING AND INSTALLATION OF SEDIMENT CONTROL DEVICES CAN BE ADJUSTED BY CONTRACTOR TO <br />ACCOMMODATE SHORT-TERM ACTIVITIES SUCH AS CLEARING AND GRUBBING OR VEHICLE PASSAGE. <br />ANY SHORT-TERM ACTIVITY MUST BE COMPLETED AS QUICKLY AS POSSIBLE AND THE SEDIMENT <br />CONTROL PRACTICES MUST BE INSTALLED IMMEDIATELY AFTER THE ACTIVITY IS COMPLETED AND IN <br />ALL CASES PRIOR TO THE NEXT PRECIPITATION EVENT. <br />E. ALL PUBLIC AND PRIVATE STORM SEWER INLETS AND OUTLETS SHALL BE PROTECTED BY CONTRACTOR <br />WITH APPROPRIATE BMPS DURING THE WORK. THESE PRACTICES SHALL REMAIN IN PLACE UNTIL THE <br />POTENTIAL SOURCES FOR DISCHARGING SEDIMENT TO INLETS HAVE BEEN STABILIZED BY <br />CONTRACTOR. <br />F. TEMPORARY SOIL STOCKPILES MUST HAVE SILT FENCE OR OTHER EFFECTIVE SEDIMENT CONTROLS. <br />SOIL STOCKPILES SHALL NOT BE PLACED IN SURFACE WATERS OR STORMWATER CONVEYANCES. <br />ACCEPTABLE PROTECTION INCLUDES COVER OF MULCH, EROSION CONTROL MATS, OR PLASTIC <br />SHEETING. <br />G. ROCK CONSTRUCTION ENTRANCES OR EQUIVALENT SYSTEM MUST BE INSTALLED BY CONTRACTOR TO <br />MINIMIZE TRACKING FROM SITE. CONTRACTOR SHALL PROVIDE STREET SWEEPING AS NECESSARY IF <br />BMPS ARE NOT ADEQUATE TO PREVENT SEDIMENT FROM BEING TRACKED ONTO THE STREET. <br />H. CONTRACTOR SHALL PROVIDE TEMPORARY SEDIMENTATION BASINS AS NEEDED. <br />I. CONTRACTOR MUST MINIMIZE SOIL COMPACTION AND PRESERVE TOPSOIL, UNLESS INFEASIBLE. <br />MINIMIZING SOIL COMPACTION IS NOT REQUIRED WHERE THE FUNCTION OF A SPECIFIC AREA OF THE <br />SITE DICTATES THAT IT BE COMPACTED. <br />J. THE CONTRACTOR MUST PRESERVE A 50 FOOT NATURAL BUFFER OR PROVIDE REDUNDANT SEDIMENT <br />CONTROLS WHEN A SURFACE WATER IS LOCATED WITHIN 50 FEET OF THE PROJECT DISTURBANCE <br />LIMITS AND STORMWATER FLOWS TO THE SURFACE WATER. <br />K. IF POLYMERS, FLOCCULANTS, OR OTHER SEDIMENTATION TREATMENT CHEMICALS ARE USED ON SITE, <br />THE CONTRACTOR MUST COMPLY WITH THE FOLLOWING REQUIREMENTS. <br />a. THE CONTRACTOR MUST USE CONVENTIONAL EROSION AND SEDIMENT CONTROLS PRIOR TO <br />CHEMICAL ADDITION TO ENSURE EFFECTIVE TREATMENT. CHEMICALS MAY ONLY BE APPLIED <br />WHERE TREATED STORMWATER IS DIRECTED TO A SEDIMENT CONTROL SYSTEM WHICH ALLOWS <br />FOR THE SETTLEMENT OF THE FLOC PRIOR TO DISCHARGE. <br />b. CHEMICALS MUST BE SELECTED THAT ARE APPROPRIATELY SUITED TO THE TYPES OF SOILS <br />LIKELY TO BE EXPOSED DURING CONSTRUCTION. CHEMICALS MUST BE USED IN ACCORDANCE <br />WITH ACCEPTED ENGINEERING PRACTICES, AND WITH DOSING SPECIFICATION AND SEDIMENT <br />REMOVAL DESIGN SPECIFICATION PROVIDED BY THE MANUFACTURER. <br />4. DEWATERING AND BASIN DRAINING <br />CONTRACTOR SHALL BE RESPONSIBLE FOR THE FOLLOWING DEWATERING REQUIREMENTS: <br />A. CONTRACTOR'S DEWATERING ACTIVITIES THAT HAVE SEDIMENT -LADEN DISCHARGE WATER MUST BE <br />DISCHARGED INTO A TEMPORARY OR PERMANENT SEDIMENTATION BASIN WHENEVER POSSIBLE, <br />OTHERWISE IT MUST BE DISCHARGED THROUGH SOME FORM OF BEST MANAGEMENT PRACTICE (BMP) <br />BY CONTRACTOR TO LIMIT SEDIMENT FROM LEAVING THE SITE. PRIOR TO DISCHARGE, THE <br />CONTRACTOR SHALL PERFORM A VISUAL TEST TO ENSURE ADEQUATE TREATMENT IS OBTAINED IN THE <br />BASIN OR BMP AND APPLY ADDITIONAL TREATMENT AS REQUIRED TO ENSURE ADEQUATE TREATMENT. <br />B. THE CONTRACTOR SHALL DISCHARGE WATER FROM DEWATERING IN A MANNER THAT DOES NOT <br />CAUSE NUISANCE CONDITIONS. THE DISCHARGE WATER SHALL BE DISPERSED OVER AN ACCEPTED <br />ENERGY DISSIPATION MEASURE AND NOT ADVERSELY AFFECT THE RECEIVING WATER OR <br />DOWNSTREAM LANDOWNERS OR WETLANDS. <br />C. IF CONTRACTOR IS USING FILTERS WITH BACKWASH WATER, THE CONTRACTOR SHALL HAUL THE <br />BACKWASH WATER AWAY FOR DISPOSAL, RETURN THE BACKWASH WATER TO THE BEGINNING OF THE <br />TREATMENT PROCESS, OR INCORPORATE THE BACKWASH WATER INTO THE SITE IN A MANNER THAT <br />DOES NOT CAUSE EROSION. <br />5. INSPECTIONS AND MAINTENANCE <br />CONTRACTOR SHALL BE RESPONSIBLE FOR PERFORMING THE FOLLOWING INSPECTIONS AND <br />MAINTENANCE: <br />A. WHEN INSPECTIONS FIND EROSION PREVENTION AND SEDIMENT CONTROL BMPS THAT ARE <br />NONFUNCTIONAL, ALL NONFUNCTIONAL BMPS MUST BE REPAIRED, REPLACED, OR SUPPLEMENTED <br />WITH FUNCTIONAL BMPS WITHIN 24 HOURS AFTER DISCOVERY. THE CONTRACTOR SHALL ALSO PLACE <br />ANY ADDITIONAL EROSION CONTROL MEASURES DEEMED NECESSARY WITHIN 24 HOURS OF NOTICE <br />FROM CITY INSPECTORS. <br />B. THE CONTRACTOR MUST ROUTINELY INSPECT THE SITE ONCE EVERY 7 DAYS DURING ACTIVE <br />CONSTRUCTION AND WITHIN 24 HOURS AFTER A RAINFALL EVENT GREATER THAN 0.5 INCHES IN 24 <br />HOURS. <br />C. ALL INSPECTIONS AND MAINTENANCE CONDUCTED DURING CONSTRUCTION MUST BE RECORDED IN <br />WRITING BY CONTRACTOR AND RETAINED WITH THE SWPPP BY CONTRACTOR. A COPY OF THE WEEKLY <br />SWPPP INSPECTION REPORT AND ALL REPROTS FOLLOWING A 0.5-INCH OR GREATER RIANFALL EVENT <br />MUST BE SENT TO THE CITY INSPECTOR. MAINTENANCE MUST BE COMPLETED BY CONTRACTOR. <br />CONTRACTOR'S RECORDS MUST INCLUDE: <br />a. DATE AND TIME OF INSPECTION. <br />b. NAME OF PERSON CONDUCTING INSPECTION. <br />c. FINDING OF INSPECTION INCLUDING RECOMMENDATIONS FOR CORRECTIVE ACTION. <br />d. DETAILS OF CORRECTIVE ACTION TAKEN (DATE. TIME. PARTY COMPLETING MAINTENANCE <br />ACTIVITIES). <br />e. DATE AND AMOUNT OF RAINFALL GREATER THAN 0.5 INCHES IN 24 HOURS. <br />f. IF ANY DISCHARGE IS OBSERVED TO BE OCCURRING DURING THE INSPECTION, A RECORD OF <br />ALL POINTS OF THE PROPERTY FROM WHICH THERE IS A DISCHARGE MUST BE MADE, AND THE <br />DISCHARGE SHALL BE DESCRIBED (COLOR, ODOR, FLOATING, SETTLED, OR SUSPENDED SOLIDS, <br />FOAM, OIL SHEEN, AND OTHER INDICATORS) AND PHOTOGRAPHED. <br />DOCUMENTATION OF CHANGES MADE TO SWPPP. <br />g. <br />D. IN AREAS OF PROJECT WHERE FINAL STABILIZATION IS COMPLETE INSPECTIONS CAN BE REDUCED TO <br />ONCE A MONTH. THESE AREAS SHALL BE INSPECTED BY CONTRACTOR FOR MINIMUM PERIOD OF 12 <br />NON -WINTER MONTHS AND WITHIN 24 HOURS OF FIRST SPRING RUNOFF OR PRIOR TO RESUMING <br />CONSTRUCTION FOLLOWING ANY WINTER STOPPAGE, WHICHEVER COMES FIRST. <br />E. THE CONTRACTOR IS RESPONSIBLE FOR THE INSPECTION AND MAINTENANCE OF BMPS UNTIL THE <br />PROJECT HAS UNDERGONE FINAL STABLIZATION. <br />F. ALL EROSION CONTROL MEASURES MUST BE INSTALLED AND MAINTAINED BY CONTRACTOR <br />ACCORDING TO THE DETAILS INCLUDED IN THE CONSTRUCTION DOCUMENTS AND IN ACCORDANCE <br />WITH THE PRODUCT MANUFACTURER'S RECOMMENDATIONS. <br />G. ALL PERIMETER CONTROL DEVICES MUST BE REPAIRED, REPLACED OR SUPPLEMENTED BY THE <br />CONTRACTOR WHEN THEY BECOME NON-FUNCTIONAL OR THE SEDIMENT REACHES ONE-HALF THE <br />HEIGHT OF THE DEVICE. CONTRACTOR SHALL REPAIR OR REPLACE DEVICE THAT IS NONFUNCTIONAL <br />BY THE END OF THE NEXT BUSINESS DAY AFTER DISCOVERY, OR THEREAFTER AS SOON AS FIELD <br />CONDITIONS ALLOW. <br />H. TEMPORARY AND PERMANENT SEDIMENTATION BASINS MUST BE DRAINED AND SEDIMENT REMOVED <br />BY CONTRACTOR ONCE THE SEDIMENT COLLECTED REACHES ONE HALF THE STORAGE VOLUME WITH <br />72 HOURS OF DISCOVERY, OR AS SOON AS FIELD CONDITIONS ALLOW. <br />I. ALL SEDIMENT DEPOSITS WITHIN SURFACE WATERS OR STORMWATER CONVEYANCES MUST BE <br />REMOVED AND RESTABILIZED BY CONTRACTOR WITHIN 7 DAYS OF DISCOVERY OR SOONER IF IT <br />PRESENTS A FLOOD RISK, INCLUDING DELTAS AND STORM SEWER SEDIMENT DEPOSITS. THE <br />CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL PERMITS REQUIRED, IF NECESSARY, FOR <br />SUCH SEDIMENT REMOVAL. <br />J. CONTRACTOR SHALL BE RESPONSIBLE FOR KEEPING EXISTING PAVED SURFACES CLEAN OF SEDIMENT. <br />CONSTRUCTION ENTRANCES SHALL BE CHECKED DAILY BY CONTRACTOR. IF THE ENTRANCE BECOMES <br />INUNDATED WITH SEDIMENT, THE ENTRANCE WILL BE CLEANED OR REPLACED AS APPROPRIATE BY <br />CONTRACTOR. STREETS LEADING TO AND FROM THE CONSTRUCTION ENTRANCE SHALL BE CHECKED <br />DAILY BY CONTRACTOR FOR OFF -SITE SEDIMENT TRACKING ONTO PAVED SURFACES. THESE AREAS <br />WILL BE SWEPT CLEAN OF ANY TRACKED MATERIALS BY CONTRACTOR AS SOON AS POSSIBLE AND <br />WITHIN 24 HOURS OF DISCOVERY AND AS DIRECTED BY THE CITY. CONTRACTOR SHALL EXTEND <br />SWEEPING TO THE EXTREMITY OF ANY SEDIMENT TRACKING THAT OCCURS OFF -SITE. <br />K. CONTRACTOR SHALL BE RESPONSIBLE TO REMOVE ANY OFF -SITE SEDIMENT ACCUMULATIONS IN A <br />MANNER AND AT A FREQUENCY SUFFICIENT TO MINIMIZE OFF -SITE IMPACTS. <br />L. ALL INFILTRATION/FILTRATION AREAS MUST BE INSPECTED BY CONTRACTOR TO ENSURE THAT NO <br />SEDIMENT FROM ONGOING CONSTRUCTION IS ACCUMULATING OVER THE INFILTRATION/FILTRATION <br />AREA. SEDIMENT ACCUMULATED OVER INFILTRATION /FILTRATION MUST BE REMOVED BY <br />CONTRACTOR. <br />M. CONTRACTOR SHALL PROTECT INFILTRATION/FILTRATION AREAS FROM SEDIMENTATION AND <br />OVER -COMPACTION. DURING EXCAVATION, SEDIMENT AND EROSION CONTROL DEVICES MUST BE <br />UTILIZED BY CONTRACTOR TO PREVENT SEDIMENTATION AND THE AREA MUST BE STAKED OFF AND <br />MARKED SO THAT HEAVY CONSTRUCTION EQUIPMENT WILL NOT COMPACT THE SOIL. <br />N. INSPECTIONS CAN BE SUSPENDED DUE TO FROZEN GROUND CONDITIONS UNTIL FIRST RUNOFF <br />OCCURS OR CONSTRUCTION ACTIVITIES RESUME. <br />O. A COPY OF ALL WEEKLY AND STORM EVENT INSPECTION RECORDS SHALL BE PROVIDED TO THE CITY <br />OF RAMSEY BUILDING INSPECTOR. <br />6. POLLUTION PREVENTION MEASURES <br />CONTRACTOR SHALL BE RESPONSIBLE FOR IMPLEMENTING THE FOLLOWING POLLUTION PREVENTION <br />MANAGEMENT MEASURES ON THE SITE: <br />A. THE CONTRACTOR SHALL MINIMIZE THE EXPOSURE OF ALL PRODUCTS, MATERIALS, AND WASTES <br />FROM STORMWATER WHICH MAY BE A SOURCE OF CONTAMINATION TO STORMWATER OR ARE NOT <br />DESIGNED TO BE EXPOSED TO STORMWATER. <br />B. BUILDING PRODUCTS THAT MAY LEACH POLLUTANTS MUST BE UNDER COVER (PLASTIC SHEETING, <br />TEMPORARY ROOFS, ETC.) TO PREVENT THE DISCHARGE OF POLLUTANTS OR PROTECTED BY A <br />SIMILARLY EFFECTIVE MEANS DESIGNED TO MINIMIZE CONTACT WITH STORMWATER. <br />C. PESTICIDES, HERBICIDES, INSECTICIDES, FERTILIZERS, TREATMENT CHEMICALS, AND LANDSCAPE <br />MATERIALS MUST BE UNDER COVER (PLASTIC SHEETING, TEMPORARY ROOFS, ETC.) TO PREVENT THE <br />DISCHARGE OF POLLUTANTS OR PROTECTED BY A SIMILARLY EFFECTIVE MEANS DESIGNED TO <br />MINIMIZE CONTACT WITH STORMWATER. <br />D. HAZARDOUS MATERIALS, TOXIC WASTE, (INCLUDING OIL, DIESEL FUEL, GASOLINE, HYDRAULIC FLUIDS, <br />PAINT SOLVENTS, PETROLEUM -BASED PRODUCTS, WOOD PRESERVATIVES ADDITIVES CURING <br />COMPOUNDS, AND ACIDS) MUST BE STORED IN SEALED CONTAINERS TO PREVENT SPILLS, LEAKS OR <br />OTHER DISCHARGE. RESTRICTED ACCESS STORAGE AREAS MUST BE PROVIDED TO PREVENT <br />VANDALISM. STORAGE AND DISPOSAL OF HAZARDOUS MATERIALS MUST COMPLY WITH ALL STATE <br />REQUIREMENTS. <br />E. SOLID WASTE MUST BE STORED, COLLECTED, AND DISPOSED IN COMPLIANCE WITH ALL STATE <br />REQUIREMENTS. <br />F. PORTABLE TOILETS MUST BE POSITIONED SO THAT THEY ARE SECURE AND WILL NOT BE TIPPED OVER. <br />SANITARY WASTE MUST BE DISPOSED OF IN ACCORDANCE WITH ALL STATE REQUIREMENTS. <br />G. THE CONTRACTOR SHALL TAKE REASONABLE STEPS TO PREVENT THE DISCHARGE OF SPILLED OR <br />LEAKED CHEMICALS, INCLUDING FUEL, FROM ALL AREAS WHERE CHEMICALS OR FUEL WILL BE <br />LOADED OR UNLOADED. THE CONTRACTOR MUST CONDUCT FUELING IN A CONTAINED AREA UNLESS <br />INFEASIBLE. THE CONTRACTOR MUST ENSURE ADEQUATE SUPPLIES ARE AVAILABLE AT ALL TIMES TO <br />CLEAN UP DISCHARGED MATERIALS AND THAT AN APPROPRIATE DISPOSAL METHOD IS AVAILABLE FOR <br />RECOVERED SPILLED MATERIALS. ALL SPILLS MUST BE CLEANED UP AND REPORTED IN ACCORDANCE <br />WITH STATE REQUIREMENTS. DRY CLEAN UP MEASURES SHALL BE USED WHERE POSSIBLE. <br />H. THE CONTRACTOR MUST LIMIT VEHICLE AND EQUIPMENT WASHING TO A DEFINED AREA WHEN <br />COMPLETED ON THE PROJECT SITE. RUNOFF FROM THE WASHING AREA MUST BE CONTAINED IN A <br />SEDIMENT BASIN OR OTHER SIMILARLY EFFECTIVE CONTROLS AND WASTE FROM THE WASHING <br />ACTIVITY MUST BE PROPERLY DISPOSED OF. THE CONTRACTOR MUST PROPERLY USE AND STORE <br />SOAPS, DETERGENTS, OR SOLVENTS. NO ENGINE DEGREASING IS ALLOWED ONSITE. <br />I. THE CONTRACTOR MUST PROVIDE EFFECTIVE CONTAINMENT FOR ALL LIQUID AND SOLID WASTES <br />GENERATED BY WASHOUT OPERATIONS (CONCRETE, STUCCO, PAINT, FORM RELEASE OILS, CURING <br />COMPOUNDS, AND OTHER CONSTRUCTION MATERIALS) RELATED TO THE PROJECT CONSTRUCTION <br />ACTIVITY. NO WASHOUT WASTES MAY CONTACT THE GROUND, AND THE CONTAINMENT MUST BE <br />DESIGNED SO THAT IT DOES NOT RESULT IN RUNOFF FROM THE WASHOUT OPERATIONS OR ARE <br />LIQUID AND SOLID WASTES MUST BE DISPOSED OF PROPERLY AND IN COMPLIANCE WITH ALL MPCA <br />RULES. A SIGN MUST BE INSTALLED ADJACENT TO EACH WASHOUT FACILITY THAT REQUIRES SITE <br />PERSONNEL TO UTILIZE PROPER FACILITIES FOR DISPOSAL OF CONCRETE AND OTHER WASHOUT <br />WASTES. <br />7. FINAL STABILIZATION <br />THE CONTRACTOR SHALL ENSURE FINAL STABILIZATION OF THE SITE. FINAL STABILIZATION REQUIRES THE <br />FOLLOWING: <br />A. ALL SOIL DISTURBING ACTIVITIES ARE COMPLETE AND A UNIFORM PERENNIAL VEGETATIVE COVER <br />WITH A DENSITY OF 70% OVER THE ENTIRE PERVIOUS SURFACE HAS BEEN ACHIEVED, INCLUDING <br />STABILIZATION OF ALL DITCHES AND SWALES. <br />B. CONTRACTOR SHALL ENSURE THAT ALL PERMANENT STORMWATER TREATMENT SYSTEMS ARE <br />CONSTRUCTED IN ACCORDANCE WITH THE REQUIREMENTS OF CONSTRUCTION DOCUMENTS. <br />C. CONTRACTOR SHALL REMOVE ALL TEMPORARY SYNTHETIC AND STRUCTURAL BMPS. <br />RECORD AVAILABLITY AND RETENTION: <br />- THE CONTRACTOR SHALL MAKE THE SWPPP, INCLUDING ALL CERTIFICATES, REPORTS, RECORDS, OR OTHER <br />INFORMATION, AVAILABLE TO FEDERAL, STATE, OR LOCAL OFFICIALS WITHIN 72 HOURS UPON REQUEST FOR <br />THE DURATION OF THE PROJECT AND FOR THREE YEARS FOLLOWING FINAL STABILIZATION. <br />INSPECTION AND ENTRY: <br />- THE CONTRACTOR MUST ALLOW ACCESS FOR REPRESENTATIVES OF THE CITY OR ANY MEMBER THEREOF <br />WHEN AUTHORIZED BY IT, TO ENTER UPON THE PROJECT SITE FOR THE PURPOSE OF OBTAINING <br />INFORMATION, EXAMINATION OF RECORDS, OR CONDUCTING SURVEYS OR INVESTIGATIONS. <br />8. CHANGES TO SWPPP <br />- THE CONTRCTOR MUST AMEND THE SWPPP AS NECESSARY TO INCLUDE ADDITIONAL REQUIREMENTS, SUCH <br />AS ADDITIONAL OR MODIFIED BMPS, DESIGNED TO CORRECT PROBLEMS IDENTIFIED OR ADDRESS SITUATIONS <br />WHENEVER: <br />1. THERE IS A CHANGE IN DESIGN, CONSTRUCTION, OPERATION OR MAINTENANCE, WEATHER OR SEASONAL <br />CONDITIONS THAT HAVE SIGNIFICANT EFFECT ON DISCHARGE. INSPECTION IS REQUIRED WITHIN 24 HOURS <br />OF A RAINFALL EVENT GREATER THAN ONE-HALF INCH. <br />2. INSPECTION OR INVESTIGATION BY SITE OPERATORS, LOCAL, STATE OR FEDERAL OFFICIALS INDICATE THE <br />SWPPP IS NOT EFFECTIVE. <br />3. THE SWPPP IS NOT ACHIEVING THE GENERAL OBJECTIVES OF CONTROLLING POLLUTANTS. <br />9. SWPPP CERTIFICATION: <br />- THIS STORMWATER POLLUTION PREVENTION PLAN WAS PREPARED BY INDIVIDUAL(S) TRAINED IN <br />ACCORDANCE WITH TRAINING REQUIREMENTS FOR PREPARATION OF SWPPPS. INDIVIDUAL(S) PREPARING THIS <br />SWPPP: <br />PREPARED BY: <br />KEVIN GARDNER, P.E. <br />PIERCE PINI AND ASSOCIATES <br />KEVIN@PIERCEPINI.COM <br />763-537-1311 <br />TRAINING/CERTIFICATION: <br />DATE OF TRAINING/CERTIFICATION: 2023 <br />CERTIFICATION PROGRAM: UNIVERSITY OF MINNESOTA DESIGN OF CONSTRUCTION SWPPP <br />ARDEN HILLS, MN <br />INSTRUCTOR(S): JOHN CHAPMAN <br />CERTIFICATION EXPIRATION: 2026 <br />PI KRCE PINT <br />ASSOCIATES, INC. <br />Consulting Civil Engineers <br />9298 CENTRAL AVENUE NE <br />SUITE 312 <br />BLAINE, MN 55434 <br />TEL 763-537-1311 <br />6651 141 st AVENUE NW <br />RAMSEY, MN 55303 <br />I hereby certify that this plan or drawing was prepared <br />by me or under my direct supervision and that I am <br />a duly licensed Professional Engineer under the laws <br />of the State of Minnesota. <br />Company: PIERCE PINI 85 ASSOCIATES <br />Signed: L., <br />Name: Kevin Gardner <br />Date: 09/06/2023 Reg. No: 45815 <br />Issued for Date <br />Copyright 2023 Pierce Pini & Associates, Inc. <br />Comm. No. 23-020 <br />Drawn <br />TS <br />Checked <br />KG <br />Date 09/06/2023 <br />City Approval <br />Drawing Title <br />STORMWATER <br />POLLUTION <br />PREVENTION NOTES <br />C200 <br />