My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 03/25/2025
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2025
>
Agenda - Council Work Session - 03/25/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 3:08:46 PM
Creation date
3/20/2025 3:31:13 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
03/25/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sustaining Our Legacyr- I <br />fhe Future of Ramsey Town Hall I i <br />BUILDING <br />IMPROVEMENTS <br />BUILDING ASSESSMENT & RECOMMENDATIONS <br />A variety of both structural and cosmetic work must be completed to render the Old Ramsey <br />Town Hall building stable and suitable for occupation. Here we outline the necessary steps for <br />improving the century -old structure to meet modern building code requirements and <br />Americans with Disabilities Act (ADA) standards. All work must align with the guidelines set by <br />the Secretary of the Interior's Standards for Rehabilitation. <br />ASE I: Climatization PHASE II: Pre -Occupancy Upgrade <br />and foremost, the Old Town Hall needs to be We recommend that the interior remain as one large <br />ized to prevent further damage to the structure. The space, adhering to the historical spatial experience <br />rs outlined here are in need of immediate attention of the building. If partitions within the space must be <br />event further water infiltration, insect or rodent installed, any alterations or additions should be <br />ation, and deterioration of historic material. reversible and installed in -kind. <br />al Envelope <br />brick around basement ventilation µ •' <br />and replace brick in -kind. Install <br />r ventilation stack in preparation for <br />ation of heating and cooling <br />ment. - <br />D COST. $600 <br />Repoint Chimney <br />PH <br />First <br />stabil <br />repai <br />to pr <br />infest <br />Se <br />Repair <br />stack <br />prope <br />install <br />equip <br />ESTIMATE <br />® Replace Roof & Repair Eaves <br />Replacing the roof will prevent any future <br />water infiltration. The roof should be <br />replaced with wood shingles or shakes. <br />More research could determine the <br />historical profile typical of the time of <br />construction. More insulation could be <br />added to improve energy efficiency at <br />the same time. <br />ESTIMATED COST $20,000 <br />-// ,1, hom V ccrr1.11 1 - ,o� moo h 1 <br />® Replace Entry Door & Stairs <br />The existing entry door is water -damaged <br />and the door surround does not properly <br />join the brick veneer, leaving room for <br />vermin infestation and water infiltration. <br />The door should be replaced with double <br />swinging doors with a glass transom <br />above, which is the appropriate historical <br />replacement. <br />ESTIMATED COST. $3,700 (doors & transom), $2,400 (stairs) <br />TOTAL COST. $26,700 <br />All work on the OTH will follow The Secretary of the Interior's <br />Standards for Rehabilitation, which pertain to all historic properties <br />listed on or eligible for listing on the NRHP. The Standards are to be <br />"applied to specific rehabilitation projects in a reasonable manner, <br />taking into consideration economic and technical feasibility." <br />Repair &Restore Windows <br />The windows were replaced during an earlier <br />grant project but could benefit from new <br />paint and caulk where brick meets wood. A <br />rear window needs to be replaced. ESTIMATED COST: $450 (recaulkingJ, $900 (window) <br />The mortar on the chimney is deteriorated <br />and needs to be repointed. This will prevent <br />any brick movement and possible spalling. <br />ESTIMATED COST: $1,000 <br />Q Install ADA Ramp, Sidewalk <br />Increasing access to the building for <br />future tenants is a top priority. The ramp <br />addition will be removable. <br />ESTIMATED COST $4 400 (ramp), $450 (45' sidewalk) <br />Q Install doors, plumbing, HVAC <br />Previous grants were used to purchase <br />doors and a furnace. Neither was installed <br />completely. New plumbing fixtures need <br />to be purchased and installed. <br />ESTIMATED COST: $300 (doors), $600 (plumbing), $1,700 (HVAC) <br />10 <br />Restore Wood Floor, Install Tile <br />The original hardwood floor needs <br />an extensive restoration. Historically <br />compatible file should be installed in the <br />restroom. <br />ESTIMATED COST: $3,300 (hardwood), $1,200 (tile) <br />Finish Interior <br />New wainscoting (historically appropriate) <br />needs to be installed and the new <br />sheetrock needs to be painted. <br />ESTIMATED COST: $3,940 <br />TOTAL COST: $18,240 <br />TOTAL PROJECT COST: $44, 940 <br />The renovation and restoration tasks are formidable, but not insurmountable. The result of these <br />rehabilitation efforts would be a valuable community asset, one that reinforces a connection to <br />Ramsey's rural roots as embodied in one of the earliest brick buildings in the area. Does Ramsey <br />have the will to do right by the Old Town Hall? <br />789>>> <br />city of <br />RAMSEY <br />
The URL can be used to link to this page
Your browser does not support the video tag.