"B" Street Construction and Restoration
<br />Bid Schedule
<br />ITEM
<br />•
<br />ITEM DESCRIPTION
<br />ESTIMATED
<br />QUANTITY
<br />UNIT
<br />CONTRACT UNIT
<br />PRICE
<br />CONTRACT AMOUNT
<br />USED TO
<br />DATE
<br />EXTENSION
<br />NO.
<br />Storm Sewer
<br />1
<br />LS
<br />'$2,500.00
<br />$ 2,500.00
<br />1.0
<br />$ 2,500.00
<br />1
<br />Mobilization
<br />20
<br />SY
<br />$10.00
<br />$ 200.00
<br />200
<br />$
<br />2
<br />Mill Bituminous Pavement
<br />Pavement
<br />40
<br />LF
<br />$5.00
<br />$ 200.00
<br />230
<br />$ -
<br />3
<br />'
<br />Saw Bituminous
<br />2,500
<br />CY
<br />$2.25
<br />$ 5,625.00
<br />2,500
<br />$ 5 625.00.
<br />v to to r co ml
<br />Common Excavation (P)
<br />Design B-618
<br />2,400
<br />LF
<br />$9.50
<br />$ 22,800.00
<br />2,247
<br />5 21,348.50
<br />Concrete Curb 8 Gutter,
<br />5
<br />1,700
<br />TON
<br />$12.85
<br />$ 21,845.00
<br />1,680
<br />5 21,588.00
<br />Aggregate Base, Class
<br />Course Mixture
<br />550
<br />TON
<br />$52.00
<br />$ 28,600.00
<br />420
<br />$ 21,840.00
<br />Type MV3 Wearing
<br />Mixture
<br />820
<br />TON
<br />$49.50
<br />$ 40,590.00
<br />675.6
<br />$ 33,4.42.20
<br />Type MV3 Non- Wearing Course
<br />250
<br />GAL
<br />$3.00
<br />$ 750.00
<br />200
<br />$ 600.00
<br />Bit Material for Tack Coat
<br />& Mulch
<br />1
<br />AC
<br />$550.00
<br />$ 550.00
<br />44" Span RCP Arch
<br />Sewer
<br />$ -
<br />EA
<br />Seeding Inc. Seed. Fertilizer
<br />3000
<br />LF
<br />$1.20
<br />$ 3,600.00
<br />850
<br />$ 1,020.00
<br />11
<br />Sift Fence Pm- Assembled
<br />600
<br />CY
<br />$2.25
<br />$ 1,350.00
<br />Construct Standard
<br />48" - Dia. 07-81w/casting
<br />$
<br />12
<br />Salvage & Reinstall Topsoil (LV)
<br />. Manholes
<br />4
<br />EA
<br />$0.01
<br />$ 0.04
<br />Construct Manhole -
<br />60" Dia. (0-81 wkasting
<br />$ -
<br />13
<br />Adjust
<br />6
<br />EA
<br />$255.00
<br />S 1,530.00
<br />Construct Manhole
<br />Die. (0.8') w/ steel plate
<br />$ -
<br />14
<br />Type III Barricades
<br />1 0
<br />EA
<br />$25.00
<br />$ 250.00
<br />Construct Manhole 60"
<br />72" Dia. (0.8') w/ casting
<br />$ -
<br />15
<br />Street Inlet Control Device
<br />1
<br />EA
<br />$1,200.00
<br />$ 1,200.00
<br />Construct Manhole
<br />72" Die. (0-8') w/ steel plate
<br />$ -
<br />16
<br />Rock Entrance - 11, can rte S 107,961.70
<br />"A" Storm Sewer, Watermain and Sanitary Sewer
<br />Bid Schedule
<br />ITEM
<br />-
<br />ITEM DESCRIPTION
<br />ESTIMATED
<br />QUANTITY
<br />UNIT
<br />CONTRACT UNIT
<br />PRICE
<br />CONTRACT AMOUNT
<br />USED TO
<br />DATE
<br />EXTENSION
<br />NO.
<br />Storm Sewer
<br />1
<br />EA
<br />$4,000.00
<br />$ 4,000.00
<br />1
<br />$ 4,000.00
<br />1
<br />Connect to Existing
<br />200
<br />LF
<br />$22.00
<br />$ 4,400.00
<br />200
<br />$ 4,400.00
<br />2
<br />15" RCP (CI.S)
<br />240
<br />LF
<br />$33.50
<br />$ 8,040.00
<br />230
<br />$ 7,705.00
<br />3
<br />24" RCP (C13)
<br />380
<br />LF
<br />$64.50
<br />$ 24,510.00
<br />352
<br />$ 22,704.00
<br />4
<br />36" RCP (CL3)
<br />250
<br />LF
<br />$55.00
<br />$ 13,750.00
<br />250
<br />S 13,750.00
<br />5
<br />28.5" Span RCP Arch
<br />830
<br />IF
<br />$92.00
<br />$ 76,360.00
<br />830
<br />$ 76,360.00
<br />6
<br />44" Span RIP Arch
<br />1
<br />EA
<br />$495.00
<br />$ 495.00
<br />1
<br />S 495.00
<br />7
<br />15" RCP FES
<br />1
<br />EA
<br />$675.00
<br />$ 675.00
<br />1
<br />$ 675.00
<br />8
<br />24" RCP FES
<br />FES
<br />1
<br />EA
<br />$1,045.00
<br />$ 1,045.00
<br />1
<br />$ 1,045.00
<br />9
<br />44" Span RCP Arch
<br />Sewer
<br />4
<br />EA
<br />$200.00
<br />$ 800.00
<br />4
<br />$ 800.00
<br />10
<br />Bulkhead Storm
<br />Catchbasin (T x 3')
<br />3
<br />EA
<br />$1,695.00
<br />$ 5,085.00
<br />3
<br />$ 5,085.00
<br />11
<br />Construct Standard
<br />48" - Dia. 07-81w/casting
<br />2
<br />EA
<br />$2,155.00
<br />$ 4,310.00
<br />2
<br />$ 4,310.00
<br />12
<br />Construct Manhole -
<br />60" Dia. (0-81 wkasting
<br />3
<br />EA
<br />$2,960.00
<br />$ 8,880.00
<br />3
<br />$ 8,880.00
<br />13
<br />Construct Manhole
<br />Die. (0.8') w/ steel plate
<br />1
<br />EA
<br />52,250.00
<br />$ 2,250.00
<br />1
<br />$ 2,250.00
<br />14
<br />Construct Manhole 60"
<br />72" Dia. (0.8') w/ casting
<br />1
<br />EA
<br />53,470.00
<br />$ 3,470.00
<br />1
<br />$ 3,470.00
<br />15
<br />Construct Manhole
<br />72" Die. (0-8') w/ steel plate
<br />3
<br />EA
<br />52,765.0C
<br />S 8,295.00
<br />3
<br />$ 8,295.00
<br />16
<br />Construct Manhole
<br />96 Dia. (0-8') wlcasting
<br />1
<br />EA
<br />$5,775.00
<br />$ 5,775.00
<br />1
<br />$ 5,775.00
<br />17
<br />Construct Manhole
<br />Rip
<br />20
<br />CY
<br />$75.00
<br />$ 1,500.00
<br />20
<br />$ 1,500.00
<br />18
<br />Class III Random -Rap
<br />Sewer Service
<br />2
<br />EA
<br />52,160.00
<br />$ 4,320.00
<br />1
<br />S 2.160.00
<br />19
<br />Extend 8" Sanitary
<br />Relocate Hydrant
<br />2
<br />EA
<br />$3,070.00
<br />5 6,140.00
<br />2
<br />S 6,140.00
<br />20
<br />21
<br />Extend 8" Water Service and
<br />Conned to Existing Watennain
<br />2
<br />I�IJI
<br />$680.00
<br />5 1,360.00
<br />2
<br />$ 1,360.00
<br />$30.50
<br />$ 12,657.50
<br />412
<br />$ 12,566.00
<br />22
<br />10" DIP Waternain
<br />415
<br />$25.00
<br />5 500.00
<br />17
<br />$ 425.00
<br />20
<br />23
<br />6" DIP Watennain
<br />2
<br />EA
<br />$1,760.00
<br />$ 3,520.00
<br />1
<br />$ 1,760.00
<br />24
<br />10" Gate Valve
<br />Hydrant
<br />1
<br />EA
<br />$3,270.00
<br />$ 3,270.00
<br />1
<br />$ 3,270.00
<br />25
<br />- 6" Gate Valve and
<br />800
<br />LB
<br />$4.00
<br />$ 3,200.00
<br />650
<br />$ 2,600.00
<br />26
<br />Ductile Iron Fittings
<br />Common Excavation (P) (Pond Construction)
<br />4300
<br />CY
<br />$2.25
<br />$ 9,675.00
<br />.,." ., "" en
<br />4,300
<br />$ 9,675.00
<br />s 211.465.00
<br />27
<br />October 12, 2006
<br />Honorable Mayor & City Council
<br />City of Ramsey
<br />15153 Nowthen Blvd. NW
<br />Ramsey, MN5�5�3,003y/
<br />RE: Project (J( aE`-43; Ebony Addition Utility and Street Improvements
<br />Contractor. Ryan Contracting
<br />Contract Amount $349,872.54
<br />Award Date: June 28, 2006
<br />Completion Date: September 30, 2006
<br />PAY ESTIMATE #3
<br />City of Ramsey
<br />Ebony Addition Utility and Street Improvements
<br />Dear Honorable Mayor and Council Members:
<br />The following work has been completed on the above - referenced project by Ryan Contracting.
<br />S:\M unicipalMAram sey13181 \SpectRA3181 pe
<br />Total Bid Schedule
<br />Total Bid Schedule
<br />PE - 1
<br />C .44
<br />- Awtner--
<br />-125-