Laserfiche WebLink
"B" Street Construction and Restoration <br />Bid Schedule <br />ITEM <br />• <br />ITEM DESCRIPTION <br />ESTIMATED <br />QUANTITY <br />UNIT <br />CONTRACT UNIT <br />PRICE <br />CONTRACT AMOUNT <br />USED TO <br />DATE <br />EXTENSION <br />NO. <br />Storm Sewer <br />1 <br />LS <br />'$2,500.00 <br />$ 2,500.00 <br />1.0 <br />$ 2,500.00 <br />1 <br />Mobilization <br />20 <br />SY <br />$10.00 <br />$ 200.00 <br />200 <br />$ <br />2 <br />Mill Bituminous Pavement <br />Pavement <br />40 <br />LF <br />$5.00 <br />$ 200.00 <br />230 <br />$ - <br />3 <br />' <br />Saw Bituminous <br />2,500 <br />CY <br />$2.25 <br />$ 5,625.00 <br />2,500 <br />$ 5 625.00. <br />v to to r co ml <br />Common Excavation (P) <br />Design B-618 <br />2,400 <br />LF <br />$9.50 <br />$ 22,800.00 <br />2,247 <br />5 21,348.50 <br />Concrete Curb 8 Gutter, <br />5 <br />1,700 <br />TON <br />$12.85 <br />$ 21,845.00 <br />1,680 <br />5 21,588.00 <br />Aggregate Base, Class <br />Course Mixture <br />550 <br />TON <br />$52.00 <br />$ 28,600.00 <br />420 <br />$ 21,840.00 <br />Type MV3 Wearing <br />Mixture <br />820 <br />TON <br />$49.50 <br />$ 40,590.00 <br />675.6 <br />$ 33,4.42.20 <br />Type MV3 Non- Wearing Course <br />250 <br />GAL <br />$3.00 <br />$ 750.00 <br />200 <br />$ 600.00 <br />Bit Material for Tack Coat <br />& Mulch <br />1 <br />AC <br />$550.00 <br />$ 550.00 <br />44" Span RCP Arch <br />Sewer <br />$ - <br />EA <br />Seeding Inc. Seed. Fertilizer <br />3000 <br />LF <br />$1.20 <br />$ 3,600.00 <br />850 <br />$ 1,020.00 <br />11 <br />Sift Fence Pm- Assembled <br />600 <br />CY <br />$2.25 <br />$ 1,350.00 <br />Construct Standard <br />48" - Dia. 07-81w/casting <br />$ <br />12 <br />Salvage & Reinstall Topsoil (LV) <br />. Manholes <br />4 <br />EA <br />$0.01 <br />$ 0.04 <br />Construct Manhole - <br />60" Dia. (0-81 wkasting <br />$ - <br />13 <br />Adjust <br />6 <br />EA <br />$255.00 <br />S 1,530.00 <br />Construct Manhole <br />Die. (0.8') w/ steel plate <br />$ - <br />14 <br />Type III Barricades <br />1 0 <br />EA <br />$25.00 <br />$ 250.00 <br />Construct Manhole 60" <br />72" Dia. (0.8') w/ casting <br />$ - <br />15 <br />Street Inlet Control Device <br />1 <br />EA <br />$1,200.00 <br />$ 1,200.00 <br />Construct Manhole <br />72" Die. (0-8') w/ steel plate <br />$ - <br />16 <br />Rock Entrance - 11, can rte S 107,961.70 <br />"A" Storm Sewer, Watermain and Sanitary Sewer <br />Bid Schedule <br />ITEM <br />- <br />ITEM DESCRIPTION <br />ESTIMATED <br />QUANTITY <br />UNIT <br />CONTRACT UNIT <br />PRICE <br />CONTRACT AMOUNT <br />USED TO <br />DATE <br />EXTENSION <br />NO. <br />Storm Sewer <br />1 <br />EA <br />$4,000.00 <br />$ 4,000.00 <br />1 <br />$ 4,000.00 <br />1 <br />Connect to Existing <br />200 <br />LF <br />$22.00 <br />$ 4,400.00 <br />200 <br />$ 4,400.00 <br />2 <br />15" RCP (CI.S) <br />240 <br />LF <br />$33.50 <br />$ 8,040.00 <br />230 <br />$ 7,705.00 <br />3 <br />24" RCP (C13) <br />380 <br />LF <br />$64.50 <br />$ 24,510.00 <br />352 <br />$ 22,704.00 <br />4 <br />36" RCP (CL3) <br />250 <br />LF <br />$55.00 <br />$ 13,750.00 <br />250 <br />S 13,750.00 <br />5 <br />28.5" Span RCP Arch <br />830 <br />IF <br />$92.00 <br />$ 76,360.00 <br />830 <br />$ 76,360.00 <br />6 <br />44" Span RIP Arch <br />1 <br />EA <br />$495.00 <br />$ 495.00 <br />1 <br />S 495.00 <br />7 <br />15" RCP FES <br />1 <br />EA <br />$675.00 <br />$ 675.00 <br />1 <br />$ 675.00 <br />8 <br />24" RCP FES <br />FES <br />1 <br />EA <br />$1,045.00 <br />$ 1,045.00 <br />1 <br />$ 1,045.00 <br />9 <br />44" Span RCP Arch <br />Sewer <br />4 <br />EA <br />$200.00 <br />$ 800.00 <br />4 <br />$ 800.00 <br />10 <br />Bulkhead Storm <br />Catchbasin (T x 3') <br />3 <br />EA <br />$1,695.00 <br />$ 5,085.00 <br />3 <br />$ 5,085.00 <br />11 <br />Construct Standard <br />48" - Dia. 07-81w/casting <br />2 <br />EA <br />$2,155.00 <br />$ 4,310.00 <br />2 <br />$ 4,310.00 <br />12 <br />Construct Manhole - <br />60" Dia. (0-81 wkasting <br />3 <br />EA <br />$2,960.00 <br />$ 8,880.00 <br />3 <br />$ 8,880.00 <br />13 <br />Construct Manhole <br />Die. (0.8') w/ steel plate <br />1 <br />EA <br />52,250.00 <br />$ 2,250.00 <br />1 <br />$ 2,250.00 <br />14 <br />Construct Manhole 60" <br />72" Dia. (0.8') w/ casting <br />1 <br />EA <br />53,470.00 <br />$ 3,470.00 <br />1 <br />$ 3,470.00 <br />15 <br />Construct Manhole <br />72" Die. (0-8') w/ steel plate <br />3 <br />EA <br />52,765.0C <br />S 8,295.00 <br />3 <br />$ 8,295.00 <br />16 <br />Construct Manhole <br />96 Dia. (0-8') wlcasting <br />1 <br />EA <br />$5,775.00 <br />$ 5,775.00 <br />1 <br />$ 5,775.00 <br />17 <br />Construct Manhole <br />Rip <br />20 <br />CY <br />$75.00 <br />$ 1,500.00 <br />20 <br />$ 1,500.00 <br />18 <br />Class III Random -Rap <br />Sewer Service <br />2 <br />EA <br />52,160.00 <br />$ 4,320.00 <br />1 <br />S 2.160.00 <br />19 <br />Extend 8" Sanitary <br />Relocate Hydrant <br />2 <br />EA <br />$3,070.00 <br />5 6,140.00 <br />2 <br />S 6,140.00 <br />20 <br />21 <br />Extend 8" Water Service and <br />Conned to Existing Watennain <br />2 <br />I�IJI <br />$680.00 <br />5 1,360.00 <br />2 <br />$ 1,360.00 <br />$30.50 <br />$ 12,657.50 <br />412 <br />$ 12,566.00 <br />22 <br />10" DIP Waternain <br />415 <br />$25.00 <br />5 500.00 <br />17 <br />$ 425.00 <br />20 <br />23 <br />6" DIP Watennain <br />2 <br />EA <br />$1,760.00 <br />$ 3,520.00 <br />1 <br />$ 1,760.00 <br />24 <br />10" Gate Valve <br />Hydrant <br />1 <br />EA <br />$3,270.00 <br />$ 3,270.00 <br />1 <br />$ 3,270.00 <br />25 <br />- 6" Gate Valve and <br />800 <br />LB <br />$4.00 <br />$ 3,200.00 <br />650 <br />$ 2,600.00 <br />26 <br />Ductile Iron Fittings <br />Common Excavation (P) (Pond Construction) <br />4300 <br />CY <br />$2.25 <br />$ 9,675.00 <br />.,." ., "" en <br />4,300 <br />$ 9,675.00 <br />s 211.465.00 <br />27 <br />October 12, 2006 <br />Honorable Mayor & City Council <br />City of Ramsey <br />15153 Nowthen Blvd. NW <br />Ramsey, MN5�5�3,003y/ <br />RE: Project (J( aE`-43; Ebony Addition Utility and Street Improvements <br />Contractor. Ryan Contracting <br />Contract Amount $349,872.54 <br />Award Date: June 28, 2006 <br />Completion Date: September 30, 2006 <br />PAY ESTIMATE #3 <br />City of Ramsey <br />Ebony Addition Utility and Street Improvements <br />Dear Honorable Mayor and Council Members: <br />The following work has been completed on the above - referenced project by Ryan Contracting. <br />S:\M unicipalMAram sey13181 \SpectRA3181 pe <br />Total Bid Schedule <br />Total Bid Schedule <br />PE - 1 <br />C .44 <br />- Awtner-- <br />-125- <br />