My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/24/2006
Ramsey
>
Public
>
Agendas
>
Council
>
2006
>
Agenda - Council - 10/24/2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 3:52:30 PM
Creation date
10/20/2006 3:17:04 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/24/2006
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
257
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Ramsey <br />15153 Nowthen Blvd NW <br />Ramsey, MN <br />PROJECT NUMBER: 060229 <br />PROJECT NAME: Municipal Center \Construction \Contracts \1151 - Klemm <br />TO CONTRACTOR: <br />The Contract is changed as follows: <br />ASI 12 - Relocate fin tube radiation at door F194B. <br />FCA 59 - Provide hose bib in security access panel located in Sally Port <br />Garage F190. <br />FCA 86 - Change sink in F195 from 25x22 to 25x19. <br />FCA 88 - Cut transfer openings in rooms F225, F224, F230, and F223 <br />FCA 94 - Relocate water coolers located near door Fl 16A to wall <br />between Doors F105 and F106. Relocated water coolers located near <br />Door S210 to wall between Doors S205 & S206. Install necessare <br />rough ins for water waste and vent Cap existing rough -ins. <br />PR 44 - Provide drainage at intake and exhaust pleums in the Rea B <br />mehcnial penthouse. <br />-148- <br />The Original Contract Amount was <br />Net change by previously authorized Change Orders <br />The Current Contract Amount prior to this Change Order was <br />The Current Contract Amount will be increased by this Change Order in the amount of <br />The new Current Contract Amount including this Change Order will be <br />The Contract Time will be unchanged. <br />The date of Substantial Completion as of the date of this Change Order therefore is <br />BKV Group, Inc. <br />Minneap• is, N <br />City of Ramsey Municipal Center <br />CHANGE ORDER <br />Klemm Mechanical Contractors <br />12409 Co. Rd. # 11 <br />Burnsville , MN 55337 <br />Klemm Mechanical Contractors <br />Burnsville , MN <br />CHANGE ORDER NUMBER: <br />DATE: <br />CONTRACTOR DATE: <br />CONTRACTOR FOR: <br />Add <br />Add <br />Add <br />Add <br />Add <br />Add <br />TOTAL CHANGES: Add <br />Not valid until signed by the general contractor and the owner. <br />Signature of the owner indicates agreement herewith, including any adjustment in the Contract Sum or the Contract Time. <br />CONTRACTOR O <br />00'6 aCC Y <br />1151 -09 <br />03 -Aug -2006 <br />01-Jun -2005 <br />RM -1151: Mechanical <br />City of Ramsey <br />Ramsey, MN <br />ORIGINAL <br />• <br />1 <br />$1,806,000.00 <br />$37,023.78 <br />$1,843,023.78 <br />$6,618.89 <br />$1,849,642.67 <br />$514.92 <br />$435.70 <br />$451.55 <br />$595.35 <br />$1,358.55 <br />$3,26Z 82 <br />$6,618.89 <br />30-Sep -2006 <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.