GENERAL SITE WORK NOTES <br />1 CONTRACTOR TO VERIFY THE LOCATION OF ALL UNDERGROUND UTILITIES PRIOR TO BEGINNING ANY <br />CONSTRUCTION BY CALLING GOPHER STATE ONE -CALL (1-651-454-0002 METRO AREA, 1-800-252-1166 OUT STATE) <br />2. VERIFY HORIZONTAL LOCATION AND ELEVATION WHERE A CONNECTION TO EXISTING PAVEMENT, STRUCTURE, PIPE <br />OR OTHER SITE FEATURE IS TO BE MADE THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE ENGINEER OF ANY <br />DISCREPANCIES OR VARIATIONS FROM THE PLANS <br />3 REFERENCE TO MNDOT SPECIFICATIONS SHALL MEAN DIVISIONS II AND III OF THE 2020 SPECIFICATIONS <br />FOR CONSTRUCTION <br />4 CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ANY APPROPRIATE ADDITIONAL PERMITS THIS MAY <br />INCLUDE FOR DEWATERING, BURNING, OR OTHER GRADING ACTIVITIES <br />5. SNOW REMOVAL WILL BE COMPLETED ON A NEEDED BASIS SNOW TO REMAIN ONSITE, PLOWED TO THE EDGE OF <br />THE ACCESS ROAD NO SNOW IS TO BE REMOVED FROM THE SITE <br />GENERAL UTILITY NOTES <br />1 PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING UTILITY LOCATIONS <br />AND INVERTS, SHOWN OR NOT SHOWN ANY DISCREPANCY BETWEEN PLANS AND FIELD CONDITIONS <br />SHALL BE REPORTED TO THE ENGINEER IMMEDIATELY <br />2. ALL UTILITY WORK SHALL BE PERFORMED IN ACCORDANCE WITH ANOKA COUNTY AND CITY OF <br />RAMSEY REQUIREMENTS <br />3 UTILITY TRENCHES SHALL BE COMPACTED TO 95% STANDARD PROCTOR MAXIMUM DRY DENSITY <br />(ASTM D698 78 OR AASHTO T-99) FROM THE PIPE ZONE TO WITHIN THREE FEET OF THE GROUND <br />SURFACE AND 100% STANDARD PROCTOR IN THE UPPER THREE FEET UNDER WALKS AND <br />PAVEMENTS, AND 90% STANDARD PROCTOR IN LANDSCAPE AREAS <br />4 FIELD ADJUST ALL CASTINGS TO MATCH FINAL GRADES <br />STORM SEWER NOTES <br />1 STORM SEWER CONSTRUCTION SHALL BE IN ACCORDANCE WITH MNDOT 2501-2511 SPECIFICATIONS <br />2 APPROXIMATE PIPE LENGTHS ON THE PLAN INCLUDE THE APRON SECTION <br />STORMWATER POLLUTION PREVENTION NOTES <br />1. THE CONTRACTOR SHALL IMPLEMENT EROSION CONTROL IN ACCORDANCE WITH COUNTY AND STATE <br />REQUIREMENTS AND AS SHOWN ON PLANS <br />2 THE CONTRACTOR SHALL MAINTAIN ALL EROSION CONTROL MEASURES, INCLUDING THE REMOVAL OF <br />ACCUMULATED SEDIMENT AT %CAPACITY FROM BMPS DURING THE DURATION OF CONSTRUCTION <br />UNTIL FINAL STABILIZATION IS ACHIEVED <br />3 CONTRACTOR TO ADHERE TO ALL TOWNSHIP AND COUNTY PERMIT REQUIREMENTS, INCLUDING THE <br />REQUIREMENT TO MINIMIZE THE AREA DISTURBED BY GRADING AT ANY GIVEN TIME AND TO <br />COMPLETE TURF RESTORATION WITHIN THE TIME REQUIRED BY THE PERMIT AFTER COMPLETION OF <br />GRADING OF AN AREA <br />4 ALL EXPOSED SOIL AREAS WITHIN 200 FEET OF A WATER OF THE STATE OR ANY STORMWATER <br />CONVEYANCE SYSTEM WHICH IS CONNECTED TO A WATER OF THE STATE MUST BE STABILIZED <br />WITHIN 24 HOURS <br />5 ALL CONSTRUCTION ENTRANCES SHALL BE SURFACED WITH CRUSHED ROCK (OR APPROVED EQUAL) <br />ACROSS FULL WIDTH FROM ENTRANCE POINT TO 50 FEET INTO THE CONSTRUCTION ZONE <br />6 ALL EROSION CONTROL MEASURES SHALL BE INSTALLED AND MAINTAINED IN ACCORDANCE WITH <br />CITY, COUNTY, AND STATE REQUIREMENTS <br />7 THE CONTRACTOR SHALL MAINTAIN ALL EROSION CONTROL MEASURES, INCLUDING THE REMOVAL OF <br />ACCUMULATED SILT IN FRONT OF SILT FENCES, SEDIMENT CONTROL LOGS, ETC DURING THE <br />DURATION OF THE CONSTRUCTION <br />8 MAINTAIN EXISTING EROSION CONTROL. RE-ESTABLISH ANY EXISTING EROSION CONTROL DISTURBED <br />BY CONSTRUCTION <br />9 CONTRACTOR SHALL PROVIDE ADDITIONAL TEMPORARY EROSION CONTROL MEASURES AS <br />REQUIRED FOR CONSTRUCTION <br />10 REMOVE ALL EROSION CONTROL MEASURES AFTER THE WORK HAS BEEN ACCEPTED BY THE <br />COUNTY, STATE, AND PROJECT ENGINEER <br />11 THE CONTRACTOR SHALL REMOVE ALL SOILS AND SEDIMENT TRACKED ONTO EXISTING STREETS AND <br />PAVED AREAS WITHIN 24 HOURS OF NOTICE IN ACCORDANCE WITH COUNTY AND STATE <br />REQUIREMENTS <br />12 IF BLOWING DUST BECOMES A NUISANCE, THE CONTRACTOR SHALL APPLY WATER FROM A TANK <br />TRUCK TO ALL CONSTRUCTION AREAS <br />13 STOCKPILED SOIL IS ONLY PERMITTED IN APPROVED LOCATION(S) AT SLOPES EQUAL TO OR FLATTER <br />THAN 2h 1v ALL STOCKPILED SOILS SHALL BE PROTECTED WITH TWO 6" DIAMETER COMPOST/ROCK <br />LOGS AND DAILY SURFACE PROTECTION <br />14 NO RE -FUELING OF TRUCK AND CONSTRUCTION EQUIPMENT IS PERMITTED ANYWHERE ON SITE <br />EXCEPT IN THE VICINITY OF FIELD APPROVED STAGING AREA(S) A CONSPICUOUSLY LABELED SPILL <br />KIT MUST BE ON SITE AND BE KEPT IN THE VICINITY OF THE STAGING AREA(S) <br />15 TRUCK AND CONSTRUCTION VEHICLE WASHING AND DEGREASING IS PROHIBITED ON SITE <br />CONSTRUCTION EQUIPMENT MUST BE THOROUGHLY CLEANED PRIOR TO ACCESSING THE SITE TO <br />LIMIT THE SPREAD OF INVASIVE SPECIES <br />16 NO HAZARDOUS MATERIALS (OIL, GAS, FLUIDS, PAINTS, LUBRICANTS, ETC ) ARE TO BE STORED ON <br />SITE <br />17 CONCRETE AND OTHER WASHOUT LIQUIDS SHALL BE CONTAINED IN A LABELED FACILITY. NO <br />WASHOUT MATERIAL SHALL DISCHARGE TO GROUND OR PAVEMENT SURFACES <br />18 ANY SEDIMENT REMAINING IN PLACE AFTER THE EROSION CONTROL DEVICE IS NO LONGER <br />REQUIRED SHALL BE GRADED TO CONFORM WITH THE EXISTING GRADE, PREPARED, AND SEEDED <br />WITH THE APPROPRIATE SEED MIX AS NOTED ON THE PLANS <br />19 SUITABLE GRADING MATERIAL SHALL CONSIST OF ALL SOIL ENCOUNTERED ON THE SITE WITH <br />EXCEPTION OF TOPSOIL, DEBRIS, ORGANIC MATERIAL AND OTHER UNSTABLE MATERIAL <br />CONTRACTOR SHALL STOCKPILE TOPSOIL AND GRANULAR FILL AT SUITABLE LOCATIONS AS <br />DETERMINED BY CONTRACTOR <br />20 EXISTING GRANULAR MATERIALS SHALL BE SEGREGATED AND STOCKPILED FOR REUSE ON -SITE <br />21 CONTRACTOR SHALL STRIP, STOCKPILE AND RE -SPREAD EXISTING ON -SITE TOPSOIL TO PROVIDE A <br />UNIFORM THICKNESS OF AT LEAST 6 INCHES ON ALL GRADED AREAS <br />22 SUBGRADE EXCAVATION SHALL BE BACKFILLED IMMEDIATELY AFTER EXCAVATION TO HELP OFFSET <br />ANY STABILITY PROBLEMS DUE TO WATER SEEPAGE OR STEEP SLOPES WHEN PLACING NEW <br />SURFACE MATERIAL ADJACENT TO EXISTING PAVEMENT, THE EXCAVATION SHALL BE BACKFILLED <br />PROMPTLY TO AVOID UNDERMINING OF THE EXISTING PAVEMENT <br />23 GRADES SHOWN ARE FINISHED GRADES, CONTRACTOR SHALL ROUGH GRADE TO SUBGRADE <br />ELEVATION, LEAVE SITE READY FOR SUBBASE <br />24 FINAL GRADING TOLERANCES ARE t0 1 FEET OF PLAN GRADES OVERFLOW SPILLWAYS ARE TO BE <br />GRADED TO WITHIN *0 05 FEET OF GRADE PLANS, UNLESS NOTED OTHERWISE <br />25 ALL EXCESS MATERIAL, BITUMINOUS SURFACING, CONCRETE ITEMS, ANY ABANDONED UTILITY ITEMS, <br />AND OTHER UNSTABLE MATERIALS SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND SHALL <br />BE DISPOSED OFF THE CONSTRUCTION SITE DISPOSAL SHALL BE DONE IN A MANNER THAT MEETS <br />ALL APPLICABLE REGULATIONS <br />26 CONTRACTOR IS RESPONSIBLE FOR GRADING AND SLOPING THE FINISHED GROUND SURFACE TO <br />PROVIDE SMOOTH & UNIFORM SLOPES, WHICH PROVIDE POSITIVE GRADE AND PREVENT PONDING IN <br />LOWER AREAS <br />27 SLOPES AT 31 OR STEEPER, AND/OR WHERE INDICATED ON THE PLANS SHALL BE SEEDED AND HAVE <br />AN EROSION CONTROL BLANKET INSTALLED OR MAY BE HYDROSEEDED WITH BONDED FIBER MATRIX <br />(BFM) <br />GENERAL LANDSCAPE NOTES <br />1 CONTRACTOR SHALL INSPECT THE SITE AND BECOME FAMILIAR WITH EXISTING CONDITIONS <br />RELATING TO THE NATURE AND SCOPE OF WORK <br />2 CONTRACTOR SHALL VERIFY PLAN LAYOUT AND BRING TO THE ATTENTION OF THE ENGINEER <br />DISCREPANCIES WHICH MAY COMPROMISE THE DESIGN OR INTENT OF THE LAYOUT <br />3 CONTRACTOR SHALL ASSURE COMPLIANCE WITH APPLICABLE CODES AND REGULATIONS GOVERNING <br />THE WORK AND MATERIALS SUPPLIED <br />4 CONTRACTOR SHALL PROTECT EXISTING ROADS, CURBS/GUTTERS, TRAILS, TREES, IRRIGATION <br />SYSTEM, LAWNS AND SITE ELEMENTS DURING CONSTRUCTION OPERATIONS <br />5 CONTRACTOR SHALL REVIEW THE SITE FOR DEFICIENCIES IN SITE CONDITIONS WHICH MIGHT <br />NEGATIVELY AFFECT PLANT ESTABLISHMENT, SURVIVAL OR WARRANTY UNDESIRABLE SITE <br />CONDITIONS SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER PRIOR TO BEGINNING OF <br />WORK <br />GENERAL EARTHWORK NOTES <br />1 EARTHWORK ASSUMPTIONS <br />1 1 SEE CONTRACT DOCUMENTS FOR INCLUSIONS, INCLUDING BUT NOT <br />LIMITED TO MEASUREMENT & PAYMENT <br />1 2 ALL ON -SITE TOPSOIL INCLUDES ARE PLAN (P) QUANTITIES <br />1 3 TOPSOIL, ON -SITE INCLUDES A SUBCUT OF 4" DEEP FOR SOIL <br />HANDLING IN ADDITION TO CUT TO FILL, AND AS SUCH IS INCLUDED <br />IN QUANTITY FOR COMMON EXCAVATION <br />TOPSOIL RESPREAD SHALL BE A MINIMUM OF 4" <br />2 AGGREGATE QUANTITY DOES NOT INCLUDE ADDITIONAL VOLUME OF MATERIAL TO ACHIEVE <br />COMPACTION <br />Item No. <br />MnDOT Ref # <br />Item <br />Estimated <br />Quantity <br />Units <br />1 <br />2021.501 <br />MOBILIZATION <br />1 <br />LS <br />2 <br />2101.502 <br />CLEARING <br />163 <br />EA <br />3 <br />2101.502 <br />GRUBBING <br />163 <br />EA <br />4 <br />2106.507 <br />COMMON EXCAVATION 143 CY CUT;989 CY FILL; NET 846 CY FILL) <br />989 <br />CY <br />5 <br />2118.507 <br />AGGREGATE SURFACING CLASS 5 (CV) <br />451 <br />CY <br />6 <br />2521.518 <br />CONCRETE EQUIPMENT PAD <br />1 <br />LS <br />7 <br />2557.502 <br />20' VEHICULAR GATE, CHAIN LINK <br />2 <br />EA <br />8 <br />2557.503 <br />PERIMETER FENCE, WOVEN WIRE <br />4370 <br />LF <br />9 <br />2571.502 <br />TRANSPLANT TREE <br />24 <br />EA <br />10 <br />2573.501 <br />EROSION CONTROL SUPERVISOR <br />1 <br />LS <br />11 <br />2573.501 <br />STABILIZED CONSTRUCTION EXIT: FURNISH, INSTALL, MAINTAIN AND REMOVE <br />1 <br />LS <br />12 <br />2573.503 <br />SILT FENCE: FURNISH, INSTALL, MAINTAIN, AND REMOVE <br />2365 <br />LF <br />13 <br />2575.505 <br />SEEDING <br />24.5 <br />AC <br />14 <br />2575.608 <br />SEED MIXTURE SPECIAL (NRS NATIVE MIX @ 13.29 LB / ACRE) <br />325 <br />LB <br />15 <br />2575.509 <br />MULCH MATERIAL, TYPE 3 CRIMPED STRAW @ 2 TON / ACRE <br />49 <br />TON <br />E0/ <br />water <br />ecology <br />community <br />EMMONS & OLIVIER RESOURCES, INC. <br />1919 UNIV. AVE. W. #300 ST. PAUL, MN <br />TEL 651.770.8448 WWW.EORINC.COM <br />I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS <br />PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM <br />A DULY LICENSED PROFESSIONAL ENGINEER UNDER <br />THE LAWS OF TH6STATE OF MINNESOTA <br />DATE <br />NO <br />DESCRIPTION <br />02/18/2025 <br />IFPR - ISSUED FOR PERMIT REVIEW <br />03/10/2025 <br />2 <br />IFPR UPDATED PER CITY REVIEW COMMENTS <br />3 <br />DESIGNED BY ERK <br />DRAWN BY BMP <br />CHECKED BY•KDC <br />CEDRR CREEK <br />Zvled' <br />LANDFILL SOLAR <br />RAMSEY, ANOKA COUNTY, MINNESOTA <br />NOTES & SEQ <br />KYLE D CRAWFORD DATE 02/18/2025 <br />LICENSE #54906 <br />4 <br />5 <br />6 <br />FOR JOB #1518-0020 <br />CEDAR CREEK ENERGY <br />RAMSEY, MINNESOTA, 55303 <br />SHEET 02 OF 11 <br />