My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 04/08/2025
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2025
>
Agenda - Council Work Session - 04/08/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 3:11:46 PM
Creation date
4/3/2025 2:14:57 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
04/08/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />2 Front fagade means the vertical face of a building oriented along or toward the street to which <br />3 the building is addressed. The area of the front fagade is calculated by multiplying the length of <br />4 the wall facing the street, as measured from edge to edge along the grade adjacent to the build- <br />s ing, by the height of that same wall, as measured from the average grade adjacent to the build- <br />6 ing to the top of the parapet or eaves, whichever is less. <br />Front view <br />RI <br />Parapet <br />0 <br />- <br />------------------------------------------------- <br />. <br />o <br />a <br />o <br />o <br />+� 0 <br />Length of front facade <br />7 <br />Page 5 of 30 <br />Pa, ra pet aide view <br />Length of side facade <br />
The URL can be used to link to this page
Your browser does not support the video tag.