My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 01/09/2024
Ramsey
>
Public
>
Agendas
>
Council
>
2024
>
Agenda - Council - 01/09/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 3:42:52 PM
Creation date
4/8/2025 2:42:18 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
01/09/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
330
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. 16. <br />CC Regular Session <br />Meeting Date: 01/09/2024 <br />Primary Strategic Plan Initiative: Address infrastructure needs. <br />Information <br />Title <br />Adopt Resolution #24-012 Ordering Plans and Specifications for 2024 Crack Seal Improvements, Improvement <br />Project #24-08 <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to adopt Resolution #24-012 ordering plans and specifications for 2024 Crack Seal <br />Improvements, Improvement Project #24-08. <br />Background: <br />Crack seal improvements are completed annually, on between 10 and 23 miles of public street segments to <br />cost-effectively maximize the life of the bituminous pavement. <br />Crack sealing protects pavement by preventing stormwater runoff from seeping through cracks in the pavement <br />and joints between the pavement and concrete curb and gutter, and utility castings, reducing future pavement <br />damage caused by wet subgrade soils, especially during freeze -thaw cycles. <br />The City's current pavement maintenance schedule calls for public streets to be crack sealed the third, seventh, <br />and fourteenth year following construction, reconstruction, and overlay improvements. However, while this is the <br />typical maintenance schedule it is important to note that Staff reviews the condition of all streets annually and <br />adjusts the schedule of maintenance operations based on actual pavement conditions. <br />A total of 13.58 miles of public street segments are proposed to receive crack seal improvements in 2024. These <br />street segments were selected based on age, pavement maintenance history, and Pavement and Surface Evaluation <br />Rating (PASER) values. Selected streets generally have PASER values between 7 and 10. <br />A draft 2024 Crack Seal Map is attached to this case for reference. Final plans and specifications are proposed to <br />be prepared in-house as part of Staff s normal duties. <br />Preliminary Schedule Remaining <br />• Council approves plans and specifications, authorizes advertisement for bids <br />o January 23, 2024 <br />• Bids are publicly opened <br />o Week of March 18, 2024 <br />• Council awards contract to the lowest responsible bidder <br />o March 26, 2024 <br />• Contractor begins improvements <br />o Late April / early May 2024 <br />• Contractor completes improvements <br />o May 31, 2024 <br />The proposed improvements are designated as City Improvement Project #24-08, 2024 Crack Seal Improvements. <br />
The URL can be used to link to this page
Your browser does not support the video tag.