My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 01/09/2024
Ramsey
>
Public
>
Agendas
>
Council
>
2024
>
Agenda - Council - 01/09/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 3:42:52 PM
Creation date
4/8/2025 2:42:18 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
01/09/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
330
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. 18. <br />CC Regular Session <br />Meeting Date: 01/09/2024 <br />Primary Strategic Plan Initiative: Address infrastructure needs. <br />Information <br />Title <br />Adopt Resolution #24-014 Approving Plans and Specifications and Authorizing Advertisement for Bids for Halls <br />Dover Acres Street Reconstructions, Improvement Project #24-02 <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to adopt Resolution #24-014 ordering plans and specifications and authorizing <br />advertisement for bids for Halls Dover Acres Street Reconstructions, Improvement Project #24-02. <br />Background: <br />City Improvement Project #24-02 proposes to reconstruct the streets within the Halls Dover Acres subdivision, <br />generally located east of Nowthen Boulevard between 157th Lane and 158th Lane. The 2024 — 2033 Capital <br />Improvement Program (CIP) identifies the streets within the Halls Dover Acres subdivision for street <br />reconstruction in 2024. A street segment summary for the project is attached to this case. <br />Project History <br />• 2024 — 2033 Capital Improvement Program — listed as street reconstruction for 2024. <br />• June 13, 2023, Resolution #23-130, the Ramsey City Council accepted proposals for topographic survey of <br />the project area. <br />• June 27, 2023, Resolution #23-129, the Ramsey City Council accepted proposals for geotechnical report of <br />the project area. <br />• August 22, 2023, Resolution #23-198, the Ramsey City Council ordered Staff to prepare plans and <br />specifications. <br />• November 21, 2023, the Ramsey Public Works Committee recommended the project include the proposed <br />trunk watermain extension, including allowing service connections to properties along the route of the trunk <br />watermain. <br />Pavement History <br />The streets within Halls Dover Acres were built in 1976. The streets received an overlay improvement in 1990, <br />which included widening the pavement width to 24 feet. Following the overlay, crack seal / seal coat <br />improvements were completed in 1996 and 2004. Maintenance crews have performed patching over the last <br />several years, including extensive patching in 2023. <br />Existing Conditions <br />The streets are 24 feet wide rural sections with drainage swales adjacent to the roadway, totaling 0.98 miles in <br />length. Traffic counts have not been taken, but Staff anticipates higher than typical neighborhood traffic along <br />157th Lane, due to the daycare center located at the intersection of 157th Lane and Nowthen Boulevard, but not <br />rising to the level of a collector street. <br />Sewer and water exist in the subdivision to the east, but the Halls Dover Acres subdivision is not located within <br />the MUSA. The 2040 Comprehensive Plan proposed water system improvements does include extending 12-inch <br />trunk watermain along 157 th lane from Potassium Street to Nowthen Boulevard as part of a trunk system loop. <br />This trunk watermain extension is proposed to occur as part of this project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.