My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/11/2024
Ramsey
>
Public
>
Agendas
>
Council
>
2024
>
Agenda - Council - 06/11/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 4:15:37 PM
Creation date
4/8/2025 4:02:46 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/11/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
294
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT B <br />Fees Payable to the City <br />1. Park Dedication. The PERMITTEE is responsible for satisfying applicable Park <br />Dedication Fee requirements. PERMITTEE must pay a Park Dedication Fee of <br />$121,500.00 (27units x $4,500.00 per unit). The PERMITTEE acknowledges that these <br />fees are estimates. The rate in effect when the Plat is recorded will be collected. <br />2. Trail Development Fees. The PERMITTEE is responsible for satisfying applicable Trail <br />Development Fee requirements. PERMITTEE must pay a Trail Development Fee of $ <br />40,500.00 (27 units x $1,500.00 per unit). The PERMITTEE acknowledges that these fees <br />are estimates. The rate in effect when the Plat is recorded will be collected. <br />3. Sanitary Sewer Connection (Trunk) Fees. The PERMITTEE is responsible for satisfying <br />applicable Sanitary Sewer Trunk Fee requirements. PERMITTEE must pay a Sanitary <br />Sewer Trunk Fee of $36,423.00 (27 units x $1,349.00). The PERMITTEE acknowledges <br />that these fees are estimates. The rate in effect when the Plat is recorded will be collected. <br />4. Water Connection (Trunk) Fees. The PERMITTEE is responsible for satisfying applicable <br />Water Trunk Fee requirements. PERMITTEE must pay a Water Trunk Fee of $54,243.00 <br />(27 units x $2,009.00 per unit). The PERMITTEE acknowledges that these fees are <br />estimates. The rate in effect when the Plat is recorded will be collected. <br />5. Stormwater Management Fee. The PERMITTEE is responsible for satisfying applicable <br />Stormwater Trunk Fee requirements. PERMITTEE must pay a Stormwater Management <br />Fee of $14,418.00 (27 units x $534.00 per unit). The PERMITTEE acknowledges that <br />these fees are estimates. The rate in effect when the Plat is recorded will be collected. <br />6. COR Stormwater Basin Contribution. The PERMITTEE is responsible for paying <br />$27,677.50 to contribute to the costs of the regional stormwater basin in lieu of providing <br />on -site stormwater basins. This amount covers the current phase and future phases within <br />Outlot C. <br />7. Street Sign Fee. While the CITY provides and installs the street name and traffic control <br />signage, the PERMITTEE is responsible for paying for them at a rate of $ 265.00 per sign. <br />PERMITTEE must pay a Street Sign Fee of $ 2,385.00 (4 x 265 street name signs; 1 x $ <br />265.00 no parking signs; 4 x $ 265.00 stop signs). <br />8. Development Fees for the Outlots. The PERMITTEE acknowledges that development <br />fees are not being collected for any Outlots. The PERMITTEE acknowledges that <br />development fees will be due upon development of any of the Outlots. The rate in effect <br />at the time said future plat(s) is recorded will be collected. <br />9. Contribution to Ramsey Parkway Construction. The PERMITTEE will contribute <br />$256,600.00 towards the construction costs of Ramsey Parkway per the signed purchase <br />agreement. <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.