My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/11/2024
Ramsey
>
Public
>
Agendas
>
Council
>
2024
>
Agenda - Council - 06/11/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 4:15:37 PM
Creation date
4/8/2025 4:02:46 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/11/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
294
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Catchment Profiles <br />Project ID: RR8mA <br />Rivers Bend Park <br />Pond Modification <br />Drainage Area — 38.0 acres <br />Location — Rivers Bend Park south of 142nd Ave <br />NW — Waco St. NW intersection <br />Property Ownership — P u b l i c <br />Site Specific Information — The existing pond, <br />P25216 receives drainage from the entire <br />catchment and is currently undersized to treat the <br />contributing drainage area. An expansion and <br />dredging of the pond is recommended to increase <br />the permanent pool storage, thereby promoting <br />sediment settling and phosphorus retention. <br />Proposed increases in pond storage will increase <br />permanent pool surface area from .11 acres to .82 <br />acres and average ponding depth from 1 ft. to 6 <br />f C I d I Id <br />BM Modification <br />i r BMPdranageArea ' <br />AStorm Sewer Lime <br />0 Outfail <br />r". IIL}, Ili;. 0 Catch Basin <br />y y <br />NN <br />e - <br />;ti 4 jop <br />lot <br />,,*- <br />�-- V av <br />� * +� � � is •, <br />5 <br />rVk <br />r 3 . <br />a 0 0.025 9.05 0.1 <br />L. umu ative pon storage vo ume cou <br />increase from an estimated 0.05 acre-feet to approximately 2.0 acre-feet. <br />Cost/Removal Analysis <br />2 <br />3 <br />• - • <br />' <br />• <br />3,100 <br />cu-yards <br />3,100 <br />cu-yards <br />31100 <br />cu-yards <br />7.7 <br />47.8% <br />7.7 <br />47.8 % <br />7.7 <br />47.8 % <br />31672 <br />66.4% <br />31672 <br />66.4% <br />31672 <br />66.4% <br />• <br />0.2 <br />1.0% <br />0.2 <br />1.0% <br />0.2 <br />1.0% <br />$5,840 <br />$5,840 <br />$5,840 <br />- <br />• - • - <br />$147,000 <br />$193,500 <br />$245,000 <br />$152,840 <br />$199,340 <br />$250,840 <br />• • �. ► <br />$900 <br />$900 <br />$900 <br />30-yr Average Cost/lb-TP <br />$779 <br />$980 <br />$1,203 <br />u <br />30-yr Average Cost/1,000lb-TSS <br />$1,633 <br />$2,055 <br />$2,522 <br />W <br />30-yr Average Cost/ac-ft Vol. <br />N/A <br />N/A <br />N/A <br />*Indirect Cost: 80 hours at $73/hour <br />**Direct Cost: See Appendix B for detailed cost information <br />***$1,000/acre of pond surface area - Annual inspection and sediment/debris removal from pretreatment area <br />City of Ramsey Stormwater Retrofit Analysis <br />
The URL can be used to link to this page
Your browser does not support the video tag.