My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/11/2024
Ramsey
>
Public
>
Agendas
>
Council
>
2024
>
Agenda - Council - 06/11/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 4:15:37 PM
Creation date
4/8/2025 4:02:46 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/11/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
294
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. 17. <br />CC Regular Session <br />Meeting Date: 06/ 11 /2024 <br />Primary Strategic Plan Initiative: Address infrastructure needs. <br />Information <br />Title <br />Adopt Resolution #24-160 Approving Construction Contingency Expense No. 6 for Improvement Project #21-09, <br />Centralized Water Treatment Plant <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to adopt Resolution #24-160 approving Construction Contingency Expense No. 6 for <br />Improvement Project #21-09, Centralized Water Treatment Plant. <br />Background: <br />The Water Treatment Plant (WTP) project includes a construction contingency cost of $950,000 intended to pay <br />for new items during construction that were not contemplated during the design process or for items that the <br />owner, engineer, or contractor(s) propose ro rev ise during construction. <br />The attached letter from Resident Project Representative Ryan Hanson with Advanced Engineering and <br />Environmental Services, Inc. (AE2S), the City's contracted project engineer, identifies items proposed to be <br />adjusted during construction to date, including as part of Construction Contingency Expense No. 6. The letter <br />identifies all adjustments and all spent and remaining construction contingency funds. <br />No extension of time is being requested as part of Construction Contingency Expense No. 6. However, the <br />contractor may decide at a later date to request an extension of time depending on the availability of required <br />materials related to Construction Contingency Expense No. 6. If a time extension request is made, it will be <br />presented at a later date in the form of a formal Change Order request. <br />Notification: <br />Notifications are not required for this case. <br />Observations/Alternatives: <br />Observations: <br />Modifications proposed as part of Construction Contingency Expense No. 6 will improve the maintenance, <br />operations and safety of the Water Treatment Plant, and removes unnecessary construction costs. <br />Attached is a Project Budget Status letter from Aaron Vollmer with AE2S that was reviewed by the Public Works <br />Committee on May 21, 2024. The letter summarizes the Construction Contingency Expenses that had been <br />processed to date (CCE's # 1 through #5) and provides context on what the City of Ramsey can expect to spend <br />from these funds during the remainder of the project based on similar previous projects designed and managed by <br />AE2S. In summary, AE2S feels the project is progressing well and is not likely to require additional funding to <br />cover change orders beyond what is already reserved in the construction contingency allowance. <br />Alternatives: <br />Motion to adopt Resolution #24-160 approving Construction Contingency Expense No. 6 for Improvement <br />Project #21-09, Centralized Water Treatment Plant. <br />
The URL can be used to link to this page
Your browser does not support the video tag.