n E, ZS <br />www.ae2s.com <br />June 6, 2024 <br />Bruce Westby <br />City of Ramsey <br />7550 Sunwood Drive NW <br />Ramsey, MN 55303 <br />Re: Water Treatment Plant — Construction Contingency Expense No. 6 <br />Dear Mr. Westby: <br />AE2S continues to oversee the construction of the City of Ramsey's new WTP. Magney has completed the <br />concrete pours for the reservoir as well as most of the concrete pours at the subgrade level of the Water <br />Treatment Plant. Magney has also completed both the Backwash Tank and Clearwell base slabs and walls, <br />top slab for the clearwell, and are starting to work on the top slab for the backwash tank. Our engineering <br />team has continued to coordinate with Magney and further refine the installation details of other pieces of <br />equipment. Through those investigations we have identified some items that will require adjustments. This <br />letter is intended to outline those adjustments and summarize the current project budget in order for the <br />City to fully understand the status of the project. <br />Basis for of Construction Contingency Expenses: <br />Currently fifteen (15) requests for pricing (RFP) have been submitted to Magney. A full list of those <br />requests are shown below. To date AE2S has received pricing back on all fifteen (15) of the RFP's, and <br />eleven (11) separate proposals. We would like to move forward and process Construction Contingency <br />Expense No. 6, which will include price Proposal No. 022, No. 023, No. 024, No. 025, and No. 026. If the <br />Contractor would like to include a request for extension as a result of these changes, a formal Change Order <br />request will be issued at a different time. <br />Proposal <br />No. <br />Initiation <br />Description <br />Total Cost <br />Required <br />Status <br />001 <br />RFP 001 <br />Mixing Pumps Pipe <br />$511287.38 <br />y <br />Approved — <br />Upsizing <br />Construction Contingency Expense 1 <br />002 <br />RFP 003 <br />Admin Ceiling Grid Color <br />$21609.25 <br />N <br />Approved — <br />Construction Contingency Expense 1 <br />003 <br />Incidental <br />Building Permit <br />$621887 28 <br />y <br />Approved — <br />Reimbursement <br />Construction Contingency Expense 2 <br />004 <br />RFP 002 <br />Upsizing Air Exchange in <br />$161580.02 <br />N <br />Approved — <br />Plate Settler Room <br />Construction Contingency Expense 2 <br />005 <br />RFP 006 <br />Storm and Plumbing <br />$221550.28 <br />y <br />Approved — <br />Updates <br />Construction Contingency Expense 1 <br />006 <br />RFP 005 <br />Flowable Fill <br />- <br />N <br />Rej ected <br />007 <br />RFP 004 <br />Blower Pipe Upsizing <br />$551230.60 <br />y <br />Approved — <br />Construction Contingency Expense 2 <br />008 <br />City <br />Groundbreaking Signage <br />$956.12 <br />y <br />Approved — <br />Request <br />Reimbursement <br />Construction Contingency Expense 2 <br />009 <br />City <br />Prevailing Wages <br />$7941153.71 <br />y <br />Approved — <br />Request <br />Change Order 01 <br />O10 <br />RFP 007 <br />Backwash Supply Piping <br />$3,068.77 <br />y <br />Approved — <br />Modifications <br />Construction Contingency Expense 3 <br />Oil <br />Field Order <br />002 <br />Electrical Modifications <br />TBD <br />TBD <br />EXPECTED <br />012 <br />RFI 013 <br />Accordion Folding <br />$101010.85 <br />N <br />Approved — <br />Security Door <br />Construction Contingency Expense 3 <br />Advanced Engineering and Environmental Services, Inc. <br />6901 East Fish Lake Road, Suite 184 • Water Tower Place Business Center • Maple Grove, MN 55369 • 763-463-5036 <br />