My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/11/2024
Ramsey
>
Public
>
Agendas
>
Council
>
2024
>
Agenda - Council - 06/11/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 4:15:37 PM
Creation date
4/8/2025 4:02:46 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/11/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
294
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ACNE <br />www.magneyconstruction.com <br />CONSTRUCTION Proposal <br />rnMMERCIAI. FT IWINTRIAL CONTRAffNi-, <br />1401 Park Road - Chanhassen, MN 55317 <br />952.474.1674 Office 952.474.1679 Fax <br />SEND TO <br />Company name <br />From <br />AE2S <br />Noah Pundsack <br />Attention <br />Date: 0610312024 <br />Mr. Ryan Hanson <br />E-mail Phone <br />Magney Proposal # 023 <br />Ryan.Hanson@ae2s.com (612) 220-0154 <br />Request For Proposal No. 014 Reservoir Vent Piping <br />r] Urgent r] Please comment RiPlease review <br />Total pages, including cover. 3 <br />COMMENTS <br />Re: Ramsey Water Treatment Plant - Ramsey, MN <br />For your information <br />Ryan, <br />Magney Construction, Inc. is pleased to present the following quotation to provide the necessary labor, <br />material and equipment to modify the 14" Reservoir vent pipe by adding two additional feet to the existing <br />vent piping, which includes cutting and welding. The costs associated with this change are summarized <br />below. <br />Labor: Offloading, Assist with Cutting &Installation of Piping $ 343.34 <br />Material: Additional Costs For Added Pipe Extension. (incl. tax) (see attached) $ 1,215.74 <br />Equipment: Misc. Small Tools and Equipment (10% of Labor) $ 34.33 <br />Subcontractor: Bald Eagle Cut And Weld Vent Pipe (see attached) $ 1,680.00 <br />Subtotal $ 3,273.41 <br />General Contractor's Overhead <br />Bond & Insurance premiums <br />Lump Sum Total: <br />$ 323.01 <br />$ 49.10 <br />8 <br />Additional Working Days Required for this Change(including material lead time): 2.0 <br />Please review this proposal and feel free to contact me with any questions, comments or concerns. <br />Thank you, <br />A/044 )Pacddl Woe <br />Noah Pundsack <br />Project Engineer <br />Accepted By Date <br />3,645.52 <br />Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.