Laserfiche WebLink
Request For Proposal No. 014 <br />Date of Issuance: <br />Project Manager: Aaron Vollmer, P.E. <br />AE2S <br />Water Tower Place Ste 184 <br />6901 E. Fish Lake Road <br />Maple Grove, MN 55369 <br />Contractor: Magney Construction Inc. <br />Project: Ramsey Water Treatment Plant <br />Owner: City of Ramsey, Minnesota <br />Re: Reservoir Air Vent Piping <br />Please submit a cost proposal for changes to the Contract Documents for the following <br />proposed modifications. THIS IS NOT A WORK CHANGE DIRECTIVE, CHANGE <br />ORDER, OR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED IN THE <br />PROPOSED MODIFICATIONS. <br />Description: <br />AE2S requests pricing from Magney for the cost/credit of modifying the elevation of the <br />air vent piping in the reservoir top slab. Currently the air vent effluent has 2 ft of <br />clearance from the top of the CI P slab. This clearance needs to be altered to 2 ft above <br />the final finished elevation of the top of the reservoir — including insulation. See attached. <br />