Laserfiche WebLink
FRESH <br />Irzi <br />Office: 651-447-2218 <br />Date 512112024 <br />We are pleased to submit a proposal for the following project: <br />For the following sections: <br />Ramsey MN WTP <br />RFP 015 —changes to backwash waste pipe <br />Our Proposal is for: <br />One thousand forty dollars. $11040s00 <br />RFP dated: 10/ 17/2023 <br />Addenda: N/A <br />Unit Prices: None <br />Allowances: None <br />Alternates: Deduct $360 if the pending change order switching the project to prevailing wages is not approved and <br />prevailing wages are not applicable <br />OUR BASE BID INCLUDES: <br />1. Labor, materials, travel, and overhead to paint additional elbow, flanges, and nuts/bolts <br />2. Prevailing wages as of 10/17/2023, including additional taxes, unemployment insurance costs, and back - <br />office burden for prevailing wage reporting. Highway/heavy wage rate for painters is $70.39 per hour. <br />OUR BASE BID DOES NOT INCLUDE: <br />1. Any bonds required by Owner or GC. <br />2. Pipe labeling. <br />3. Temp heat indirect, externally -vented temp heat to be provided by GC or Owner if needed. <br />OTHER BID NOTES: <br />1. All paint systems included in this bid will be Sherwin-Williams products. Where factory/shop priming is <br />required by spec, please ensure manufacturers are using the appropriately compatible Sherwin-Williams <br />primer. <br />SETTING THE STANDARD. BETTER BLASTING. PERIOD. <br />