Laserfiche WebLink
ACNE <br />www.magneyconstruction.com <br />CONSTRUCTION Proposal <br />rnMMERCIAI. FT IWINTRIAL CONTRAffNi-, <br />1401 Park Road - Chanhassen, MN 55317 <br />952.474.1674 Office 952.474.1679 Fax <br />SEND TO <br />Company name <br />From <br />AE2S <br />Noah Pundsack <br />Attention <br />Date: 0512412024 <br />Mr. Ryan Hanson <br />E-mail Phone <br />Magney Proposal # 025 <br />Ryan.Hanson@ae2s.com (612) 220-0154 <br />RFP No. 017 Additional Waterstop <br />r] Urgent r] Please comment RiPlease review <br />Total pages, including cover. 2 <br />COMMENTS <br />Re: Ramsey Water Treatment Plant - Ramsey, MN <br />Ryan, <br />For your information <br />Magney Construction, Inc. is seeking compensation for the additional labor, material, and equipment needed <br />to complete the changes, as directed by AE2S, to add additional waterstop not shown on drawings at <br />elevation 86' in Water Treatment Plant and 93' in the Reservoir. Please see the costs associated with this <br />change are summarized below. <br />Labor: Install an Additional 724 LF of Waterstop <br />$ <br />53411.90 <br />Material: Additional 6" Waterstop (see attached) <br />$ <br />3,256.55 <br />Equipment: Misc. Small Tools and Equipment (10% of Labor) <br />$ <br />541.19 <br />Subcontractor: <br />Subtotal <br />$9,209.64 <br />General Contractor's Overhead <br />$ <br />1,381.45 <br />Bond &Insurance premiums <br />$ <br />158.87 <br />Lump Sum Total: <br />$ <br />107749.95 <br />Additional Calendar Days Required for this Change(including material lead time): 1.0 <br />Please review this proposal and feel free to contact me with any questions, comments or concerns. <br />Thank you, <br />Noun Psimd"e4 <br />Noah Pundsack <br />Project Engineer <br />Accepted By Date <br />Page 1 of 1 <br />