My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/22/2025
Ramsey
>
Public
>
Agendas
>
Council
>
2025
>
Agenda - Council - 04/22/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2025 3:41:34 PM
Creation date
4/21/2025 10:38:46 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/22/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
389
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bunker Lake Boulevard <br />April 2, 2025 <br />Page2of3 <br />The existing trail on the north side of the roadway will remain in -place. No improvements to the trail are <br />proposed at this time. <br />There will be some coordination with developers/property owners along the corridor. The design may <br />need to be adjusted to accommodate potential developments. <br />Bunker Lake Boulevard is Municipal State Aid (MSA) street, which means that MnDOT MSA approval will <br />be required prior to bidding. An Anoka County permit will most likely also be required for work in the <br />Armstrong Boulevard right of way. <br />A LRRWMO Permit will be required due to the new impervious surface. We will assist the City with <br />obtaining this permit as a part of the design process. <br />The project schedule will require plans to be completed by the end of October 2025 to allow for bidding <br />in December of 2025 or January 2026. <br />We understand that City staff will prepare all council cases and hold the open house meeting. We will <br />provide a project layout for use by the City at the open house. <br />We have assumed the City will prepare any required feasibility report and/or council reports required. <br />SCOPE OF WORK <br />Bolton & Menk will assist the City with survey, design, and bidding related services for the project. Our <br />work will include the following tasks: <br />• Survey — This task will include a topographic survey and drone image of the site. We will also <br />complete a Gopher State One Call/map request, complete utility mapping, and complete <br />base map preparation. <br />• Traffic Study Update — We will review past studies, review current development strategies, <br />and provide recommendations related to lane configurations and turn lane lengths. This will <br />not be an in-depth, comprehensive analysis, but instead will be a more general review of <br />existing documentation. <br />• Design — Design services will generally include the following tasks: <br />o Attendance at design meetings, <br />o Site visits to review the existing roadways and adjacent properties, and <br />o Construction Documents for the use of permitting, bidding and construction. <br />• Public Streets and Utilities - Design services to include: <br />o We have assumed that Bunker Lake Boulevard will be designed to a 10-ton section, <br />and will have a 3-lane, urban -section configuration, similar to the constructed <br />section to the west, <br />o A review of sanitary sewer televising report and incorporation of findings into the <br />plans. We have assumed that manhole casting adjustments will be the only sanitary <br />sewer improvements required for the project, <br />o No watermain-related work is anticipated, other than valve box and fire hydrant <br />adjustments, and <br />Bolton & Menk is an equal opportunity employer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.