Laserfiche WebLink
o 0.20 miles of urban section with concrete curb and gutter <br />• Section 16 Unplatted <br />o 0.52 miles of rural section <br />• Wildwood Acres <br />o 0.75 miles of rural section <br />• Generally, mill and overlay improvements only require topographic survey of the pedestrian ramps for <br />ADA upgrades. <br />In total, the 2025 — 2034 CIP proposes to reconstruct approximately 7.39 miles and overlay 5.39 miles of public <br />roads in 2026. <br />Staff require this topographic survey data to properly design the 2026 proposed improvement projects. <br />Topographic surveys are essential to locate all existing site features and to create an existing ground surface, <br />which is used as the basis for designing the project. <br />Street segment summaries and the 2025 Draft Pavement Management Program map are attached to this case for <br />reference. <br />Notification: <br />If City Council accepts proposals, staff will mail letters to property owners within the project areas proposed to be <br />included within the topographic survey area(s) to inform them of the proposed 2026 projects and the need for the <br />topographic survey data. <br />Time Frame/Observations/Alternatives: <br />Alternatives: <br />Motion to adopt Resolution #25-082 accepting proposals for topographic surveys for 2026 Capital Improvement <br />Program projects. <br />Funding Source: <br />Funding for this work is proposed to come from a combination of Pavement Management Funds, Municipal State <br />Aid Funds, and Storm Water Utility Funds. <br />Staff requested proposals from two (2) firms known to perform this type of work. Proposals were received from <br />both firms, which are tabulated below. <br />Project Bolton & Menk Hakanson <br />Anderson <br />IP 26-02 MSA Overlay Improvements $2,243.50 $2,640.00 <br />IP 26-02 Wetland Boundary Determination $5,800.00 $2,920.00 <br />IP 26-03 Carol -Rose Acres & Sports Haven Street Reconstructions $5,461.00 $7,900.00 <br />IP 26-04 Countryside Estates Street Reconstructions $14,528.50 $16,500.00 <br />IP 26-05 Flintwood Hills 2nd & 3rd Street Reconstructions $3,803.50 $6,600.00 <br />IP 26-06 Riverside West Street Reconstructions $1,366.00 $2,650.00 <br />IP 26-07 Section 01 Unplatted S/CR 27 Street Reconstructions $6,728.50 $9,100.00 <br />IP 26-08 2026 Neighborhood Pavement Overlay Improvements $1,268.50 I $3,000.00 <br />Total Amount for all projects 1$41,199.50 $51, 310.00 <br />Hakanson Anderson submitted the lowest responsible proposal for the topographic survey and wetland boundary <br />determination for Improvement Project 26-02. Based on the submitted proposals, staff recommend accepting the <br />proposals for Improvement Project 26-02 from Hakanson Anderson for the total amount of $5,560.00. Hakanson <br />Anderson is required to complete their work by July 31, 2025, per the schedule in the RFP. <br />