My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/22/2025
Ramsey
>
Public
>
Agendas
>
Council
>
2025
>
Agenda - Council - 04/22/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2025 3:41:34 PM
Creation date
4/21/2025 10:38:46 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/22/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
389
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. IP 26-07 Section 01 Unplatted S/CR 27 Street Reconstructions <br />a. Right of Way is generally 66-feet wide <br />i. ROW Topo Area is 11.60 acres <br />b. Streets are approximately 1.44 miles in total length <br />i. 24-foot wide mix rural & urban with bituminous curbing <br />1. Drainage includes flumes, swales and culverts <br />c. No municipal utilities in project area <br />7. IP 26-08 2026 Neighborhood Pavement Overlay Improvements <br />a. Alpine Woods <br />i. 8 Pedestrian Ramp survey locations <br />ii. Single-family housing development <br />b. Evergreen Point Townhouses 1st & 2nd <br />i. 15 Pedestrian Ramp survey locations <br />ii. Town house development <br />c. Hall -Anderson Acres TH 47 Service Road <br />i. 1 Pedestrian Ramp survey location <br />ii. Single-family house development — low volume cul-de-sac <br />d. Shots required at the concrete joints for concrete walks within the topo area <br />i. Pedestrian Ramp Topo Area needs to be sufficient for ADA improvements <br />1. Assumed 20 feet from center of pedestrian ramp <br />The scope of these surveys each include: <br />a. Topographic Survey <br />b. Contacting Gopher State One Call to locate utility markings <br />c. Delivery of survey points in an Excel/CSV format <br />d. Point Code listing <br />FIELD SURVEY REQUIREMENTS: The field survey is not limited to, but is expected to include the <br />following <br />. <br />• Elevations along the centerline, edge of bituminous pavement, top and bottom of swale, and boulevard up <br />to the right-of-way at 50-foot stations and grade changes <br />o Urban section areas shall include flowline and top back of curb shots <br />• Location and elevations on driveway edges and corners to the right-of-way <br />• Location and elevations of any storm sewer, sanitary sewer, watermain, utilities, structures, etc. within the <br />survey area <br />o Gopher One State locate calls shall be made prior to surveying <br />• Locations and elevations of trees/tree lines, landscaping, mailboxes, signage, fence lines, etc. within the <br />survey area <br />• General top and bottom of slopes, and intermediate spot elevations in swales <br />SCHEDULE: A written schedule of the work shall be submitted identifying all work components and showing <br />work start and completion dates required to comply with the schedule. Once work has commenced, the Contractor <br />shall continuously pursue completion in accordance with the approved schedule. The final Topographic Survey <br />must be delivered to the City by the date listed in the attached proposal sheet. <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.