Laserfiche WebLink
PROPOSAL <br />accepts the terms and conditions herein and agrees to complete all work described herein, and to <br />deliver the final Topographic Surveys to the City by the dates provided below. <br />IP 26-02 2026 MSA Overlay Improvements <br />Topographic Survey & Wetland Boundary Determination due back July 31, 2025 <br />Description Cost Extension <br />Topographic Survey Lump sum not -to -exceed amount <br />Wetland Boundary Determination Lump sum not -to -exceed amount <br />IP 26-03 Carol -Rose Acres & Sports Haven Street Reconstructions <br />Topographic Survey due back August 30, 2025 <br />Description Cost Extension <br />Topographic Survey Lump sum not -to -exceed amount <br />IP 26-04 Countryside Estates Street Reconstructions <br />Topographic Survey due back May 30, 2025 <br />Description <br />Topographic Survey Lump sum not -to -exceed amount <br />IP 26-05 Flintwood Hills 2nd & 3rd Street Reconstructions <br />Topographic Survey due back June 30, 2025 <br />Description <br />Topographic Survey Lump sum not -to -exceed amount <br />IP 26-06 Riverside West Street Reconstructions <br />Topographic Survey due back August 30, 2025 <br />Description <br />Topographic Survey Lump sum not -to -exceed amount <br />IP 26-07 Section 01 Unplatted Street Reconstructions <br />Topographic Survey due back June 30, 2025 <br />Description <br />Topographic Survey Lump sum not -to -exceed amount <br />IP 26-08 2026 Neighborhood Overlay Improvements <br />Topographic Survey due back August 30, 2025 <br />Description <br />Topographic Survey Lump sum not -to -exceed amount <br />Contractor Name <br />Owner or representative <br />Phone(s) <br />E-mail <br />Signature <br />Date <br />Cost Extension <br />Cost Extension <br />Cost Extension <br />Cost Extension <br />Cost Extension <br />6 <br />