My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/22/2025
Ramsey
>
Public
>
Agendas
>
Council
>
2025
>
Agenda - Council - 04/22/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2025 3:41:34 PM
Creation date
4/21/2025 10:38:46 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/22/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
389
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. 12. <br />CC Regular Session <br />Meeting Date: <br />04/22/2025 <br />Primary Strategic Plan Initiative: Address infrastructure needs. <br />Title: <br />Adopt Resolution #25-084 Amending the Design Services Proposal from Bolton & Menk, Inc. for Dickenson's <br />Mississippi Estates Street Reconstructions, Improvement Project #25-04 <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to adopt Resolution #25-084 amending the design services proposal from Bolton & <br />Menk, Inc. for Dickenson's Mississippi Estate Street Reconstructions, Improvement Project #25-04. <br />Background: <br />With Resolution #24-196 the Ramsey City Council accepted a design services proposal Dickenson's Mississippi <br />Estates Street Reconstructions, Improvement Project #25-04, from Bolton & Menk for the not -to -exceed amount <br />of $68,537.00. This project scope included replacement of watermain on Tungsten Street between Riverdale <br />Drive and Rivlyn Avenue from the western cul-de-sac to the eastern edge of plat at the connection with <br />Riverwalk Village. <br />With Resolution #24-302 the Ramsey City Council accepted an amendment to the design services proposal to <br />include an alternate bid to replace the watermain loop connection between Riverdale Drive and the west Rivlyn <br />Avenue cul-de-sac. The amendment was for a total amount of $9,296.00. <br />During project design, additional stormwater drainage modeling, right of way analysis and exhibits were <br />necessary beyond the anticipated scope of the original design services proposal. Bolton & Menk has submitted a <br />proposal for these additional services, for a total not -to -exceed amount of $11,062.00. <br />Notification: <br />Notification is not required with this case. <br />Time Frame/Observations/Alternatives: <br />Alternatives: <br />Motion to adopt Resolution #25-084 amending the design services proposal from Bolton & Menk, Inc. for <br />Dickenson's Mississippi Estate Street Reconstructions, Improvement Project #25-04. <br />Funding Source: <br />Funding for this design services amendment is proposed to come from Pavement Management Funds and <br />Stormwater Utility Funds. <br />Recommendation: <br />Staff recommends adopting Resolution #25-084 amending the design services proposal from Bolton & Menk, Inc. <br />for Dickenson's Mississippi Estate Street Reconstructions, Improvement Project #25-04. <br />Outcome/Action: <br />Adopt Resolution #25-084 amending the design services proposal from Bolton & Menk, Inc. for Dickenson's <br />Mississippi Estate Street Reconstructions, Improvement Project #25-04. <br />
The URL can be used to link to this page
Your browser does not support the video tag.