Laserfiche WebLink
Timeframe: <br />Staff estimates up to 10 minutes will be required to present this case and answer questions. <br />Alternatives: <br />Alternative #1 — Motion to adopt Resolution #25-071 Accepting Bids and Awarding a Contract to North Valley, <br />Inc. for the total amount of $1,366,954.38 for High Point Street Reconstructions, Improvement Project #25-05. <br />Alternative #2 — Motion of other. <br />Funding Source: <br />Funding for this improvement is proposed to come from Pavement Management Funds and Storm Water Utility <br />Funds. <br />On April 10, 2025 a total of eight (8) bids were received, opened, and tabulated, and the following bids were <br />found to comply with the advertisement for bids. <br />Contractor Total Bid <br />North Valley, Inc. $1,366,954.38 <br />Douglas -Kerr Underground $1,441,046.72 <br />Park Construction Company $1,446,884.05 <br />GMH Asphalt Corporation $1,448,729.90 <br />Knife River Construction $1,519,715.15 <br />Valley Paving, Inc. $1,532,695.33 <br />Asphalt Surface Technologies Corp. $1,541,443.14 <br />Dresel Contracting, Inc. $1,757,749.71 <br />Engineer's Estimate $1, 853, 622.00 <br />The bid of North Valley, Inc. of Nowthen, Minnesota, in the amount of $1,366,954.38 for the total bid of said <br />improvements in accordance with the approved plans and specifications and advertisement for bids, is the lowest <br />responsible bidder. Adding indirect costs in the amount of 23-percent brings the total project costs to <br />$1,681,353.89. <br />The bid is 26-percent lower than the engineer's estimate, primarily due to lower than anticipated bituminous <br />paving, and concrete curb and gutter prices. <br />Funding Source Breakdown: <br />Funding Source <br />Pavement Management <br />Funds <br />Storm Sewer Utility <br />Funds <br />Project Total <br />Construction Costs Indirect Costs Total Cost <br />$1,058,076.22 $243,357.53 $1,301,433.75 <br />$308,878.16 $71,041.98 $379,920.14 <br />$1,366,954.38 $314,399.51 $1,681,353.89 <br />The CIP level estimate had a total estimated project cost of $1,986,165, which includes street costs of $1,727,100 <br />and storm sewer costs of $259,065. The final project costs may change depending upon bid prices and actual <br />construction quantities. <br />City staff proposes to administer and inspect construction. Plans and specifications were prepared in-house as part <br />of staff's normal duties. <br />Recommendation: <br />