My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/13/2025
Ramsey
>
Public
>
Agendas
>
Council
>
2025
>
Agenda - Council - 05/13/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2025 12:08:24 PM
Creation date
5/8/2025 4:02:38 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/13/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
483
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT B <br />Fees Payable to the City <br />1. Sanitary Sewer Connection (Trunk) Fees. The PERMITTEE is responsible for satisfying <br />applicable Sanitary Sewer Trunk Fee requirements. PERMITTEE must pay a Sanitary Sewer <br />Trunk Fee of Twenty -Eight Thousand Six Hundred Twenty -Five Dollars and Forty Cents <br />($28,625.40) (6.84 acres x $4,185.00). The PERMITTEE acknowledges that these fees are <br />estimates. The rate in effect when this Agreement is recorded will be collected. <br />2. Water Connection (Trunk) Fees. The PERMITTEE is responsible for satisfying applicable Water <br />Trunk Fee requirements. PERMITTEE must pay a Water Trunk Fee of Fifty -One Thousand <br />Seven Hundred Thirty -One Dollars and Ninety -Two Cents ($51,731.92) (6.84 acres x $7,563.00). <br />The PERMITTEE acknowledges that these fees are estimates. The rate in effect when this <br />Agreement is recorded will be collected. <br />3. Stormwater Regional Basin (Infiltration) Contribution. The Subject Property is located within <br />a Drinking Water Supply Management Area (DWSMA) and a 10-year capture. Thus, in lieu of <br />constructing an on -site infiltration basin (infiltration is not permitted within the 10-year capture <br />zone), the PERMITTEE shall contribute an amount equal to the estimated cost of constructing <br />an on -site infiltration basin to the CITY for use of the regional stormwater basin in the amount <br />of Six Thousand Eighty Dollars and Forty Cents ($6,080.40). This amount is based on the <br />Engineer's Estimate prepared by Bogart, Pederson & Associates, Inc., dated April 15, 2025. <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.