My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/13/2025
Ramsey
>
Public
>
Agendas
>
Council
>
2025
>
Agenda - Council - 05/13/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2025 12:08:24 PM
Creation date
5/8/2025 4:02:38 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/13/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
483
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IP 26-04 COUNTRYSIDE ESTATES STREET RECONSTRUCTIONS <br />(Report Due August 1, 2025) <br />Item No. Item Description Unit Quantity Price Extension <br />1 Mobilization LS 1 <br />2 Geotechnical Report LS 1 <br />3 Soil Borings EA 40 <br />4 Soil Boring Additional LF 1 <br />Depth Beyond 10-feet <br />5 Traffic Control LS 1 <br />Total Proposal (Lines 1-5) <br />IP 26-05 FLINTWOOD HILLS 2ND & 3RD STREET RECONSTRUCTIONS <br />(Report Due September 30, 2025) <br />Item No. Item Description Unit Quantity Price <br />1 Mobilization LS 1 <br />2 Geotechnical Report LS 1 <br />3 Soil Borings EA 14 <br />4 Soil Boring Additional LF 1 <br />Depth Beyond 10-feet <br />5 Traffic Control LS 1 <br />Total Proposal (Lines 1-5) <br />Extension <br />IP 26-06 RIVERSIDE WEST STREET RECONSTRUCTIONS <br />(Report Due September 30, 2025) <br />Item No. Item Description Unit Quantity Price Extension <br />1 Mobilization LS 1 <br />2 Geotechnical Report LS 1 <br />3 Soil Borings EA 5 <br />4 Soil Boring Additional LF 1 <br />Depth Beyond 10-feet <br />5 Traffic Control LS 1 <br />Total Proposal (Lines 1-5) <br />IP 26-07 SECTION 01 UNPLATTED STREET RECONSTRUCTIONS <br />(Report Due August 29, 2025) <br />Item No. Item Description Unit Quantity Price Extension <br />1 Mobilization LS 1 <br />2 Geotechnical Report LS 1 <br />3 Soil Borings EA 24 <br />4 Soil Boring Additional LF 1 <br />Depth Beyond 10-feet <br />5 Traffic Control LS 1 <br />Total Proposal (Lines 1-5) <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.