Laserfiche WebLink
future connection from Lano's site. To fully make the connection, the storm sewer stub would cross the south end <br />of Global Gloves' property at 13 601 Tungsten Street. Global Glove informed city staff they are supportive of <br />allowing a future storm sewer connection across the south end of their property and providing the required <br />permanent drainage and utility easement. In the meantime, Lano will continue working with their engineer to <br />design their private on -site stormwater improvements for potential future construction and connection to the <br />12-inch stub provided as part of this project. <br />Alternate Bid <br />Watermain and sanitary sewer extend through 4 private properties from the west end of Rivlyn Avenue to <br />Riverdale Drive, generally under green space and a shared driveway. As an alternate bid, this watermain is <br />proposed to be replaced in the same manner as the watermain under Rivlyn Avenue and Tungsten Street. The <br />private shared driveway is proposed to be replaced to match existing materials, a combination of gravel and <br />bituminous. <br />These public utilities are located under an existing drainage & utility easement. However, while designing the <br />alternate bid, Bolton & Menk indicated additional temporary construction easements would be needed to perform <br />construction. In total, 5,364 square feet of easement spread across the 4 properties will be required, as shown in <br />the attached temporary easement exhibit. <br />During the project design process, staff sent a total of 5 letters to the 4 properties within the alternate bid area, in <br />addition to holding a public open house. Two of the letters, the latest hand -delivered to these properties on April <br />10 th, requested a meeting to discuss the necessary construction easements. To date, staff have been contacted by <br />3 of the 4 property owners, only one of whom is agreeable to providing the required temporary easements to allow <br />the proposed construction to occur. <br />Because the alternate bid work is not located under Rivlyn Avenue, this work could be completed in the future, <br />either in coordination with another watermain improvement project or as a separate project, to avoid delaying the <br />delivery of this project. Staff anticipate minimal to no cost increase to construct these improvements as part of a <br />future project. If the alternate bid is not awarded, staff will add a future watermain replacement project to the <br />Capital Improvement Program and inform the impacted residents of this action. <br />Preliminary Schedule Remaining <br />• Council Awards Contract to the Lowest Responsible Bidder (base bid or base + alternate bid) <br />o May 13, 2025 <br />• Contractor Begins Construction <br />o June / July 2025 <br />• Contractor Substantially Completes Construction <br />o New watermain in-service, new bituminous in -place, topsoil and seed in -place <br />o September 30, 2025 <br />• Contractor Final Completion <br />o Verify final restoration; punch list created <br />o October 31, 2025 <br />Notification: <br />If the Council accepts the bids and awards a contract for construction, letters will be mailed to property owners <br />with updates on the project status. Engineering staff maintain City Improvement project web pages with the most <br />current project information. <br />Time Frame/Observations/Alternatives: <br />