My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/13/2025
Ramsey
>
Public
>
Agendas
>
Council
>
2025
>
Agenda - Council - 05/13/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2025 12:08:24 PM
Creation date
5/8/2025 4:02:38 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/13/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
483
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOLTON <br />& MENK <br />Real People. Real Solutions. <br />May 2, 2025 <br />Joe Feriancek, P.E. <br />Assistant City Engineer <br />City of Ramsey <br />7550 Sunwood Drive NW <br />Ramsey, MN 55303 <br />7533 Sunwood Drive NW <br />Suite 206 <br />Ramsey, MN 55303-5119 <br />Ph: (763) 433-2851 <br />Fax: (763) 427-0833 <br />Bolton-Menk.com <br />RE: Proposal for Construction Related Services — Dickenson's Mississippi Estates — IP 25-04 <br />Dear Mr. Feriancek: <br />We appreciate the opportunity to present this scope of services for the Dickenson's Mississippi <br />Estates Improvements. Our scope and fees were prepared based on our understanding of the project <br />and our previous experience in assisting the City of Ramsey with similar project types. Our proposed <br />services will be as described below: <br />Contract Preparation — Assist with Notice of Award, Contracts, and Notice to Proceed. Prepare sets of <br />contract documents (plans and specifications) for City and Contractor. <br />Pre -Construction Conference — Facilitate the Pre -Construction Conference and address questions that <br />may arise related to project design or construction staking. Prepare Agenda and Minutes. <br />Shop Drawing / Submittal Review — Review submittals for key project components. <br />Construction Staking — Includes the following: <br />• Staking Calculations and Preparation of Data, <br />• Establishing Survey Control, <br />• Staking of Erosion Control, <br />• Staking of Roadways (Edge of Bituminous and Curblines), <br />• Staking of Water Services, <br />• Staking of Water Main and Fittings, and <br />• Staking of Storm Sewer. <br />Pay Application Assistance — Work with City and Contractor to complete payment documents. <br />As -Built Survey and Record Drawings — Survey key project components after completion of construction <br />and prepare of Record Drawings. <br />Construction Revisions / Plan Updates — To be performed as needed during construction. We have <br />assumed a total of 24 hours for this task. <br />We have attached a fee spreadsheet depicting hours, rates, and total compensation on a per task basis. <br />Our proposed Not -To -Exceed fees for the work are $33,940.00. <br />Bolton & Menk is an equal opportunity emptoyer, <br />
The URL can be used to link to this page
Your browser does not support the video tag.