Laserfiche WebLink
0 <br />c <br />u <br /><C <br />C/) <br />LIJ p <br />11. 1,1 <br />w 0,4 <br />E <br />g <br />u_ a, <br />LLO <br />OLLJ o <br />Z <br />0 <br />Lii <br />?- -J <br />0 <br />LU 0. <br />0- <br />0 <br />0 <br />.r) <br />(-4 <br />2015 Adopted <br />CD <br />kr; <br />el <br />CD <br />tri <br />kr) <br />- <br />City of Ramsey Valuation Fee Schedule <br />65% of Bldg. Permit Fee <br />25% of Bldg. Permit Fee <br />65% of Bldg. Permit Fee <br />51.00/hr./Minimum 1 hr. <br />Actual Costs <br />4 <br />/1!) <br />CD <br />4 <br />tr) <br /><= <br />e,j. <br />CD <br />v..1 <br />0 <br />ei <br />C:= <br />e...I <br />2000.001 <br />Electrical Permit Fee Schedule <br />1500.00 <br />City of Ramsey Valuation Fee Schedule <br />25.00 (Zoning Permit) <br />0 <br />el <br />0 <br />- <br />C= <br />4 <br />V) <br />76.50/hr./minimum 2 hr.1 <br />Equal to Permit Fee <br />0 <br />4 <br />It() <br />51.001 <br />CD <br />6 <br />0 <br />C= <br />51.001 <br />60.00 <br />CD <br />_4 <br />C0 <br />el <br />0 <br />— <br />1% of Job Value/Minimum $200.001 <br />1% of Job Value/Minimum $100.00 <br />65% of Comm Mech Permit fee <br />102.001 <br />0 <br />1.111 <br />CZ1 <br />CD <br />ed <br />SPECIAL NOTES <br />1Building Construction <br />Cover 3 trips <br />Garages, Remodels, Additions, etc. <br />All administrative and Overhead Costs <br />Per Tokle Contract <br />Returned when complete - not part of building code <br />Over 6 feet in height <br />Less than 6 feet in height <br />Cover 2 trips <br />11.5 times hourly rate <br />Work Started Without a Permit <br />Cover 1 trip <br />'New Construction <br />1Remodel/Addition <br />1New Construction <br />1Remodel/Addition <br />ch <br />i... <br />0 <br />0 <br />V) <br />el <br />v...d <br />New Construction <br />SERVICE OR LICENSE <br />Administrative Fee -Process Returned Bldg. Permits <br />Basement Finish <br />Building permit <br />Building plan check (65% of bldg. permit) 1997 UBC Table 1A <br />Plan Check Fee for Duplicate Plans <br />Plan Check Fee for Accessory Structures <br />Plan Check Fee for changes, additions, or revisions to plans <br />Plan Check Fee (Outside Contracted) <br />Air Conditioner Replacement <br />Air Conditioner & Furnace Replacement (Combination) <br />Deck Permit <br />Demo Permit <br />Driveway Escrow <br />Electrical Permit Fee <br />Erosion Control Escrow <br />Fence Permit <br />c= <br />Ao <br />U <br />U <br />= <br />U <br />r.1.0 <br />Fireplace Permit <br />Furnace Replacement <br />Inspections -After Hours/Weekend <br />Investigation Fee <br />Gas Line (Residential) <br />Gas Water Heater Replacement <br />Landscape Escrow <br />Lawn Irrigation -Residential <br />Lawn Irrigation -Commercial (Multi) <br />Mechanical Permit -Residential <br />Mechanical permit -Commercial <br />E <br />0. <br />Cd <br />U <br />E <br />U <br />a) <br />E <br />E <br />0 <br />U <br />0 <br />oN' <br />v.) <br />a) <br />U <br />U <br />, ,-,C <br />V <br />= <br />ct <br />Moving Structure Permit <br />Moving Structure Permit Site Inspection <br />Mobile Home Tie Down <br />Mobile Home Water Hookup <br />Plumbing permit- Residential/Single Family <br />