My WebLink
|
Help
|
About
|
Sign Out
Home
2024 Rates, Fees and Charges
Ramsey
>
Finance
>
Rates, Fees and Charges
>
2024 Rates, Fees and Charges
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2025 3:19:57 PM
Creation date
5/20/2025 3:16:57 PM
Metadata
Fields
Template:
Finance
Year
%(Da
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF RAMSEY <br />2024 ADOPTED SCHEDULE OF RATES, FEES AND CHARGES <br />Adopted November 28, 2023 Ordinance #23-17 <br />Page 9 of 10 <br />SERVICE OR LICENSE <br />SPECIAL NOTES <br />2024 Adopted <br />Road Improvement Assessment <br />Per Special Assessment Policy <br />Per Policy <br />Sidewalk Panel Removal and Replacement Escrow <br />2500.00 <br />Street Sweeping: Equipment Only: <br />Per FEMA Schedule of Equipment Rates <br />FEMA Rates <br />Traffic Sign Replacement (each) <br />256.00 <br />Tobacco <br />Cigarette Sales (vending and over -the counter) <br />250.00 <br />Cigarette Sales with age verification technology <br />150.00 <br />E-Cigarette Sales <br />250.00 <br />E-Cigarette Sales with age verification technology <br />150.00 <br />UTILITY RATES <br />Assessment Charge for Unpaid Items Assessed <br />Administration fee <br />35.00/account <br />Interest Rate on Unpaid Items Assessed <br />Based on 1-Year Treasury + 2 Points <br />6% <br />Penalty/late payment <br />Past due on current billing <br />10% <br />Recycling Rates <br />Residential Curb -side Program fee/qtr <br />Per Ace Contract <br />11.94/qtr <br />Sewer Rates <br />Residential/Single dwelling usage fee/qtr <br />Per 2016 Comprehensive Sewer Study <br />91.83 <br />Multi-family(apt) & commercial usage fee/qtr <br />91.83+3.48/1000 gal. in excess of 20,000 gal. <br />Connection charge/res. equivalent <br />based on national/local construction cost index 6/22 3.3% <br />1349.00 <br />Connection charge/acre comm./ind. <br />based on national/local construction cost index 6/22 3.3% <br />4063.00 <br />Lateral Benefit Charges: Residential <br />based on national/local construction cost index 6/22 3.3% <br />5418.00 <br />Lateral Benefit Charges: Commercial <br />based on national/local construction cost index 6/22 3.3% <br />8920.00 <br />Street Lights <br />Developer contribution: <br />Installation of Cobra street light <br />Per Connexus Energy Fee Schedule <br />Traditionaire subdivision street light (w/100 ft of wire) <br />Developer Installed <br />New ROW COR Lights <br />Per Connexus Energy Fee Schedule <br />Street light 0 & M 3 year *) $98.00/year <br />294.00/light <br />Residential billing: <br />Urban subdivision street light rate per lot (>7/92) <br />9.01/qtr <br />Rural subdivision street light rate per lot <br />14.85/qtr <br />Priority street light rate per residential/apartment/ lot <br />1.37/qtr <br />Storm Water Management Rates <br />Residential <br />16.75/qtr <br />Commercial <br />66.99/REU/qtr <br />Trunk charge/res. equivalent <br />based on national/local construction cost index 6/22 3.3% <br />534.00 <br />Trunk charge/acre comm./ind. <br />based on national/local construction cost index 6/22 3.3% <br />5321.00 <br />Water Rates <br />Minimum usage fee/qtr <br />Per 2012 & 2017 Comprehensive Water System Study <br />49.90/qtr <br />Quarterly Rate Structure <br />Conservation Rates <br />$49.90 Minimum <br />$3.42 per 1,000 for 15,001-25,000 <br />$3.53 per 1,000 for 25,001-40,000 <br />$3.78 per 1,000 for 40,001-60,000 <br />$4.04 per 1,000 for 60,001-99,000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.