|
Category
<br />City of Ramsey, Minnesota
<br />Capital Improvement Program
<br />2011 thru 2015
<br />PROJECTS BY CATEGORY
<br />Project# Priority 2011 2012 2013 2014 2015 Total
<br />Water Utility Improvement
<br />WM Looping: Alpine Dr. (CSAH 5 to Germanium St.) 04-WTR-001 6 100,000 100,000
<br />Renovate Pump House 2 04-WTR-004 5 49,000 49,000
<br />Complete Pump House 3 04-WTR-005 6 60,000 60,000
<br />RTC Bunker Lake Blvd (Armstrong to Ramsey Blvd) 04-WTR-009 6 225,000 225,000
<br />Water Treatment Plant Construction 04-WTR-017 6 9,700,000 8,700,000 18,400,000
<br />Watermain Looping: (Ramsey Blvd to Armstrong Blvd) 04-WTR-018 6 226,100 226,100
<br />1.5 MG Ground Storage Reservoir 05-WTR-004 6 2,000,000 2,000,000
<br />Well Rehabilitation 07-WTR-001 6 24,000 26,000 28,000 30,000 32,000 140,000
<br />River Pines Lift Station Water Connection 08-WTR-003 6 20,000 20,000
<br />Water Meter Replacement 08-WTR-004 6 237,300 249,200 486,500
<br />Well House I Improvements 09-WTR-001 6 8,000 8,000
<br />C.R. 57 / Alpine Drive Watermain Looping 11-WTR-001 6 35,000 35,000
<br />Magnesium Street Watermain Looping 11-WTR-002 6 35,000 35,000
<br />Fire Station #1 Extension of Water 11-WTR-003 6 15,000 15,000
<br />Water Utility Improvement Total
<br />GRAND TOTAL
<br />414,300 2,500,200 9,954,100 8,850,000 81,000 21,799,600
<br />414,300 2,500,200 9,954,100 8,850,000 81,000 21,799,600
<br />Revised 12/2010
<br />Page 267
<br />
|