Laserfiche WebLink
Category <br />City of Ramsey, Minnesota <br />Capital Improvement Program <br />2011 thru 2015 <br />PROJECTS BY CATEGORY <br />Project# Priority 2011 2012 2013 2014 2015 Total <br />Water Utility Improvement <br />WM Looping: Alpine Dr. (CSAH 5 to Germanium St.) 04-WTR-001 6 100,000 100,000 <br />Renovate Pump House 2 04-WTR-004 5 49,000 49,000 <br />Complete Pump House 3 04-WTR-005 6 60,000 60,000 <br />RTC Bunker Lake Blvd (Armstrong to Ramsey Blvd) 04-WTR-009 6 225,000 225,000 <br />Water Treatment Plant Construction 04-WTR-017 6 9,700,000 8,700,000 18,400,000 <br />Watermain Looping: (Ramsey Blvd to Armstrong Blvd) 04-WTR-018 6 226,100 226,100 <br />1.5 MG Ground Storage Reservoir 05-WTR-004 6 2,000,000 2,000,000 <br />Well Rehabilitation 07-WTR-001 6 24,000 26,000 28,000 30,000 32,000 140,000 <br />River Pines Lift Station Water Connection 08-WTR-003 6 20,000 20,000 <br />Water Meter Replacement 08-WTR-004 6 237,300 249,200 486,500 <br />Well House I Improvements 09-WTR-001 6 8,000 8,000 <br />C.R. 57 / Alpine Drive Watermain Looping 11-WTR-001 6 35,000 35,000 <br />Magnesium Street Watermain Looping 11-WTR-002 6 35,000 35,000 <br />Fire Station #1 Extension of Water 11-WTR-003 6 15,000 15,000 <br />Water Utility Improvement Total <br />GRAND TOTAL <br />414,300 2,500,200 9,954,100 8,850,000 81,000 21,799,600 <br />414,300 2,500,200 9,954,100 8,850,000 81,000 21,799,600 <br />Revised 12/2010 <br />Page 267 <br />