My WebLink
|
Help
|
About
|
Sign Out
Home
2012 - 2016
Ramsey
>
Finance
>
Capital Improvement Program
>
2012 - 2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2025 2:04:24 PM
Creation date
5/22/2025 1:55:11 PM
Metadata
Fields
Template:
Finance
Year
%(Da
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
339
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Capital Improvement Program <br />City of Ramsey, Minnesota <br />2012 thru 2016 <br />Project # <br />06-BLDG-001 <br />Project Name Public Works Campus Building Improvements <br />Description <br />Department Capital Impr Bonding Projects <br />Contact <br />Type <br />Useful Life <br />Category <br />Priority <br />Status <br />Total Project Cost: <br />Buildings <br />50 Years <br />Capital Improvement Bonding <br />6-Planned <br />Active <br />$11,000,000 <br />This project contemplates acquisition of 25 acres for a new public works campus and construction <br />of the community. The 2006 salt storage building can be relocated to the site. <br />CIP Act Criteria: <br />1. Conditions of City Infrastructure and Need for the Project: <br />The present public works site is landlocked and current size cannot be expanded to <br />meet expected future growth. <br />2. Demand for Improvement: <br />As described above, the site doesn't meet the needs of the future. <br />3. Costs of the Improvement: <br />Land : $3,000,000 <br />Building: $8,000,000 <br />4. Availability of Public Resources: <br />The project may be funded by a combination of general property tax levy and available <br />resources on hand. In addition, the bonds would be secured by the City's full faith <br />and credit. <br />5. Relative Costs and Benefits of Alternative Uses of the Funds: <br />There are no significant alternatives for funds designated for this project. <br />6. Operating Costs of the Proposed Investments: <br />There would be no operating costs for the first five years. The land will be held <br />and developed as growth occurs. <br />7. Options for Shared Facilities with Other Cities or Local Government: <br />Not applicable; the site currently exists and is located next to current PW facil <br />8. Level of Overlapping Debt: <br />ty. <br />of the first phase of buildings to serve the needs <br />Justification <br />The City population is projected to continue to grow. Staff has polled other municipalities that are currently the size of Ramsey's projected <br />growth. This proposed area is the median size for a public works campus. The present campus is land locked and cannot be expanded to meet this <br />median size. This project anticipates land acquisition and the start of a public works campus that can grow as the city grows. <br />Revised 10/2011 <br />PAGE 29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.