Laserfiche WebLink
Category <br />City of Ramsey, Minnesota <br />Capital Improvement Program <br />2013 thru 2017 <br />PROJECTS BY CATEGORY <br />Project# Priority 2013 2014 2015 2016 2017 Total <br />Water Utility Improvement <br />WM Looping: Alpine Dr. (CSAH 5 to Krypton St) 04-WTR-001 6 100,000 100,000 <br />Renovate Pump House 2 04-WTR-004 5 49,000 49,000 <br />Complete Pump House 3 04-WTR-005 6 60,000 60,000 <br />The COR Bunker Lake Blvd (Armstrong - Ramsey Blvd) 04-WTR-009 6 225,000 225,000 <br />Water Treatment Plant Construction 04-WTR-017 6 9,700,000 8,700,000 18,400,000 <br />Watermain Looping: (Ramsey Blvd to Armstrong Blvd) 04-WTR-018 6 521,000 521,000 <br />1.5 MG Ground Storage Reservoir 05-WTR-004 6 2,000,000 2,000,000 <br />Well Rehabilitation & Pump Replacement 07-WTR-001 6 58,000 30,000 32,000 35,000 38,000 193,000 <br />River Pines Lift Station Water Connection 08-WTR-003 6 20,000 20,000 <br />Fire Station #1 Extension of Water 11-WTR-003 6 25,000 25,000 <br />Watermain Sunfish Lk Blvd 12-WTR-001 6 350,000 350,000 <br />Water Utility Improvement Total 579,000 380,000 2,032,000 10,085,000 8,867,000 21,943,000 <br />GRAND TOTAL <br />579,000 380,000 2,032,000 10,085,000 8,867,000 21,943,000 <br />Revised 10/2012 <br />PAGE 273 <br />