My WebLink
|
Help
|
About
|
Sign Out
Home
2013 - 2017
Ramsey
>
Finance
>
Capital Improvement Program
>
2013 - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2025 2:15:44 PM
Creation date
5/22/2025 2:07:54 PM
Metadata
Fields
Template:
Finance
Year
%(Da
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
323
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Capital Improvement Program <br />City of Ramsey, Minnesota <br />2013 tlirzz 2017 <br />Project # 10-BLDG-001 <br />Project Name Fire Station #2 Rebuild <br />Description <br />Department Capital Impr Bonding Projects <br />Contact <br />Type Buildings <br />Useful Life 50 Years <br />Category Capital Improvement Bonding <br />Priority 6-Planned <br />Status Active <br />Total Project Cost: $2,581,000 <br />This project encompasses the rebuilding of the current Fire Station #2. Planned location for new construction is along Alpine Dr. Project cost does <br />not include demo of old city hall and police station. <br />CIP Act Criteria: <br />(Conditions of City Infrastructure and Need for the Project: Currently the building has been scheduled for replacement due to the current <br />condition not meeting the needs of a fire station. Also the current building and property are being actively marketed for demolition/rebuild for a <br />willing buyer. <br />2Demand for Improvement: Current facility has many issues including inadequate space, HVAC system needs, domestic water problems, etc. A <br />2.4 acre site adjacent to this property has been chosen as a replacement site. <br />3Costs of the Improvement: <br />Land/Building/Construction: $2,491,000 <br />4Availability of Public Resources: The project may be funded by a combination of general property tax levy and available resources on hand. In <br />addition, the bonds would be secured by the City's full faith and credit. <br />5Relative Costs and Benefits of Alternative Uses of the Funds: There are no significant alternatives for funds designated for this project. <br />60perating Costs of the Proposed Investments: Operating costs will be comparable or less than the current building largely due to heating/cooling <br />systems being more efficient than the current site. Also, much smaller square footage will be involved with a new buiding verse heating and <br />cooling the entire "old city hall". <br />70ptions for Shared Facilities with Other Cities or Local Government: Options for mutal use include a planned space for police patrol to use as a <br />report writing location. Also, future may see ambulance service staging from this location. <br />8Level of Overlapping Debt: <br />Justification <br />Too little space, unsafe condition in old fire station, on -going problems with HVAC systems, water problems in parts of building. <br />Prior <br />90,000 <br />Total <br />Prior <br />90,000 <br />Expenditures <br />2013 2014 2015 2016 2017 Total <br />Building Cost/Construction 2,241,000 <br />Furnishings/Equipment 110,000 <br />Other 140,000 <br />2,241,000 <br />110,000 <br />140,000 <br />Total <br />2,491,000 2,491,000 <br />Funding Sources 2013 2014 2015 2016 2017 Total <br />CIP Bonding <br />2,491,000 2,491,000 <br />Total Total 2,491,000 2,491,000 <br />Revised 10/2012 <br />PAGE 30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.