Laserfiche WebLink
Category Project# Priority 2014 2015 2016 2017 2018 Total <br />River Storm Water Discharge Treatment 11-STRM-002 6 75,000 75,000 75,000 75,000 75,000 375,000 <br />Whispering Pines Estates Plat 2 Storm Sewer 11-STRM-003 6 330,000 330,000 <br />Stormwater Drainage Improvements 12-STRM-001 6 30,000 350,000 30,000 410,000 <br />Storm Sewer South of Bunker Lake Blvd 13-STRM-001 6 250,000 250,000 <br />Storm Water Utility Improvement Total <br />Street Improvement <br />1 <br />455,000 175,000 1,565,000 205,000 425,000 2,825,000 <br />Annual Street Reconstruction Program 04-STR-001 6 1,000,000 2,200,000 2,200,000 2,200,000 2,200,000 9,800,000 <br />McKinley Street 04-STR-006 6 1,235,000 1,235,000 <br />North Highway 10 Frontage Road 04-STR-007 5 440,000 440,000 <br />Zeolite Roadway Improvements 04-STR-012 6 400,000 400,000 <br />COR Bunker Lake Blvd (Armstrong to Ramsey Blvd) 04-STR-014 6 3,500,000 3,500,000 <br />Variolite Street (Alpine Dr. to Ramsey Town Ctr.) 04-STR-018 6 1,700,000 1,700,000 <br />County Road 5/Alpine Drive Realignment & Signals 06-STR-002 6 1,567,000 1,567,000 <br />Single Road Access Areas 06-STR-003 6 25,000 25,000 25,000 25,000 25,000 125,000 <br />Veterans Drive Streetscape 08-STR-002 5 240,000 240,000 <br />River Pines Lift Station Street Connection 08-STR-005 6 55,000 55,000 <br />Bunker Lake Blvd Sunwood Drive Signal 12-STR-001 6 225,000 225,000 <br />Bunker Lake Blvd Extension 12-STR-003 6 2,000,000 2,000,000 <br />167th Avenue Extension 12-STR-004 6 1,500,000 1,500,000 <br />Garnet Street Reconstruction 12-STR-005 6 1,200,000 1,200,000 <br />Riverdale Drive Extension Traprock - Armstrong 12-STR-007 6 2,168,000 2,168,000 <br />Reconstruct Riverdale Drive to Tungston Street 12-STR-008 6 1,350,000 1,350,000 <br />Construct Center Street (COR) 14-STR-001 6 650,369 650,369 <br />Street Improvement Total <br />Street Light Utility Improvement <br />1 <br />Priority D Street Lights <br />Street Light Utility Improvement Total <br />05-STLT-001 <br />Water Utility Improvement <br />1 <br />WM Looping: Alpine Dr. (CSAH 5 to Krypton St.) 04-WTR-001 <br />Renovate Pump House 2 04-WTR-004 <br />Complete Pump House 3 04-WTR-005 <br />The COR Bunker Lake Blvd (Armstrong - Ramsey Blvd) 04-WTR-009 <br />Water Treatment Plant Construction 04-WTR-017 <br />Watermain Looping: (Ramsey Blvd to Armstrong Blvd) 04-WTR-018 <br />1.5 MG Ground Storage Reservoir 05-WTR-004 <br />Well Rehabilitation & Pump Replacement 07-WTR-001 <br />River Pines Lift Station Water Connection 08-WTR-003 <br />Fire Station #1 Extension of Water 11-WTR-003 <br />Watermain Sunfish Lk Blvd 12-WTR-001 <br />REFURBISH WATER TOWER #2 14-WTR-001 <br />REFURBISH WATER TOWER #1 14-WTR-002 <br />PUMP HOUSE #1 BUILDING REPAIRS 14-WTR-003 <br />6,610,369 4,850,000 6,960,000 6,775,000 2,960,000 28,155,369 <br />6 15,000 15,000 15,000 15,000 15,000 75,000 <br />15,000 15,000 15,000 15,000 15,000 75,000 <br />6 100,000 100,000 <br />5 49,000 49,000 <br />6 60,000 60,000 <br />6 350,000 350,000 <br />6 9,700,000 8,700,000 18,400,000 <br />6 521,000 521,000 <br />6 2,000,000 2,000,000 <br />6 30,000 32,000 35,000 38,000 41,000 176,000 <br />6 20,000 20,000 <br />6 25,000 25,000 <br />6 350,000 350,000 <br />6 1,300,000 1,300,000 <br />6 1,300,000 1,300, 000 <br />6 20,000 20,000 <br />Revised 10/2012 <br />Page 20 <br />