My WebLink
|
Help
|
About
|
Sign Out
Home
2014 - 2018
Ramsey
>
Finance
>
Capital Improvement Program
>
2014 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2025 2:25:47 PM
Creation date
5/22/2025 2:18:24 PM
Metadata
Fields
Template:
Finance
Year
%(Da
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
326
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Capital Improvement Program <br />City of Ramsey, Minnesota <br />2014 thru 2018 <br />Project # 14-IT-003 <br />Project Name IT PW-UTI SWITCH REPLACEMENT <br />Description <br />Department Eqpt Replacement <br />Contact <br />Type Eqpt Replacement <br />Useful Life 3 <br />Category Eqpt Replacement <br />Priority 6-Planned <br />Status Active <br />Total Project Cost: $8,000 <br />Replacement of existing firewalls and data switches at MAIN public works facility <br />Justification <br />Our firewall and data switches are in need of replacement. The equipment currently in place is over six years old and is approaching their expected <br />useful life. Upgrading this equipment will improve the city's network infrastructure, allowing us to utilize faster speeds to increase productivity as <br />well as safeguard us against unexpected failure from aging equipment. <br />Expenditures <br />2014 2015 2016 2017 2018 Total <br />Furnishings/Equipment <br />8,000 8,000 <br />Total 8,000 8,000 <br />Funding Sources 2014 2015 2016 2017 2018 Total <br />Equipment Revolving Fund 8,000 8,000 <br />Total <br />8,000 8,000 <br />Revised 10/2012 <br />Page 41 <br />
The URL can be used to link to this page
Your browser does not support the video tag.