Laserfiche WebLink
Capital Improvement Program <br />City of Ramsey, Minnesota <br />2015 thru 2019 <br />Project # 15-STR-002 <br />Project Name Andrie Street/164th Lane Reconstruction <br />Type Improvement <br />Useful Life 60 Years <br />Category Street Improvement <br />Description <br />Department Street Improvements <br />Contact <br />Priority 6-Planned <br />Status Active <br />Total Project Cost: $2,100,100 <br />Includes reconstruction of Andrie Street and 164th Lane between Alpine Drive and Jarvis Street, including a 6 foot on -road bike lane. <br />Total Project Cost = $3,120,700 <br />Street Improvement: $2,100,100 <br />Storm Improvement: $1,020,600 <br />68 properties eligible for special assessments <br />Justification <br />These streets are in poor condition and require reconstruction. The pavement has deteriorated beyond the point where an overlay could be <br />applied. This project will install concrete curb and gutter and an on -street bike lane. Storm sewer will be added where necessary to protect the <br />pavement. The current roadway has standing water during certain seasons which weakens the pavement. <br />Expenditures <br />2015 2016 2017 2018 2019 Total <br />Improvements Other than <br />Building Cost <br />2,100,100 2,100,100 <br />Total <br />Funding Sources <br />2,100,100 2,100,100 <br />2015 2016 2017 2018 2019 Total <br />GO Bonding (Road Funding) <br />1,658,100 1,658,100 <br />Special Assessment - Bonded 442,000 442,000 <br />Total <br />2,100,100 2,100,100 <br />Page 164 <br />