Laserfiche WebLink
Category <br />City of Ramsey, Minnesota <br />Capital Improvement Program <br />2015 thru 2019 <br />PROJECTS BY CATEGORY <br />Project# Priority 2015 2016 2017 2018 2019 Total <br />Water Utility Improvement <br />Complete Pump House 3 <br />The COR Bunker Lake Blvd (Armstrong - Ramsey Blvd) <br />Water Treatment Plant Construction <br />Watermain Looping: (Ramsey Blvd to Traprock St.) <br />1.5 MG Ground Storage Reservoir <br />Well Rehabilitation & Pump Replacement <br />River Pines Lift Station Water Connection <br />Fire Station #1 Extension of Water <br />Watermain Sunfish Lk Blvd <br />REFURBISH WATER TOWER #2 <br />REFURBISH WATER TOWER #1 <br />BUNKER/PUMA WATER TRUNK EXT <br />Garnet Street Reconstruction <br />Water Utility Improvement Total <br />GRAND TOTAL <br />04-WTR-005 6 60,000 60,000 <br />04-WTR-009 6 350,000 350,000 <br />04-WTR-017 6 9,786,010 9,786,010 19,572,020 <br />04-WTR-018 6 400,000 400,000 <br />05-WTR-004 6 2,000,000 2,000,000 <br />07-WTR-001 6 32,000 35,000 38,000 41,000 44,000 190,000 <br />08-WTR-003 6 20,000 20,000 <br />11-WTR-003 6 55,000 55,000 <br />12-WTR-001 6 450,000 450,000 <br />14-WTR-001 6 1,300,000 1,300,000 <br />14-WTR-002 6 1,300,000 1,300,000 <br />14-WTR-003 6 700,000 700,000 <br />15-WTR-001 6 170,000 170,000 <br />257,000 1,545,000 3,808,000 11,127,010 9,830,010 26,567,020 <br />257,000 1,545,000 3,808,000 11,127,010 9,830,010 26,567,020 <br />Page 177 <br />