Laserfiche WebLink
• Rental license regulations were adopted effective January 1 2024. In 2024, a <br />Rental Inspection Policy was adopted to outline the inspection process from <br />notification to what areas of rental units are inspected. <br />Strategy: Improve the safety and mobility of transportation corridors <br />• Objective 1: Advance the Ramsey Gateway Plan <br />o Responsible Parties: Engineering <br />o Key Areas: Hwy 10 corridor from Sunfish Lake Boulevard to Ramsey Boulevard <br />■ Action 1.1: Construct grade separated interchanges <br />■ Planning efforts concluded in 2023 on the Ramsey Gateway Project for <br />construction to occur in 2024 & 2025. The interchanges would eliminate at <br />grade crossings of the BNSF Railroad and Hwy 10. Additionally the project <br />eliminates direct driveway access to Hwy 10 by constructing frontage roads. <br />• Objective 2: Update Priority Street Light Program <br />o Responsible Parties: Engineering <br />o Key Areas: Critical Intersections and pedestrian cro Sings. <br />• Action 1.1: Improve intersection safety by addressing street lighting needs. <br />• As road projects are designed, staff considers additional necessary <br />improvements to the area like streetlights to ensure added safety at <br />intersections and pedestrJ n crossings. <br />17 <br />