My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/27/2025
Ramsey
>
Public
>
Agendas
>
Council
>
2025
>
Agenda - Council - 05/27/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2025 11:13:55 AM
Creation date
5/23/2025 10:32:38 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/27/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
440
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
$s SOUR <br />SAUTER & SONS EXCAVATING, INC <br />SONS <br />.4..--.:01,to <br />May 13, 2025 <br />City of Ramsey <br />7550 Sunwood Drive NW <br />Ramsey, MN 55303 <br />Excavation, Grading & Demolition <br />6651 141st Ave. NW, Ramsey, MN 55303 <br />Phone: (763) 421-7919 • Fax: (763) 421-0797 • Email: office@sauterexc.com <br />Attn: Aaron Madsen - amadsen@ci.ramsey.mn.us <br />Re: Twinkle Lights <br />Bid Includes: <br />• Clear Gopher One Locates <br />• Mobilize equipment & supplies to the jobsite <br />• Mobilize 3-4 days prior to work to mark the excavation area with white paint and flags to clear <br />locates <br />• Clear all "known" private locates <br />• Expose all known locates <br />• Horizontal Bore 885 feet, furnish and pull back 2-inch HDPE along the north side of Sunwood Drive <br />NW crossing Sapphire St NW <br />• Furnish and Install (3) # 10 Awg Conductors <br />• Stub conduit into existing HH on the east end <br />• Right of way City of Ramsey Utility Permit <br />• Pour back and finish concrete removed for pot holing <br />Total Bid Number: $29,455.00 <br />Bid Does Not Include: <br />• Asphalt replacement by others, unless listed above in a line item <br />• Traffic control, cones, signs, or flagman <br />• Replacement of sidewalk due to equipment being driven on it <br />• Does not include ground thawing unless listed above in a line item <br />• Responsibility for any damage to existing irrigation/ sprinkler systems <br />• This bid does not include any permit fees that may be necessary <br />• This bid does not include excessive rocks/shale, if encountered, will need to add the extra work to <br />the original bid on a time and material basis <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.