Laserfiche WebLink
5. 15. <br />CC Regular Session <br />Meeting Date: <br />05/27/2025 <br />Primary Strategic Plan Initiative: Promote economic growth and development. <br />Title: <br />Adopt Resolution #25-119 Approving Change Order No. 34 for Improvement Project #20-11, Ramsey Gateway <br />Highway 10 Improvements <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to adopt Resolution #25-119 approving Change Order No. 34 for Improvement Project <br />#20-11, Ramsey Gateway Highway 10 Improvements. <br />Background: <br />In 2023, construction began on the Ramsey Gateway Highway 10 project, which includes grade separation of <br />Highway 10 at the intersections of Sunfish Lake Boulevard and Ramsey Boulevard, frontage road improvements <br />on both sides of Highway 10, and grade separation of the Burlington Northern Santa Fe (BNSF) railway crossings <br />of Ramsey Boulevard and Sunfish Lake Boulevard. Construction of this project is scheduled for completion by <br />the Spring of 2026. <br />Numerous City utilities have been and will continue to be constructed and/or reconstructed as part of this project <br />per the approved construction plans. During the project, a new, larger storm sewer outfall to the Mississippi River <br />was constructed south of Riverdale Drive to accommodate added runoff from Highway 10. Therefore, the <br />existing smaller outfall pipe and apron are no longer needed and can be removed. However, the plans did not <br />reflect this work so a change order is required. <br />Ames Construction will provide all labor, equipment and material to remove the existing storm sewer run and <br />river outfall as well as restoration of the disturbed area including the replacement of concrete curb & gutter, <br />bituminous pavement and boulevard turf along Riverdale Drive. <br />Change Order No. 34 addresses the required storm sewer removal work as identified in this case and in attached <br />Change Order No. 34, which has been signed by representatives from the Minnesota Department of <br />Transportation (MnDOT) and Ames Construction. <br />Time Frame/Observations/Alternatives: <br />Adopt Resolution #25-119 approving Change Order No. 34 for Improvement Project #20-11, Ramsey Gateway <br />Highway 10 Improvements. <br />Funding Source: <br />The Extra Work associated with Change Order No. 34 will increase project costs in the amount of $115,759.60. <br />Payment for the storm sewer removal, structure removal and all restoration work will be made at contract unit <br />prices and negotiated unit prices, and will be funded through the project at no additional cost to the city. <br />Recommendation: <br />Engineering staff recommend approving Change Order No. 34. <br />Outcome/Action: <br />