Laserfiche WebLink
Minnesota Department Of Transportation <br />Report Printed Date: 3/24/2025 <br />Contract: 230502 Change Order No.: 0034 Net Change Order Amount: $115,759.60 <br />Prime Contractor: Ames Construction, Inc., 0000207855 Spec Book Year: 20 <br />CO Type: COLevel2 Awarded Contract Amount: $99,848,562.81 Funding Source: SA <br />State Proj. No.: 0202-116 Resident Engineer: Dan Penn <br />Fed. Proj. No.: 0010340 Admin Office: MC -Golden Valley North West <br />District: M Metro County: C002 ANOKA Route: CSAH 56, 57 <br />Reason: 1402.5 Extra Work <br />Location: CSAH 56 (RAMSEY BLVD.) AND CSAH 57 (SUNFISH LAKE BLVD.) OVER T.H. 10 AND BNSF RAILWAY IN ANOKA AND RAMSEY. <br />Description: Mississippi River Outfall Removal <br />Explanation: <br />Issue The plan includes the existing pipe draining to the South at Structure 5300, towards the Mississippi River, to be abandoned, taking the outfall to the Mississippi offline at <br />this location. However, the plans do not include the remaining storm sewer run to the River and outfall structure to be removed. <br />Resolution Per the direction of the City of Ramsey with concurrence from Anoka County the existing storm sewer run from drainage structure 5300 to the existing river outfall will be <br />removed. The Contractor will provide all labor, equipment and material to remove the existing storm sewer run and river outfall as well as restoration of the disturbed area <br />including curb & gutter, bit paving, and turf establishment. <br />Entitlement The Engineer and Anoka County have determined the contract needs to be revised in accordance with MnDOT Specification 1402.5 Extra Work. <br />Impact The Contractor will perform the storm sewer and outfall removal and restore the disturbed area within NPDES timelines and prior to the Stage 3 open to traffic date of <br />October 15, 2025. <br />This change order covers the known and anticipated costs and contract time adjustment (if any) attributable to the work covered by this Change Order. If the Contractor <br />incurs unknown and unanticipated additional work that affects costs or impacts the critical path, the contractor reserves the right to request an adjustment to the contract <br />amount or contract time in accordance with MNDOT 1402. <br />Cost The Engineer and Anoka County have reviewed and approve of the cost associated with this Change. <br />Payment Payment for the storm sewer removal, structure removal and all restoration will be made at contract unit prices and negotiated unit prices. <br />Increases/Decreases <br />Item Description <br />Project Contract Quantity <br />Item ID Line Line Project Category Item Source Inc/Dec <br />Unit Unit Price Dollar Amount <br />Total: <br />$0.00 <br />Contract: 230502 <br />Change Order No.: 0034 <br />Page 1 of 5 <br />