Laserfiche WebLink
STORM WATER POLLUTION <br />PREVENTION PLAN (SWPPP) <br />ALPINE DRIVE RECONSTRUCTION <br />S.A.P. 199-106-012 & 199-107-010 <br />CITY OF RAMSEY <br />ANOKA COUNTY, MINNESOTA <br />RAMSEY, <br />ANOKA COUNTY, <br />,_MINNESOTA <br />DESCRIPTION OF CONSTRUCTION ACTIVITIES AND STORMWATER MANAGEMENT: <br />Construction activities include; Site Grading, Storm Sewer Construction, Temporary Erosion and Sediment <br />Control, Roadway Construction, and Permanent Stabilization. <br />Project Description: This project consists of reconstruction of 1.02 miles of existing bituminous streets <br />including spot replacement of concrete curb and gutter. The drainage for the existing streets uses storm <br />sewer inlets at low points. The proposed runoff will be collected in storm sewer inlets in the curb and gutter, <br />and routed to the same low points. There is no change to the outfall location of the storm water runoff <br />proposed with this project. <br />RESPONSIBLE PARTIES: <br />The Contractor and Owner must apply for coverage under the MPCA's General Storm Water Permit for <br />Construction Activity as required by the National Pollution Discharge Elimination System (NPDES) Phase II <br />program. Coverage under the permit will begin automatically 7 calendar days after the electronic submittal <br />date or after the postmarked date of a complete application. (Longer time frames will apply to areas <br />disturbing 50 acres or discharge within 1 mile of a special water). <br />COMPANY <br />CONTACT PERSON <br />PHONE <br />OWNER: <br />CITY OF RAMSEY <br />BRUCE WESTBY, PE <br />763-433-9825 <br />SWPPP DESIGNER: <br />CITY OF RAMSEY <br />JOE FERIANCEK, PE <br />763-433-9893 <br />CONTRACTOR: <br />STIE MANAGER: <br />PARTY RESPONSIBLE FOR <br />LONG TERM O&M: <br />CITY OF RAMSEY <br />BRUCE WESTBY, PE <br />763-433-9825 <br />Individuals listed above, including the SWPPP preparer, individual overseeing implementation of, revising <br />and amending the SWPPP, Individuals performing or supervising the installation, maintenance and repair of <br />BMP's must be trained. At least one individual present on the permitted project, or available within 72 hours <br />shall be trained in the applicable job duties. Documentation showing training commensurate with the job <br />duties and responsibilities is required to be included in the SWPPP prior to any work beginning on the site. <br />Copies of the SWPPP preparer information is included in the Project Manual. The Contractor shall provide <br />information for the individual(s) overseeing implementation, supervising installation, maintenance, and <br />repair of BMP's to be included in the Project Manual prior to the start of construction. This information shall <br />be kept up to date until the project NOT is filed. <br />Documentation shall include: <br />a. Names of trained personnel associated with this project. <br />b. Dates of training, names of instructor(s) and entity providing training. <br />c. Content of training course or workshop including the number of hours trained. <br />d. As an alternative to a, b, and c listed above, a photocopy of the current Erosion and Stormwater <br />Management card issued by the University of Minnesota can be attached to the SWPPP as suitable <br />documentation of training. <br />DOCUMENTATION RETENTION: <br />The following documentation will be retained for a period of not less than 3-years from the date of submittal <br />of the NOT. <br />1. The final SWPPP. <br />2. Copies of all stormwater related permits required for the project. <br />3. Records of all inspection and maintenance conducted during construction. <br />4. Copies of all permanent operation and maintenance agreements; including all right-of-way, contracts, <br />covenants and other binding requirements regarding perpetual maintenance. <br />5. All required calculations for design of temporary and permanent BMP's. <br />IMPLEMENTATION SCHEDULE AND PHASING: <br />1. Furnish & Install perimeter sediment control and inlet protection. <br />2. Reclamation of existing bituminous pavement. <br />3. Rough grade site. <br />4. Furnish & install bituminous pavement. <br />5. Add additional temporary BMP's as necessary during construction based on inspection reports. <br />6. Submit Notice of Termination (NOT) to MPCA within 30 days of final stabilization. <br />FINAL STABILIZATION: <br />The permittee(s) must ensure final stabilization of the site. The permittee(s) must submit a NOT within 30 <br />days after final stabilization is complete, or another owner/operator (permittee) has assumed control over <br />all areas of the site which have not undergone final stabilization. Final stabilization can be achieved in one of <br />the following ways: <br />1. All soil disturbing activities at the site have been completed and all soils must be stabilized by a uniform <br />perennial vegetative cover with a density of 70 percent over the entire pervious surface area, or other <br />equivalent means necessary to prevent soil failure under erosive conditions and; <br />a. All drainage ditches, constructed to drain water from the site after construction is complete, must be <br />stabilized to preclude erosion; <br />b. All temporary synthetic, and structural erosion prevention and sediment control BMP's (such as silt <br />fence) must be removed as part of the site final stabilization; and <br />c. The permittee(s) must clean out all sediment from conveyances and from temporary sedimentation <br />basins to be used as permanent water quality management basins. Sediment must be stabilized to <br />prevent it from being washed back into the basin, conveyances or drainage ways discharging off -site <br />or to surface waters. The cleanout of permanent basins must be sufficient to return the basin to design <br />capacity. <br />2. Final vegetation cover shall be in the Project Specifications. <br />3. For residential construction only, final stabilization has been achieved when temporary erosion protection <br />and down gradient perimeter control for individual lots has been completed and the residence has been <br />transferred to the homeowner. Additionally, the permittee must distribute the MPCA "Homeowner fact <br />sheet" to the homeowner to inform the homeowner of the need for, and benefits of, final stabilization. <br />SPECIAL ENVIRONMENTAL CONSIDERATIONS: <br />Was an environmental review required for this project or any part of a common plan of development or sale that includes <br />all or any portion of this project? <br />NO <br />Does any portion of the site have the potential to affect threatened or endangered species? <br />NO <br />Does any portion of this site discharge to a Calcareous Fen and the letter of approval from the DNR is located in the <br />Project Manual? <br />NO <br />Will any portion of this site potentially affect properties listed on the National Register of Historic Places or a Known or <br />Discovered Archeological site? <br />NO <br />Have any Karst features been identified in the project vicinity? <br />NO <br />Is compliance with temporary or permanent stormwater management design requirements infeasible for this project? <br />NO <br />POLLUTION PREVENTION MANAGEMENT MEASURES: <br />The permittee(s) shall implement the following pollution prevention management measures on the site: <br />1. Solid waste: collected sediment, asphalt and concrete millings, floating debris, paper, plastic, fabric, <br />construction and demolition debris and other wastes must be disposed of properly and must comply with <br />MPCA disposal regulations. <br />2. Hazardous materials: oil, gasoline, paint and any hazardous substances must be properly stored, including <br />secondary containment, to prevent spills, leaks or other discharge. Restricted access to storage areas <br />must be provided to prevent vandalism. Storage and disposal of hazardous waste must be in compliance <br />with MPCA regulations. <br />3. External washing of trucks and other construction vehicles must be limited to a defined area of the site. <br />Runoff must be contained and waste properly disposed of. No engine degreasing is allowed on site. <br />GENERAL STORMWATER DISCHARGE REQUIREMENTS: <br />All requirements listed in Part 15 of the permit for the design of permanent stormwater treatment system <br />and discharge have been included in the preparation of this SWPPP. These include but are not limited to: <br />1. The expected amount, frequency, intensity and duration of precipitation. <br />2. The nature of stormwater runoff and run-on at the site. <br />3. Peak flow rates and stormwater volumes to minimize erosion at outlets and downstream channel and <br />stream bank erosion. <br />4. The range of soil particle sizes expected to be present on the site. <br />RECEIVING WATERS: <br />Recieving waters, including surface water, wetlands, Public Waters, and stormwater ponds are identified on <br />the USGS 7.5min quad map within 1 mile of the project boundary. Receiving waters that are impaired, the <br />impairment and WLA are listed as follows. All specific BMP's relative to construction activities listed in this <br />permit for special and impaired waters have been incorporated into this plan. All specific BMP's listed in <br />approved TMDLs and those BMP's listed for construction related waste load allocations have also been <br />incorporated. <br />NAME OF WATER <br />BODY <br />TYPE (DITCH, POND, <br />WETLAND, LAKE, <br />ETC.) <br />APPENDIX A SPECIAL <br />WATER? <br />FLOWS TO <br />WATER <br />WITHIN 1 MILE? <br />USEPA APPROVED <br />TMDL? <br />TMDL? <br />RUM RIVER <br />RIVER <br />YES <br />YES <br />YES <br />IMPAIRMENTS: DO; FISHESBIO; INERTBIO <br />PROJECT AREAS: <br />Total project size (disturbed area) = <br />Existing area of impervious surface = <br />Post construction area of impervious surface = <br />New impervious surface area created = <br />Planned construction start date: <br />Planned construction completion date: <br />PROJECT LOCATION: <br />6.59 <br />5.56 <br />5.56 <br />0.00 <br />acres <br />acres <br />acres <br />acres <br />June 2025 <br />October 2025 <br />County: ANOKA Township: 32 Range: 25 Section: 16 Latitude: 45.248537 Longitude: -93.416690 <br />PERMANENT STORMWATER MANAGEMENT SYSTEM: <br />Type of storm water management used if more than 1 acre of new impervious surface is created: <br />a. Wet Sedimentation Pond <br />b. Infiltration / Filtration <br />c. Regional Pond <br />d. Permanent Stormwater Management Not Required <br />LOCATION OF SWPPP REQUIREMENTS IN PROJECT PLAN: <br />DESCRIPTION <br />LOCATION <br />TEMPORARY EROSION CONTROL MEASURES <br />SHEETS No. 20 - 27 <br />FINAL STABILIZATION <br />SHEETS No. 20 - 27 <br />STORM SEWER TABULATION <br />SHEETS No. 03 <br />EROSION AND SEDIMENT CONTROL DETAILS <br />SHEETS No. 20 - 27 <br />EROSION AND SEDIMENT CONTROL QUANTITIES: <br />DESCRIPTION <br />QUANTITY <br />BASE BID <br />ALT BID <br />SILT FENCE TYPE MS <br />5143 LF <br />583 LF <br />INLET PROTECTION <br />20 EA <br />4 EA <br />RANDOM RIP RAP CLASS III <br />12 CY <br />- <br />EROSION BLANKET CATEGORY 20 <br />2326 SY <br />52 SY <br />CONSTRUCTION EXIT <br />4 EA <br />- <br />CERTIFICATION: <br />UNIVERSITY OF MIN`'ESOTR <br />Joe Feriancek <br />Design or cunslttldwn SWPPP {May 31 2023r <br />LEGEND <br />PROJECT LIMITS <br />1 MILE LIMIT <br />RECEIVING WATER <br />IMPAIRED WATER <br />Erosion and Stormwater <br />Management <br />The nog. MT. ca d t aeon [mad and is cwt5ed In Iha <br />areaisi 6hna'h an the r/ronrsa dThis cad. Csrnfiration mans - <br />ton chess swear Oar each Gran. son arm <br />DATE <br />REVISION <br />I hereby certify that this plan, specrfication, or report was prepared <br />by me or under my direct supervision and that I am a duly Licensed <br />Professional Engineer u er the of the St of Minnesota <br />!�JOE FERIANCEK <br />Date 03721/25 <br />Lic No 57095 <br />DESIGNED BY: <br />JJF <br />DRAWN BY: <br />JJF <br />DATE <br />03/21/25 <br />CHECKED BY: <br />JJF <br />FILE <br />25-03 <br />CITY OF RAMSEY <br />7550 SUNWOOD DRIVE <br />RAMSEY, MN 55303 <br />(763) 427-1410 FAX (763) 433-9898 <br />SWPPP <br />S.A.P. 199-106-012 / S.A.P 199-107-010 <br />ALPINE DRIVE RECONSTRUCTION <br />CITY PROJECT NO. 25-03 <br />CITY OF RAMSEY, MINNESOTA <br />SHEET <br />18 <br />OF <br />84 <br />