Laserfiche WebLink
DATE <br />o <br />START S.A.P. 199-107-010 <br />STA. 247+49.50 <br />246+s �247+00 <br />V) <br />LEGEND <br />PR. MAJOR CONTOUR <br />PR. MINOR CONTOUR <br />DRAINAGE ARROW <br />EX. MAJOR CONTOUR <br />EX. MINOR CONTOUR <br />CONSTRUCTION LIMIT <br />DRAINAGE & UTILITY EASEMENT <br />RIGHT OF WAY LINE <br />SECTION LINE <br />REVISION <br />"I <br />,,,,,1 <br />[ELLLLLLi <br />LLLLLLL� <br />INLET PROTECTION (2) <br />15290 <br />ROCK CONSTRUCTION EXIT <br />RANDOM RIP RAP CLASS III <br />HYDRO -MULCH SEEDING <br />ALT BID - HYDRO -MULCH SEEDING <br />EROSION CONTROL BLANKET <br />ALT BID - EROSION CONTROL BLANKET <br />INLET PROTECTION <br />ALT BID - INLET PROTECTION <br />SILT FENCE <br />ALT BID - SILT FENCE <br />I hereby certify that this plan, specrfication, or report was prepared <br />by me or under my direct supervision and that I am a duly Licensed <br />Professional Engineer u er the of the St of Minnesota <br />Joe Feria ncek <br />Date 03/21/25 Lic No 57095 <br />DESIGNED BY: <br />JJF <br />I I <br />15291 <br />I I <br />I I <br />ROCK CONSTRUCTION EXIT <br />SEE DETAIL SHEET 07. <br />NOTE: <br />1. SILT FENCE MUST BE INSTALLED BEFORE ANY REMOVAL ACTIVITIES <br />ON -SITE. <br />2. STORM SEWER INLET PROTECTION IS TO BE INSTALLED IMMEDIATELY <br />FOLLOWING CASTING INSTALLATION. FOR EXISTING INLETS, MUST BE <br />INSTALLED PRIOR TO ANY REMOVAL ACTIVITIES. INLET PROTECTION MUST <br />BE MAINTAINED UNTIL TURF ESTABLISHMENT IS APPROVED. <br />3. ROCK CONSTRUCTION EXITS MUST BE MAINTAINED THROUGHOUT THE <br />PROJECT. <br />4. THE CONTRACTOR IS RESPONSIBLE FOR SWEEPING ANY SOIL/DEBRIS <br />TRACKING ONTO ADJACENT STREETS WITHIN 3 HOURS OF NOTIFICATION <br />FROM THE CITY. <br />DRAWN BY: <br />CHECKED BY: <br />JJF <br />JJF <br />cnrE <br />03/21/25 <br />FILE <br />25-03 <br />City of <br />RAMSEY <br />CITY OF RAMSEY <br />7550 SUNWOOD DRIVE <br />RAMSEY, MN 55303 <br />(763) 427-1410 FAX (763) 433-9898 <br />15290 <br />5. RESTORATION AREAS ARE SHOWN IN A GENERAL MANNER ONLY. <br />6. RESTORE ALL DISTURBED AREAS WITH 4" TOPSOIL, MNDOT RESIDENTIAL <br />TURFGRASS MIX, AND HYDRAULIC MATRIX TYPE MULCH UNLESS MARKED <br />FOR EROSION CONTROL BLANKET. <br />7. RESTORE AREAS MARKED FOR EROSION CONTROL BLANKET WITH 4" <br />TOPSOIL, MNDOT WET DITCH MIX, AND ROLLED EROSION PREVENTION <br />CATEGORY 20. <br />8. STOCKPILING OF ANY SALVAGED TOPSOIL USED INCIDENTAL TO THE <br />TOPSOIL PAY ITEM. <br />9. CONTRACTOR IS RESPONSIBLE FOR RESTORING ALL LANDSCAPING TO AS <br />GOOD OR BETTER CONDITION. PAYMENT MADE UNDER LANDSCAPE <br />RESTORATION. <br />GRADING & EROSION CONTROL <br />S.A.P. 199-107-010 <br />ALPINE DRIVE RECONSTRUCTION <br />CITY PROJECT NO. 25-03 <br />CITY OF RAMSEY, MINNESOTA <br />SHEET <br />20 <br />84 <br />SHEETS <br />