Laserfiche WebLink
Timeframe: <br />Staff anticipates up to 10 minutes will be required to present this case and answer any questions. <br />Alternatives: <br />Alternative #1 — Motion to adopt Resolution #25-104 accepting bids and awarding contract for 2025 <br />Neighborhood Pavement Overlay Improvements, Improvement Project #25-07 to North Valley, Inc. for the base <br />and alternate bid total of $1,198,056.75. <br />Alternative #2 — Motion to adopt Resolution #25-104 accepting bids and awarding contract for 2025 <br />Neighborhood Pavement Overlay Improvements, Improvement Project #25-07 to North Valley, Inc. for the base <br />bid total of $1,103,739.67. <br />Alternative #3 — Motion of other. <br />Funding Source: <br />Funding for this improvement is proposed to come from Pavement Management Funds and Storm Water Utility <br />Funds. The alternative bid trail improvements are anticipated to be funded through budgeted 2025 Trail <br />Maintenance Funds. The final project costs may change from the estimate depending upon actual construction <br />quantities. <br />On May 21, 2025 a total of six (6) bids were received, opened and tabulated, and the following bids were found <br />to comply with the advertisement for bids. <br />Contractor <br />Base Bid <br />Alternate Bid <br />Total Bid <br />North Valley, Inc. <br />$1,103,739.67 <br />$94,317.08 <br />$1,198,056.75 <br />Park Construction Company <br />$1,111,868.75 <br />$88,421.50 <br />$1,200,290.25 <br />GMH Asphalt Corporation <br />$1,157,236.93 <br />$106,267.50 <br />$1,263,504.43 <br />Asphalt Surface Technologies <br />Corp. <br />$1,163,502.55 <br />` <br />$106,408.30 <br />$1,269,910.85 <br />Knife River Corporation — <br />North Central <br />$1,348,587.41 <br />$86,395.00 <br />$1,434,982.41 <br />C.S. McCrossan Construction <br />Inc. <br />$1,500,004.15 <br />$106,228.70 <br />$1,606,232.85 <br />Engineer's Estimate <br />$1, 205, 249.35 <br />$88,137.50 <br />$1, 293, 386.85 <br />The bid of North Valley, Inc. of Nowthen, Minnesota, in the amount of $1,198,056.75 for the total bid of said <br />improvements in accordance with the approved plans and specifications and the advertisement for bids is the <br />lowest responsible bidder. Adding indirect costs in the amount of 14-percent brings the total project costs to <br />$1,365,784.70. <br />The low bid is 8 percent lower than the engineer's estimate, primarily due to lower than anticipated bituminous <br />paving and concrete walk costs. <br />Funding Source Breakdown: <br />Funding Source <br />Construction Costs <br />Indirect Costs <br />Total Costs <br />Pavement Management Funds <br />$1,014,405.05 <br />$142,016.71 <br />$1,156,421.75 <br />Water Utility Funds <br />$13,075.64 <br />$1,830.59 f <br />$14,906.23 <br />Sanitary Sewer Utility Funds <br />$23,119.74 <br />$3,236.76 <br />$26,356.50 <br />Storm Sewer Utility Funds <br />$53,139.24 <br />$7,439.49 <br />$60,578.74 <br />Alt Bid Trail (Budgeted Maint. <br />Funds) <br />$94,317.08 <br />$13,204.39 <br />$107,521.47 <br />Project Total w/Alt <br />$1,198,056.75 <br />$167,727.95 <br />$1,365,784.70 <br />