My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 04/15/2025
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2025
>
Agenda - Public Works Committee - 04/15/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2025 2:49:21 PM
Creation date
5/29/2025 1:42:01 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
04/15/2025
Tags
OCRed
Description:
Used to identify documents that are OCRed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.2. <br />Public Works Committee <br />Meeting Date: 04/15/2025 <br />Primary Strategic Plan Initiative: Not Applicable <br />Title: <br />Receive Updates on Improvement Projects, Studies and Items of Interest <br />Purpose/Background: <br />The purpose of this case is to update the Public Works Committee on current and proposed City, County and <br />MnDOT improvement projects and studies, and on other items of interest to the Committee. <br />City Improvement Projects <br />2026 Pavement Management Program Projects <br />• Working to obtain needed topographic surveys, geotechnical evaluations and utility testing <br />#26-01 MSA Bunker Lake Boulevard Reconstruction <br />• 2026 construction <br />• See separate case <br />#25-01 Rivers Bend Regional Stormwater Pond Improvements <br />• Construction complete <br />• Received 2 grant payments from Anoka Conservation District (ACD) totaling $325,550 <br />• Project close out Spring 2025 <br />#25-02 MSA Sunwood Drive Reconstruction — CSAH 5 to Erkium Street <br />• Contract awarded to North Valley, Inc. for $272,962.90 <br />• 2025 construction <br />#25-03 MSA Alpine Drive Reconstruction — CSAH 57 to TH 47 <br />• See separate case <br />#25-04 Dickenson's Mississippi Estate Street Reconstruction <br />• 2025 construction <br />• Bid opening May 1st <br />#25-05 High Point Street Reconstruction <br />• 2025 construction <br />• Bids advertised <br />#25-06 Sorteberg's Street Reconstruction <br />• 2025 construction <br />• Contract awarded to Park Construction Co. for $423,698.35 <br />#25-07 2025 Neighborhood Pavement Overlay Improvements <br />
The URL can be used to link to this page
Your browser does not support the video tag.