My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 05/20/2025
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2025
>
Agenda - Public Works Committee - 05/20/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2025 2:48:52 PM
Creation date
5/29/2025 1:43:10 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
05/20/2025
Tags
OCRed
Description:
Used to identify documents that are OCRed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.1. <br />Public Works Committee <br />Meeting Date: 05/20/2025 <br />Primary Strategic Plan Initiative: Not Applicable <br />Title: <br />Receive Updates on Improvement Projects, Studies and Items of Interest <br />Purpose/Background: <br />The purpose of this case is to update the Public Works Committee on current and proposed City, County and <br />MnDOT improvement projects and studies, and on other items of interest to the Committee. <br />City Improvement Projects <br />2026 Pavement Management Program Projects <br />• Obtaining/reviewing topographic surveys, geotechnical evaluations and utility testing <br />#26-01 MSA Bunker Lake Boulevard Reconstruction <br />• Preparing plans and specifications <br />• 2026 construction <br />#25-01 Rivers Bend Regional Stormwater Pond Improvements <br />• Construction complete <br />• Project close out Summer 2025 <br />#25-02 MSA Sunwood Drive Reconstruction — CSAH 5 to Erkium Street <br />• Construction in progress <br />• Substantial completion anticipated by May 30th <br />#25-03 MSA Alpine Drive Reconstruction — CSAH 57 to TH 47 <br />• Bid opening May 21st <br />• 2025 construction <br />#25-04 Dickenson's Mississippi Estate Street Reconstruction <br />• Executing contracts / scheduling preconstruction meeting <br />• Construction anticipated to begin late June/early July <br />#25-05 High Point Street Reconstruction <br />• Construction will commence soon <br />#25-06 Sortebergs Street Reconstruction <br />• Construction scheduled to begin May19th <br />#25-07 2025 Neighborhood Pavement Overlay Improvements <br />• Bid opening May 21st <br />
The URL can be used to link to this page
Your browser does not support the video tag.