My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 05/20/2025
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2025
>
Agenda - Public Works Committee - 05/20/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2025 2:48:52 PM
Creation date
5/29/2025 1:43:10 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
05/20/2025
Tags
OCRed
Description:
Used to identify documents that are OCRed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
#24-13 Fox Ridge Estates 1st and 2nd Additions Street Reconstruction <br />• Construction in progress <br />• Substantial completion Summer 2025 <br />#24-14 Ramsey Gateway Mississippi River Outfall Removal <br />• 2025 construction <br />• Change Order 34 to IP #20-11, Ramsey Gateway Highway 10 Improvements <br />#24-51 TH 47 Trail Gap Connection —142nd Avenue to Xkimo Street <br />• Bolton & Menk prepared plans and specs for 10' trail construction <br />• Meeting with MnDOT soon to discuss cost contribution and project schedule <br />#23-19 COR Infrastructure Improvements <br />• Construction complete <br />• Punch list items are being addressed <br />#23-20 COR Mass Grading <br />• Construction complete <br />• Waiting for seed to germinate before issuing final payment <br />#21-09 Centralized Water Treatment Plant <br />• Construction in progress <br />• Substantial completion October 15, 2025 <br />• Final completion December 31, 2025 <br />#20-11 Ramsey Gateway Highway 10 Improvements <br />• Sunfish Lake Blvd grade separations (RR and TH10) substantially complete <br />• Ramsey Blvd grade separations (RR and TH10) construction in progress <br />• Final completion anticipated June 2026 <br />• Project webpage hops://www.anokacountymn.gov/3918/Hwy-lORamsey-Blvd-Interchange <br />City of Anoka Improvement Projects <br />Ferry Street (Trunk Highway 47) Grade Separation of BNSF Rail Crossing <br />• City -led project <br />• $45M in bonds authorized October 2020 <br />• 2028 construction anticipated <br />Highway 47 Corridor Improvements — Garfield St to Bunker Lk Blvd <br />• Combined with above City -led project <br />• 3-lane design <br />• Received regional solicitation funds for 2027 construction <br />• Permanent signal system at McKinley Street <br />• Construction proposed for 2027 - 2029 <br />
The URL can be used to link to this page
Your browser does not support the video tag.