My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/10/2025
Ramsey
>
Public
>
Agendas
>
Council
>
2025
>
Agenda - Council - 06/10/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2025 10:01:01 AM
Creation date
6/9/2025 9:20:00 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/10/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
490
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Scope <br />This project proposes to remove and replace the colored concrete pedestrian crossings along Sunwood Drive <br />between Zeolite Street and Rhinestone Street. Impacted existing pedestrian ramps will also be replaced as <br />necessary to bring them to current ADA design standards. <br />The proposed replacements will include removing the colored concrete pavement plus 1-foot to either side. This <br />will both create a clean joint to match into, as well as remove the existing dowel bars. Standard concrete <br />pavement, with clear curing compound will be placed. Staff is researching recommended panel sizing, the current <br />smaller 2'x2' panel sizes are not recommended to be put back. <br />Standard 3' x 10' pedestrian crosswalk block markings are proposed to be placed at all crossings. This will match <br />the crosswalk markings used throughout the City, matching what drivers expect to see at crossings. This <br />consistency can have an overall safety benefit for pedestrians. <br />Repairs outside of replacing the colored concrete are not proposed with this project. The CIP includes a concrete <br />repair project in 2029 which will address the remaining concrete patching along Sunwood Drive and Rhinestone <br />Street. <br />The severe crack across the drive lanes at 7533 Sunwood Drive, approximately 250 feet east of Sapphire Street, is <br />not proposed to be addressed with this project. Due to the timing of this project, public works staff are proposing a <br />separate repair project for the summer of 2025. This repair will include removing the damaged concrete pavement <br />and backfilling with bituminous pavement. With the flexibility of bituminous pavement, the tenting observed over <br />recent years should be temporarily addressed. During the 2029 improvement project, a permanent repair is <br />proposed to be performed. <br />Additional Permitting <br />Sunwood Drive is an MSA street, which requires review and approval by the MnDOT MSA department prior to <br />bidding the project. Staff is anticipating 3 to 4 weeks for MSA approval after plans are finalized. No other permits <br />are anticipated. <br />Project Timelines <br />City Staff is proposing to prepare plans and specifications for this project in-house, as part of their normal duties. <br />The following are the proposed general project timelines: <br />• June 10, 2025 City Council orders plans and specifications <br />• June / July 2025 Staff prepares plans / MnDOT MSA review <br />• August 2025 City Council approves plans and authorizes advertisement for bids <br />• Aug. / Sep. 2025 City Council award construction contract <br />• After Sep. 6, 2025 Begin Construction <br />• Sep. / Oct. 2025 Construction <br />If for any reason, plans were not ready for bidding in August to start in early September, they would be available <br />for early winter bidding and early spring 2026 construction. <br />Notification: <br />if City Council orders plans and specifications for this improvement project, staff will send notification letters to <br />residents impacted by these improvements. <br />Time Frame/Observations/Alternatives: <br />
The URL can be used to link to this page
Your browser does not support the video tag.